← All vessels
PREMIUM DO BRASIL
PREMIUM DO BRASIL is a 2003 freight ship. The Coast Guard has recorded 31 inspections since 2003, most recently in August 2026, along with 17 deficiencies and 8 operational controls.
Records from 2003 to 2026. Most recent: inspection, 6 August 2026.
- Built
- 2003
- Last inspected
- 6 August 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 17 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9242089 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
A8BL4
653478
Flag
LIBERIA
—
Maury page id
psix-653478
Inspections, by type
…with no type recorded8
Years with a record
15 calendar years (2003–2026)
The 31 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Refrigerated Cargo Ship class in Maury's sources begin in 1984.
Documentation record
Tonnage as PSIX records it33005 - Convention (Subpart B), Gross Ton
33005 - Simplified, Gross Ton
9902 - Convention (Subpart B), Net Ton
43067 - Dead Weight, Ton
9902 - Simplified, Net Ton
33005 - Simplified, Gross Ton
9902 - Convention (Subpart B), Net Ton
43067 - Dead Weight, Ton
9902 - Simplified, Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 31
6 August 2026
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8455671
21 November 2025
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8272153
25 October 2025
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8258388
20 October 2025
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8255865
6 October 2025
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8247292
16 January 2025
PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8058652
3 March 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7645000
15 February 2023
In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7637117
15 February 2023
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7637838
9 February 2023
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7637115
6 September 2022
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7552926
28 November 2021
Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7360019
3 November 2021
PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7342016
10 March 2021
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7153396
15 January 2021
Deficiency Check · PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7122198
13 December 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6873585
21 February 2019
PII Safety Exam · Deficiency Check · Ballast Water Examination · ISPS III Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6626100
8 January 2019
Deficiency Check · Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6604667
7 January 2019
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6610594
6 June 2018
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6443004
25 January 2018
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6343665
21 December 2017
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6327371
5 October 2017
ISPS II Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6281714
4 October 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6282079
23 October 2016
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6027811
9 October 2015
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5739655
15 May 2014
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4859331
9 November 2010
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3888048
13 November 2007
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3093210
19 September 2006
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2781832
30 September 2003
MARPOL Annex I Examination · MARPOL Annex V Examination · Annual Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1917696
Deficiency record · 17
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 15 February 2023
Resolved
Safety of Navigation - 10103 - All ships of 3,000 gross tonnage and upwards shall, in addition to meeting the requirements of paragraph 2.5, have:
A 3 ghz radar or, where considered appropriate by the administration, a second 9 ghz radar, or other means, to determine and display the range and bearing of other surface craft, obstructions, buoys, shorelines and navigational marks, to assist in navigation and in collision avoidance, which are functionally independent of those referred to in paragraph 2.3.2
Vessel does not have two functionally independent radar systems.
SOLAS 2020 Ch. V Reg. 19.2.7
40 A/C
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 3 November 2021
Resolved
CG006 - BWMS - PREMIUM DO BRASIL, of keel laid date 11APR2002 and ballast water capacity of 20200 m3, is past its compliance date per the implementation schedule in 33 CFR 151.2035(b). Vessel's current ballast water management method is exchange and discharge, which is not authorized. Vessel has no BWTS installed. Vessel is not authorized to discharge untreated ballast water into U.S. waters.
This deficiency will not be cleared until CG examiners receive documentation that the vessel has installed a BWTS, has decided to use public water from the U.S. public water system, or has updated its ballast water management plan to state that the vessels ballast water management method in U.S. waters is no discharge. - 33 CFR 151.2035 - 15c
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 January 2021
Resolved
07126-
To prevent the ignition of combustible materials or flammable liquids, the following functional requirements shall be met; means shall be provided to control leaks of flammable liquids. PSCO found leaking oil from main propulsion engine onto electrical control box in engine room.
74 SOLAS (01 con.) II-2/4.1.1
17c
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 15 January 2021
Resolved
07110
Fire extinguisher shall be situated ready for use at easily visible places. PSCO found uncharged fire extinguisher in engine room.
74 SOLAS 01 con. II-2/10.3.2.4
10c
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 8 January 2019
Resolved
01-15190-OBJECTIVE EVIDENCE DISCOVERED DURING AN EXPANDED ISM EXAM REVEALED THE FOLLOWING NON-CONFORMITITES. THESE DISCREPANCIES INCLUDED WITH THE OTHER MATERIAL DEFICIENCIES ARE EVIDENCE THE CREW/COMPANY ARE NOT MEETING THE SMS REQUIREMENTS. RECOMMEND AN EXTERNAL AUDIT. 74SOLAS(CONS) CH IX / REG 3.1 ISM CODE PART A 1.3
01-THE COMPANY SHOULD ESTABLISH PROCEDURES TO ENSURE THAT THE SHIP IS MAINTAINED IN CONFORMITY WITH THE PROVISIONS OF THE RELEVANT RULES AND REGULATIONS. IN MEETING THESE REQUIREMENTS, THE COMPANY SHOULD ENSURE THAT; ANY NON-CONFORMITY IS REPORTED; AND APPROPRIATE CORRECTIVE ACTION IS TAKEN. PSCO OBSERVED SOFT PATCHES IN THE ENGINE ROOM ON THE AUXILIARY SALT WATER LINE AND THE #4 MAIN ENGINE CYLINDER FUEL PUMP DRAIN LINE. THE PATCHES WERE NOT APPROVED BY THE VESSEL’S CLASS NOR WERE THERE ANY CORRECTIVE ACTIONS TAKEN IAW THE VESSELS SMS. ISM CODE PART A 10.2.2, 10.2.3
02-THE COMPANY SHOULD ESTABLISH PROCEDURES TO ENSURE THAT THE SHIP IS MAINTAINED IN CONFORMITY WITH THE PROVISIONS OF THE RELEVANT RULES AND REGULATIONS. IN MEETING THESE REQUIREMENTS, THE COMPANY SHOULD ENSURE THAT; ANY NON-CONFORMITY IS REPORTED; AND APPROPRIATE CORRECTIVE ACTION IS TAKEN. PSCO ALSO OBSERVED A FLEXIBLE HOSE INSTALLED IN THE DRAIN LINE FROM FUEL OIL HOT BOX WHICH WAS NOT OF APPROVED MATERIAL, NOR WERE THERE ANY CORRECTIVE ACTION TAKEN IAW THE VESSEL’S SMS. ISM CODE PART A 10.2.2, 10.2.3
03-THE COMPANY SHOULD ESTABLISH PROCEDURES TO ENSURE THAT THE SHIP IS MAINTAINED IN CONFORMITY WITH THE PROVISIONS OF THE RELEVANT RULES AND REGULATIONS. IN MEETING THESE REQUIREMENTS, THE COMPANY SHOULD ENSURE THAT; ANY NON-CONFORMITY IS REPORTED; AND APPROPRIATE CORRECTIVE ACTION IS TAKEN. THE MAIN ENGINE WAS OBSERVED TO HAVE FUEL SOAKED LAGGING, PIPING AND HOUSING ON IN THE VICINITY OF THE FUEL PUMPS. ADDITIONALLY, IN THE AUTOMATIC FUEL FILTER AREA, FUEL SPRAY WAS APPARENT AND OBSERVED ON THE CEILING, COVERING THE PIPING AND THE LAGGING, AND INSIDE THE ELECTRICAL CONTROL BOXES FOR THE AUTOMATIC FUEL FILTER SYSTEM. BEING A REOCCURING ISSUE, A PLASTIC CUTRAIN WAS INSTALLED AROUND THE SYSTEM TO SHIELD THE REST OF THE ENGINE ROOM FROM THE FUEL SPRAY. NO CORRECTIVE ACTION TAKEN IAW THE VESSEL’S SMS. ISM CODE PART A 10.2.2, 10.2.3
04-THE COMPANY SHOULD ESTABLISH PROCEDURES TO ENSURE THAT THE SHIP IS MAINTAINED IN CONFORMITY WITH THE PROVISIONS OF THE RELEVANT RULES AND REGULATIONS. IN MEETING THESE REQUIREMENTS, THE COMPANY SHOULD ENSURE THAT; ANY NON-CONFORMITY IS REPORTED; AND APPROPRIATE CORRECTIVE ACTION IS TAKEN. PSCO OBSERVED AN APPROXIMATELY 15 INCH CRACK IN THE CRANK CASE HOUSING OF THE MAIN ENGINE. PSCO OBSERVED DOCUMENTATION SHOWING THAT THE CRACK HAD BEEN REPORTED ON JANUARY 18, 2018, BUT NO NON-CONFORMITY REPORTS HAVE BEEN FILED OR CORRECTIVE ACTIONS HAVE BEEN IMPLEMENTED.
ISM CODE PART A 10.2.2, 10.2.3
30BC
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 January 2019
Resolved
02-07126-IN A SHIP IN WHICH FUEL OIL IS USED, THE ARRANGEMENTS FOR THE STORAGE, DISTRIBUTION AND UTILIZATION OF THE FUEL OIL SHALL BE SUCH AS TO ENSURE THE SAFETY OF THE SHIP AND PERSONS ONBOARD. PSCO OBSERVED AN OVERALL HAZARDOUS CONDITION OF THE ENGINE ROOM. PSCO OBSERVED THE MAIN ENGINE TO HAVE FUEL SOAKED LAGGING, PIPING, AND HOUSING IN THE VICINITY OF THE MAIN ENGINE FUEL PUMPS. ADDITIONALLY, IN THE AUTOMATIC FUEL FILTER AREA, A HISTORY OF FUEL SPRAY WAS APPARENT AND OBSERVED ON THE CEILING, COVERING THE PIPING AND LAGGING, AND INSIDE THE ELECTRICAL CONTROL BOXES FOR THE AUTOMATIC FUEL FILTER SYSTEM. BEING A REOCCURING ISSUE, A PLASTIC CURTAIN WAS PLACED AROUND THE SYSTEM. 74SOLAS (01CONS) CH II-2 / REG 15.2
30ABC
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 8 January 2019
Resolved
03-11105-CARGO SHIPS SHALL CARRY AT LEAST ONE RESCUE BOAT COMPLYING WITH THE REQUIREMENTS OF SECTION 5.1 OF THE CODE. ALL ITEMS OF RESCUE BOAT EQUIPMENT SHALL BE SECURED WITHIN THE RESCUE BOAT. PSCO OBSERVED ALL REQUIRED EQUIPMENT WAS STORED IN A SEPARATE LOCKER ON DECK AWAY FROM THE RESCUE BOAT.74SOLAS(14CONS) CH III/ REG 31.2 LSA CODE 5.1.2.1
17AC
04 - Emergency Systems › N/A - No Subsystem › Enclosed space entry and rescue drills
Issued 8 January 2019
Resolved
04-04118-ENCLOSED SPACE ENTRY AND RESCUE DRILLS SHOULD BE PLANNED AND CONDUCTED BY DESIGNATED PERSONS EVERY TWO MONTHS. PSCO DISCOVERED VESSEL WAS NOT CONDUCTING DRILLS AS REQUIRED. 74SOLAS(14CONS)CH III/ REG 19.3.3 17AC
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 January 2019
Resolved
05-07126-IN A SHIP IN WHICH OIL FUEL IS USED, THE ARRANGEMENTS FOR THE STORAGE, DISTRIBUTION AND UTILIZATION OF THE OIL FUEL SHALL BE SUCH AS TO ENSURE THE SAFETY OF THE SHIP AND THE PERSONS ON BOARD. PSCO OBSERVED EXCESSIVE OIL IN PORT SIDE BILGE WELL.. 74SOLAS(01CONS)CH II-2 / REG 15.2 17AC
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 January 2019
Resolved
06-07199-OIL FUEL PIPES AND THEIR VALVES AND FITTINGS SHALL BE OF STEEL OR OTHERS APPROVED MATERIAL TO THE SATISFACTION OF THE ADMINISTRATION. PSCO OBSERVED A FLEXIBLE HOSE AS THE DRAIN LINE FROM THE FUEL OIL HOT BOX, WHICH IS NOT OF APPROVED MATERIAL. 74SOLAS(04CONS)CH II-1 / REG 26.1 17AC
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 January 2019
Resolved
07-13199-MACHINERY PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM DANGER TO PERSONS ON BOARD. THE DESIGN SHALL HAVE REGARD TO MATERIALS USED IN CONSTRUCTION, THE PURPOSE FOR WHICH THE EQUIPMENT IS INTENDED. PSCO OBSERVED A SOFT PATCH INSTALLED ON AN AUXILARY SALT WATER PIPE. 74SOLAS(04CONS)CH II-1/ REG 26.1 17AC
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 January 2019
Resolved
08-13199-THE MACHINERY ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD DUE REGARD BEING PAID FOR MOVING PARTS, HOT SURFACES AND OTHER HAZARDS. PSCO OBSERVED SOFT PATCH ON MAIN ENGINE FUEL OIL DRAIN PIPING. 74SOLAS(04CONS) CH II-1 / REG 26.1
17AC
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2019
Resolved
09-13101-SHIPS SHALL BE MAINTAINED IN COMPLIANCE WITH THE STRUCTURAL, MECHANICAL, AND ELECTRICAL REQUIREMENTS OF A CLASSIFICATION SOCIETY WHICH IS RECOGNIZED BY THE ADMINISTRATION IN ACCORDANCE WITH THE PROVISIONS OF REGULATION XI/I OR WITH APPLICABLE NATIONAL STANDARDS OF THE ADMINISTRATION WHICH PROVIDE AN EQUIVALENT LEVEL OF SAFETY. PSCO OBSERVED AN APPROXIMATELY 15 INCH CRACK IN THE CRANK CASE HOUSING OF THE MAIN ENGINE. 74SOLAS(04CONS) CH II-1/ REG 3-1 17AC
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 8 January 2019
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 8 January 2019
Resolved
10-04108 CLEAR INSTRUCTIONS TO BE FOLLOWED IN THE EVENT OF AN EMERGENCY SHALL BE PROVIDED FOR EVERY PERSON ON BOARD. PSCO OBSERVED INEFFECTIVE MUSTER LIST USED DURING FIRE AND ABANDON SHIP DRILLS. CREW MEMBERS WERE ASSIGNED A NUMBER AND NOT ALL CREW MEMBERS KNEW THEIR ASSIGNED NUMBER OR DUTIES. ADDITIONALLY, MUSTER LIST DOES NOT INSTRUCT FIRE FIGHTING TEAM TO CARRY RADIOS AS PER SOLAS. 74SOLAS(14CONS) CH II-2 / REG 10.10.4
17AC
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 21 December 2017
Resolved
The machinery shall be of a design and construction adequate for the service for which it is intended. 74 SOLAS (04) II-1/26.1 The vessel's MDE turbo foundation is cracked in multiple places and has temporary weld repairs. The turbo is being supported by wood blocks.
Fire Fighting › Self-contained Breathing Apparatus › Lifeline
Issued 21 December 2017
Resolved
Firefighting equipment shall comply with the FSS Code. 74 SOLAS (04) II-2/10.1 For each breathing apparatus a fireproof lifeline shall be provided. FSS 3.2.1.3. One of the vessels breathing apparatus's is missing a fireproof lifeline.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.