Records from 2016 to 2026. Most recent: inspection, 10 March 2026.
Inspection history · 22
10 March 2026
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8323604
5 March 2026
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8320502
14 November 2025
PSC B · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8267637
18 September 2025
PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8233118
24 June 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8166641
11 March 2025
PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8091567
7 March 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8089988
14 November 2024
PSC B
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8032448
26 February 2024
PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7869163
12 September 2023
PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7789768
29 March 2023
PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7658933
11 May 2022
PSC B · Ballast Water Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7443796
9 October 2021
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7329581
10 March 2021
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7153364
3 December 2019
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6866291
14 September 2019
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6811503
13 December 2018
Ballast Water Examination · PII Safety Exam · ISPS III Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6592458
28 August 2018
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6525319
25 May 2018
ISPS III Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6420313
6 May 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6406975
26 November 2017
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6311531
2 January 2016
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5787946
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 19 November 2025
Resolved
Cargo ships shall carry one or more totally enclosed lifeboats comlying with reg. of section 4.6 of the Code of such aggregate capacity on each side of the ship as will accomodate the total number of persons on board.
During the lowering of the port side lifeboat, as soon as the lifeboat reached the embarkation, the forward davit conenction released or broke causing the lifeboat to hang from the rear attachment only. Seconds later the rear attachment failed and lifeboat fell into the water. Before vessel can return to the U.S. It will be required to have one or more totally enclosed lifeboats of such aggregate capacity on each side of the ship.
74 SOLAS (20) III/ 31.1.1.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 5 March 2026
Resolution: class report received.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 14 November 2025
Resolved
Cargo ships shall carry one or more totally enclosed lifeboats comlying with reg. of section 4.6 of the Code of such aggregate capacity on each side of the ship as will accomodate the total number of persons on board.
During the lowering of the port side lifeboat, as soon as the lifeboat reached the embarkation, the forward davit conenction released or broke causing the lifeboat to hang from the rear attachment only. Seconds later the rear attachment failed and lifeboat fell into the water.
74 SOLAS (20) III/ 31.1.1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 November 2025
Resolution: Class report received, deficiency cleared and changed to a code 40ac.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 14 November 2025
Resolved
Before the ship leaves port and at all times during voyage, all life-saving appliances shall be in working order and ready for immediate use.
PSCO observed shock load to the wire rope, davit, rings, hooks, and material of the lifeboat, and are questioning the integrity of the wire rope, the foundation of davit and the structural condition of the lifeboats.
74 SOLAS (20) III/ 20.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 November 2025
Resolution: Deficiency cleared and changed to a code 40ac.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 November 2025
Resolved
... the safety of passengers, crew and ship from electrical hazards will be ensured.
PSCO observed exposed wiring throughout the engine room, steering gear room, cargo decks, as well as the bridge electrical storage room.
74 SOLAS (04) II-1/ 40.1.3
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 5 March 2026
Resolution: class conducted renewal survey 02FEB2026.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 14 November 2025
Resolved
The inspections mentioned in 10.2 as well as the measures referred to in 10.3 should be integrated into the ship's operational maintenance routine.
Due to a sudden operational failure of life-saving equipment, conduct audit to ensure SMS addresses specific measures for reliability of equipment.
74 SOLAS (20) IX/ 3.1
ISM COde 10.4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 November 2025
Resolution: Sector Jacksonville Recieved Audit report. See Documents.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 14 November 2025
Resolved
Whenever an accident occurs to a ship or a defect is discovered, either of which affects the safety of the ship or the efficiency or completeness of its life-saving appliances... the master or owner of the ship shall report at the earliest opportunity to the Admin, the nominated surveyor or RO responsible for issuing the relevant certificate, who shall casue investigations to be initiated to determine whether a survey is necessary.
Due to the accident that occured during PSC exam, USCG is recommending the nominated surveyor or RO who issued the SOLAS equipment certificate to conduct a survey of both lifeboats davits, wire ropes, and connection points on lifeboats.
74 SOLAS (20) I/ 11(c)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 November 2025
Resolution: Class report received
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 14 November 2025
Resolved
Before the ship leaves port and at all times during voyage, all life-saving appliances shall be in working order and ready for immediate use.
PSCO observed shock load to the wire rope, davit, rings, hooks, and material of the lifeboat, and are questioning the integrity of the wire rope, the foundation of davit and the structural condition of the lifeboats. Before vessel can return to the U.S. evidence of load testing to port davit must be provided.
74 SOLAS (20) III/ 20.2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 5 March 2026
Resolution: class report received.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 November 2024
Resolved
1 "The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board." Damage to hull compromising structural integrity was noted. Temporary welds to internal damage appear insufficient.
74 SOLAS(04)I-11(a)
17ac
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2024
Resolved 16 November 2024
Resolution: Rectified by class report and fresh welds 16NOV2024. Vessel scheduled for drydock July 2025. See documents tab for class report.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 14 November 2024
Resolved
2 "The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: .3 the ignitability of combustible materials shall be restricted." Oil soaked lagging in machinery spaces has accumulated.
74SOLAS(20)II-2 4.1.3.
17AC
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2024
Resolved 15 November 2024
Resolution: Rectified by class report and removal of oil soaked lagging 15NOV2024.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 November 2024
Resolved
3 "The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended." Several patches were found on freshwater tank, cooling piping.
74SOLAS(20)II-1 26.1
17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2024
Resolved 15 November 2024
Resolution: Rectified by class report and replacement of freshwater tank piping 15NOV2024.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 November 2024
Resolved
4 "All ships officers concerned with the operation and/or maintenance of steering gear shall be familiar with the operation of the steering systems." Failed to properly conduct steering gear test.
74 SOLAS(20) V 26.3.2
10AC
Action required: 10 - Deficiency Rectified
Due 14 November 2024
Resolved 14 November 2024
Resolution: Corrected on the spot.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 14 November 2024
Resolved
5 "Every company should develop, implement, and maintain a safety management system which includes the following functional requirements: instructions and procedures." Cyber plan requires vessel to update passwords annually, use complex passwords, and not print passwords. Vessel failed to follow these cyber plan requirements.
Note: Vessel must conduct internal audit to ensure SMS cyber hygiene is properly implemented.
74 SOLAS (14) IX 13.1
ISM Code 1.4
40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 14 December 2024
Resolved 6 March 2025
Resolution: Vessel sent the condition of class via email to Sector Maryland before their arrival to our port proving they cleared the Cyber Hygiene deficiency.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 March 2023
Resolved
07105- Stairways and lift trunks which penetrate more than a single deck shall be surrounded by at least A-0 Class divisions and be protected by self closing doors at all times. PSCO observed doors D-1, D-2, and D-4 in the main vertical stairwell and doors 1, 2, and 3 in the up stairwell did not self-close.
-74SOLAS(01) II-2/46.1
- 40AC
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 13 September 2023
Resolution: Class surveyor visually inspected faulty fire doors and verified rectification of deficiency.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 March 2023
Resolved
07105- Doors required to be self-closing shall not be fitted with hold-back hooks. PSCO observed multiple self-closing doors with hold-backs.
-4SOLAS(01) II-2/47.2
-10C
Action required: 10 - Deficiency Rectified
Resolved 29 March 2023
Resolution: Crew removed hold back hooks
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 March 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respets will remain fit to proceed to sea without danger to the ship or persons on board. #2 boiler circulating pump has a damaged gasket and is leaking steam.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 10 April 2021
Resolved 30 March 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 September 2019
Resolved
99101 - Cargo shall be loaded, stowed and secured in accordance with the Cargo Securing Manual. PSCO observed lashings attached to vehicle wheels on multiple decks. Lashings attached to wheels is not listed as an approved standard in Cargo Securing Manual.
74 SOLAS (14) VII/5
17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 September 2019
Resolution: Received class report. Cargo Securing Manual was updated.
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 14 September 2019
Resolved
01309 - General arrangement plans shall be permanently exhibited showing clearly for each deck means of access to each compartment. The vessel's fire control plan does not include symbols for fire doors.
74 SOLAS (01) II-2/20.1
50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 December 2019
Resolution: Received Class report attesting to the corrections to the fire control plan
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 December 2018
Resolved
Terminations and joints in all conductors shall be made as to retain the original electrical properties of the cable connection. Twist-on wire nuts were found exposed in the cargo ventilation control room which poses an electrical hazard to backing out due to the vibration caused by the ship.
74 SOLAS (04) II-1/45.5.6, 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 13 December 2018
Resolution: Proper connections were installed to the satisfaction of both Class KRS and USCG.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 13 December 2018
Resolved
The fire resistance of doors shall be equivalent to that of the division in which they are fitted. The A-60 doors to the Dry Store room would not self-close which compromised the fire boundary.
74 SOLAS (01) II-2/47.1, 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 13 December 2018
Resolution: The door was repaired to the satisfaction of both Class KRS and USCG.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 13 December 2018
Resolved
Door required to be self-closing shall not be fitted with hold-back hooks. A cargo deck door was being held open with a strap during cargo operations.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 13 December 2018
Resolution: The strap was immediately removed and door closed properly.