MAURY USCG vessel records Sign in
← All vessels

AUGUSTA

AUGUSTA is a 2003 tank ship. The Coast Guard has recorded 54 inspections since 2003, most recently in December 2019, along with 33 deficiencies and 9 operational controls.

Records from 2003 to 2019. Most recent: inspection, 19 December 2019.

Built
2003
Last inspected
19 December 2019
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9256236 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
642385
Flag
MARSHALL ISLANDS
—
Maury page id
psix-642385

Inspections, by type

…with no type recorded20
Years with a record 14 calendar years (2003–2019)
The 54 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it40763 - Convention (Subpart B), Gross Ton
72344 - Dead Weight, Metric Ton
86148 - Displacement, Metric Ton
20395 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 54

19 December 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6876718
31 October 2019 ISPS III Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6844478
31 October 2019 Bulk Liquid Transfer Monitor
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6847322
28 October 2019 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6843419
20 September 2019 COC-TVE Annual · Deficiency Check · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6811153
17 September 2019 Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6814332
24 April 2019 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6669678
6 September 2018 In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6533886
29 July 2018 In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6493894
27 July 2018 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6491976
26 July 2018 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6502798
1 July 2018 Ballast Water Examination · COC-TVE Renew · ISPS II Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6459895
23 September 2017 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6272653
29 July 2017 ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6224121
23 March 2017 Ballast Water Examination · ISPS II Exam · COC-TVE Annual · COE-Dockside
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6106500
16 March 2016 COC-CHEM & TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5834791
5 February 2016 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5810371
3 February 2016 ISPS II Exam · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5809172
23 June 2012 Deficiency Check · PI Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4352895
22 June 2012 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4359878
11 December 2011 Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4206116
23 August 2011 COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4119275
28 January 2010 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3671495
15 January 2010 COE-Dockside
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3662370
12 March 2009 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3432342
2 December 2008 Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3372893
4 November 2008 COC-TVE Renew · PII Safety Exam · MARPOL Annex I Examination · Deficiency Check · ISPS III Exam · MARPOL Annex V Examination · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3356869
8 August 2008 In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3295465
21 July 2008 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3274655
21 May 2008 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3212813
25 January 2008 ISPS II Exam · COC-TVE Annual · MARPOL Annex I Examination · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3125881
6 June 2007 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2953411
12 October 2006 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2799403
9 October 2006 Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2796824
20 July 2006 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2719285
10 October 2005 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2511355
6 September 2005 ISPS II Exam · COC-TVE Annual
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2485544
16 February 2005 Administrative Inspection
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2293854
17 December 2004 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2261077
24 November 2004 NPV Safety Exam
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2247764
30 October 2004 PII Safety Exam
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2231430
20 August 2004 ISPS II Exam · COC-TVE Annual
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2174010
18 August 2004 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2169879
16 August 2004 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2167661
24 July 2004 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2143595
4 July 2004 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2121425
30 June 2004 ISPS II Exam
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2116921
14 May 2004 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2067761
2 January 2004 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1973362
2 January 2004 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1973663
18 October 2003 Type not recorded
No type recorded · GROUP HONOLULU · USCG Oceania District (CGD-O) · Activity 1931380
18 October 2003 Type not recorded
No type recorded · USCGC ASSATEAGUE (WPB 1337) · USCG Oceania District (CGD-O) · Activity 1940787
19 September 2003 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1904251
12 August 2003 Certificate of Compliance
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1873872

Deficiency record · 33

02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 31 October 2019 Resolved
Manholes and flush scuttles in position 1 or 2 within superstructures other than enclosed superstructures shall be closed by substantial covers capable of being made watertight. PSCO observed No. 6 cargo hold tank was hissing and allowing air to escape. Ensure the hatch is watertight and not allowing the escape or entrance of any material. Vessel was currently loading cargo that has a flashpoint greater than 60 degrees celsius. Load Line part 3 Annex I 18.1 17 a
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 October 2019
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Master stated that pipe and valve connecting gasket replaced and valve adjusted.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 31 October 2019 Resolved
Every company should develop, implement, and maintain a safety management system which includes the following functional requirements: instuctions and procedures to ensure safe operation of ships and protection of the enviornment in compliance with relevant international and flag State legislation. PSCO observed the crew was not follwing their VMS cargo procedures. The loading procedures require a person to man the manifold at all times during cargo operation, and the PSC team saw no crew member manning the manifold upon arrival to the vessel. Additionally, Part A 10 of the vessel's ship to shore checklist was acknowledged that "scuppers on board are effectively plugged and drip trays in position are empty" despite excessive leak of the manifold containment drain. Provide corrective action plan within 30 days with concurence from Certificate Issuing Authority ensuring proper cargo transfer procedures and documentation are being maintained. Solas 78 (a) 2014 (cons) Ix/3.1 ISM Code 1.4.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 November 2019
Resolved 31 October 2019
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Master stated that as an action plan avoid the above situation. Owner provided a training.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 October 2019 Resolved
A tank vessel with a capacity of 250 or more barrels that is carrying oil or hazardous material as cargo must have a mechanical means of closing each drain and scupper in the container or enclosed deck area required by this section. PSCO observed gasket leak on the containment drain. 33 CFR 155.310 (a)(3)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 31 October 2019
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 31 October 2019 Resolved
All steering gear components and the rudder stock shall be of sounds and reliable construction to the satisfaction of the Administration. Special consideration shall be given the suitability of essential componenet which is not duplicated. PSCO observed the steering gear unit hunting back and fourth while operating on pump No. 1 during the steering test. Solas 74 (a) 2004 (cons)I/29.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 31 October 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 31 October 2019 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the sea or persons on board. PSCO observed the No. 3 starbord ballast tank and the No 1. double bottom tank flame screens were damaged. Solas 74 (a)2014 (cons)/11a
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 31 October 2019
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 28 October 2019 Resolved
The means for securing and maintaining weathertightness shall be to the satisfaction of the Administration. #1 HFO tank (port side) manhole cover bolts and securing hardware (16 of 26 bolts and nuts) have wasted away. ICLL I/16(4)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 19 December 2019
Resolution: Received class report attesting to the replacement of all corroded hardware securing manhole cover of #1 HFO tank (port side).
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Safety and environment policy
Issued 21 September 2019 Resolved
74 SOLAS (2014) IX/3.1 The company and the ship shall comply with the requirements of the International Safety Management Code. For the purpose of this regulation, the requirements of the Code shall be treated as mandatory. The company should ensure that the policy is implemented and maintained at all levels of the organization, both ship-based and shore-based. PSCO identified leaks on the main engine, service generators, in the purifier room, and in cargo pump room, detailed in deficiency #2, #3, #4. As stated in the SMS under General FFE Maintenance Process listed in section 9.5.1.3, "the Master is responsible for reporting defects to the Company immediately." The crew failed to report these items as required by the SMS. These identified deficiencies are evidence that the ship and/or company are not meeting the SMS requirements. Recommend external audit. 30abc
Action required: 30 - Ship detained
Resolved 24 September 2019
Resolution: Received flag report and conducted def check. ISM audit was conducted and all deficiencies were rectified.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 September 2019 Resolved
74 SOLAS (2001) II-2/62.8.1 Special consideration shall be given to the design and location of scrubber and blowers with relevant piping and fittings in order to provent flue gas leakages into enclosed spaces. The inert gas blowers have multiple holes in the casing. 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 September 2019
Resolution: Received flag report and conducted def ckeck. Holes properly repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 September 2019 Resolved
74 SOLAS (2014) I-1/11(a) The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.PSCO identified multiple installed soft patches on tsea water cooling lines in the engine room. 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 September 2019
Resolution: Received flag report and conducted def check. Soft patched properly repaired.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 21 September 2019 Resolved
74 SOLAS (2001) II-2/4.1.2 The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: means shall be provided to limit the accumulation of flammable vapours. PSCO identified active leaks on the suction side of fuel oil transfer piping in the engine room bilge. 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 September 2019
Resolution: Received flag report and conducted def check.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 21 September 2019 Resolved
74 SOLAS (2001) II-2/3.3.3 "A" Class divisions are those divisions formed by bulkheads and decks which comply with the following: they shall be so constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. PSCO identified A-class doors that were incapable of closing in several locations. 10c
Action required: 10 - Deficiency Rectified
Resolved 21 September 2019
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 21 September 2019 Resolved
74 SOLAS (2001) II-2/4.1.1 The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: means shall be provided to control leaks of flammable liquids. PSCO identified active fuel leaks on the main diesel engine and fuel oil pooling around the cylnder heads. 10c
Action required: 10 - Deficiency Rectified
Resolved 21 September 2019
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 20 September 2019 Resolved
74SOLAS (2001) II-2/4.2.2 In a ship in which oil fuel is used, the arrangements for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. PSCO identified active fuel leaks on the #3 ship's service diesel generator. 1/2 inch deep of fuel oil and lube oil was identified on top of the cylinder valves. Fuel and lube oil was draining to the bilge beneath the generator and had pooled to a depth of approximately 3 inches beneath the generator. - 30abc
Action required: 30 - Ship detained
Resolved 24 September 2019
Resolution: Received flag report and conducted def check.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 September 2019 Resolved
74SOLAS (2001) II-2/4.1.2 The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: means shall be provided to limit the accumulation of flammable vapours. PSCO identified evidence of active leaks from the cargo stripping pump in the cargo pump room. Crew rigged hoses to drain product from the stripping pump to 5 gallon buckets in the bilge of the cargo pump room. PSCO identified partially filled 5 gallon buckets of product, pooled product and cargo residue in the cargo pump room flat. - 30abc
Action required: 30 - Ship detained
Resolved 24 September 2019
Resolution: Received flag report and conducted def check.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 20 September 2019 Resolved
74SOLAS(2001)- II-2/4.2.2 In a ship in which oil fuel is used, the arrangements for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. PSCO identified active fuel leaks from the fuel oil transfer pumps in the purifier room. Additionally, crew had rigged catchment basins beneath the transfer pumps to capture leaking fuel oil. 30abc
Action required: 30 - Ship detained
Resolved 24 September 2019
Resolution: Recieved flag report and conducted def check.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 6 September 2018 Resolved
No person shall conduct an oil or hazardous material transfer operation unless: all connections in the transfer system are leak free. On 05SEP18, the vessel experienced a discharge of product during cargo transfer operations due to a pinhole leak in the MARPOL line (between frames 69 to 71). 33CFR156.120(p) The vessel shall not use the Marpol line while in U.S. waters until repaired and the deficiency is cleared by the USCG.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 September 2018
Resolved 24 September 2018
Resolution: Received Lloyd's Register Class Report (Uploaded in Documents). Damaged section of MARPOL Line renewed and pressure tested with class certification. Rectified deficiency to the satisfaction of Class and the USCG.
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2017 Resolved
1230-Satisfactory means shall be provided for the protection of the crew in getting to and from their quarters, the machinery space, and all other parts used in the necessary work of the ship. Found multiple areas of wastage on catwalks that pose a hazard to the crew. icll66, Reg.25.4 50ac
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 April 2017
Resolved 15 April 2017
Resolution: PSC Houston received a class report from LR satisfying the requirement.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 17 March 2016 Resolved
Vapor sampling line is broken
Condition: Damaged By Earlier Event
Action required: 15 - Rectify deficiencies by next port
Due 17 March 2016
Resolved 20 May 2016
Resolution: Class survey certificate submitted attesting to rectification of deficiency. Sampled Point Valve on VECS line replaced on completion was tested under pressure to satisfaction state of master and report of pressure test are available on board.
Engineering › Electric Propulsion System › Remote Control Circutry
Issued 5 February 2016 Resolved
The propeller shall be fully controllable from the navigation bridge. Lost remote control from navigation bridge. 09SOLAS (CONS.) II-1/31.2.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 February 2016
Resolution: Vessel submitted class report affirming ahead and astern directions from bridge, engine control room, and the engine found satisfactory.
Engineering › Diesel Engine (propulsion-direct drive) › Pump, High Pressure (fuel injection)
Issued 23 June 2012 Resolved
When a defect is discovered which affects the safety or efficiency of the equipment, RO shall be notified to investigate. Ship suffered loss of propulsion while testing main engine on low sulfur marine gas oil 2 miles from pilotage area. Techs from engine manufacturer must attend to investigate and recommend solutions to LSMGO problems with M/E propulsion prior to return to US as per class report
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 25 June 2012
Resolved 27 July 2012
Resolution: Recieved e-mail report from ship''s captain with findings from engine manufacturer reps. Vessel has ordered fuel cooler to be installed. Deficiency rectified.
Electrical › Electric Generation Source (emergency) › Generator
Issued 23 June 2012 Resolved
When emergency source of electrical power is a genrator, it shall be driven by a prime mover with an independent fuel supply and automatically start. During test of EDG, start failed due to an abundance of water in fuel tank. Water was drained and EDG started after 30 minutes of correction.
Action required: 705 - Other - as specified
Due 23 June 2012
Resolved 23 June 2012
Resolution: Corrected on the spot.
Navigation › Collision/Grounding Avoidance › Radar
Issued 23 August 2011 Resolved
Vessel's X Band radar is not operational; the vessel is required to have a secondary radar vessel is required to have repairs carried out prior to departure to the satisfaction of the USCG.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 August 2011
Resolution: Received tech report from attesting to satisfactory repairs of the vessels secondary radar and operational test.
Lifesaving › Immersion Suits › Not on Board
Issued 4 November 2008 Resolved
Vessel does not have an immersion suit for 2-1/2 year old passenger onboard vessel. Provide an immersion suit of adequate size and maneuverability for passenger prior to next US port after sailing foreign to the satisfaction of USCG.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 November 2008
Resolution: Received fax of receipt and Master''''s statement attesting to immersion suit being onboard vessel.
Engineering › Fuel Oil Service System › Piping
Issued 4 November 2008 Resolved
Fuel oil supply lines do not have screens or otherwise suitable protection to avoid oil spray or oil leakage onto the sources of ignition. Provide proper screens or protection to fuel oil supply lines prior to next US port after sailing foreign to the satisfaction of Class.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 2 December 2008
Resolution: Deficiency cleared. Sector LA/LB received satisfactory classification society report.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 4 November 2008 Resolved
Cage for explosion-proof in emergency power source space (Located on the bridge) is broken in 3 places. Replace cage prior to next US port after sailing foreign to the satisfaction of Class.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 2 December 2008
Resolution: Deficiency cleared. Received satisfactory classication society report.
Construction/Loadline › Markings › Load Line Mark
Issued 9 October 2006 Resolved
Load line mark not in accordance with load line certificate.
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 November 2006
Resolved 6 June 2007
Resolution: Received class report from [name withheld] satisfying requirement.
Deck/Cargo › Inert Gas System › IGS Blower
Issued 9 October 2006 Resolved
While testing the IG system it was observed that water was leaking from around the caseing gasket for the #1 and #2 blowers.
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 November 2006
Resolved 6 June 2007
Resolution: Received class report from [name withheld] satisfying requirement.
Construction/Loadline › Markings › Load Line Mark
Issued 9 October 2006 Resolved
Load line on stbd side not cleary visible.
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 November 2006
Resolved 6 June 2007
Resolution: Received class report from [name withheld] satisfying requirement.
Deck/Cargo › Inert Gas System › IGS Blower
Issued 6 September 2005 Resolved
WHEN TESTING IG SYSTEM IT WAS OBSERVED THAT INERT GAS WAS LEAKING ARROUND THE CASEING GASKET FOR #2 BLOWER AND AT #2 BLOWER DISCHARGE EXPANSION JOINT, POSING AN OXYGEN DEFICIANT ATMOSPHERE HAZARD IN THE UPPER ENGINE ROOM. FLAG STATE REP. TO ATTEST TO PROPER OPPERATION AND PERMINENT REPAIRS TO IG SYSTEM. CITE: SOLAS 74A II-2/4.5.5 CODE: 15B
Action required: 15 - Rectify deficiencies by next port
Due 7 September 2005
Resolved 14 September 2005
Resolution: Recieved class report.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 30 October 2004 Resolved
Provide proof of proper repair to Inert Gas System blower prior to cargo operations in next US port after sailing foreign to the satisfaction of classification society.
Action required: 705 - Other - as specified
Resolved 30 October 2004
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 12 August 2003 Resolved
Ship lacks sufficient means to properly test smoke detectors without using real smoke. Obtain canned smoke and fax receipt to [name withheld] prior to departing the port.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 12 August 2003
Resolved 13 August 2003
Resolution: Received this date
Personnel › Certificates/Documents/Licenses › License, Mate
Issued 12 August 2003 Resolved
Italian endorsement for 3rd mate, Phillipino missing. Obtain same from Italy prior to departing the port of NY.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 12 August 2003
Resolved 13 August 2003
Resolution: Faxed report received this date.
Pollution Prevention/Response › Prevention Equipment
Issued 12 August 2003 Resolved
ODME for slop discharge does not work. Repair to satisfaction of RINA prior to 12 Sept 2003 and fax report to COTP NY. LEGACY COMPONENT DESC: Cargo Monitor/Control System
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 September 2003
Resolved 19 September 2003
Resolution: Received class report dated 19SEP03 attesting to satisfactory operation of ODME.

Ownership record