Records from 2016 to 2025. Most recent: inspection, 9 December 2025.
Inspection history · 15
9 December 2025
Explosive Handling Operation-Commercial
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8280141
21 November 2025
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8272177
4 March 2025
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8088135
8 June 2022
PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7461694
25 November 2019
Deficiency Check · ISPS II Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6859167
22 May 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6690525
14 May 2019
ISPS II Exam · Ballast Water Examination · Deficiency Check · PII Safety Exam
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6679409
13 December 2018
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6597350
30 November 2018
Ballast Water Examination · ISPS II Exam · NPV Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6588238
27 November 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6587267
28 May 2018
ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6426683
1 December 2017
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6312836
31 May 2017
ISPS II Exam
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6157756
2 December 2016
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6047688
17 January 2016
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5798886
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 14 May 2019
Resolved
07122 - Fire Control Plan - Fire Control Plans* Resolution A.654(16): Graphical Symbols for Fire Control Plans require self closing door symbols to have arrows indicating they are self closing. Vessel's fire control plans have incorrect symbols for self closing doors without arrows. - 74 SOLAS 01 con. II-2/15.2.4
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 November 2019
Resolution: Verified self-closing doors were marked on the fire control plan. Received and reviewed justification from DNV GL.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 November 2018
Resolved
13102 - Propulsion and Auxiliary Machinery - Means shall be provided to control flammable liquids. PSCO observed an oil covered fuel pump on the No. 5 fuel pump of the No. 1 auxiliary engine, fuel was pooled in the generator.
74SOLAS(am)2001cons.II-2/4.1.1
17a
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 November 2018
Resolved 1 December 2018
Resolution: PSC NOLA recieved a class report attesting to repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 27 November 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or the persons on board. PSCO observed multiple lighting fxtures throughout the ship to be damaged and/or inoperable.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 May 2019
Resolution: MSU Lake Charles Inspectors conducted visual inspections of lighting fixtures throuougt the vessel. All lighting fixtures found to be satisfactory.