Inspection history · 57
11 April 2026
Appeal
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8382685
5 April 2026
PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8342990
7 February 2026
PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8307128
4 February 2026
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8306178
3 February 2026
PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8305803
24 August 2025
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8216567
19 February 2025
PSC B
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8081312
12 December 2024
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8046528
18 June 2024
PSC B
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7924656
14 September 2023
PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7789922
8 September 2023
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7787582
7 September 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7786975
5 February 2023
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7632165
15 June 2022
PSC B · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7477517
19 October 2021
Ballast Water Examination · PSC B · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7335382
28 May 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7208981
21 May 2021
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7202753
12 April 2021
PSC B · Ballast Water Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7172799
9 April 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7171720
19 February 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7142832
2 January 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7118654
12 November 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7093809
24 September 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7064207
23 September 2020
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7062847
7 August 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7026298
30 July 2020
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7020040
18 June 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6980360
12 June 2020
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6974677
30 April 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6946035
13 March 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6925999
12 March 2020
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6925148
18 October 2019
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6837172
22 February 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6625476
2 January 2018
ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6331207
2 January 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6331671
30 December 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6331240
20 October 2017
In-Service Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6291463
16 October 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6288410
13 October 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6286936
9 August 2017
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6235089
4 August 2017
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6230578
4 August 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6230719
4 August 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6230727
15 May 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6146283
11 May 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6144236
16 March 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6106259
26 February 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6095227
24 February 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6094142
13 December 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6057509
8 December 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6054491
24 October 2016
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6028253
26 September 2016
Deficiency Check · NPV Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6009294
26 September 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6009594
22 September 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6006802
11 July 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5936831
11 July 2016
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5937129
7 July 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5933003
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 4 February 2026
Resolved
The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the Company. Objective evidence indicates a failure to maintain appropriate work/rest hours, critical safety equipment on the main engine, and safe working conditions for crewmembers. An external safety management audit shall be carried out.
SOLAS (04) IX/3.1
ISM 1.2.2
Code: 50 AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 February 2026
Resolved 5 February 2026
Resolution: Flag and class attested that an audit will be conducted at the next convenient port but no later than 04MAY26.
09 - Working and Living Conditions › 092 - Working Conditions › Fitness for duty - work and rest hours
Issued 4 February 2026
Resolved
All persons who are assigned duty officer in charge of a watch or as a rating forming part of a watch and those whose duties involved designated safety, prevention of pollution and security duties shall be provided with a rest period of not less than a minimum of 10 hours of rest in any 24-hour period. Upon review of “Overtime / Rest Reports”, the Port State Control Officer (PSCO) determined that eight (8) crew members in the engineering department were not provided the required rest in a 5 day sample size. During port call, a crew member was also significantly injured after an observed 18 hours without rest. An audit of the work rest hours is directly requested as part of the above audit.
STCW VIII/1
STCW A-VIII/1.2
Code: 17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 4 February 2026
Resolved 5 February 2026
Resolution: Received class report attesting that work/rest will be audited by flag during the ISM audit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 February 2026
Resolved
Internal combustion engines of 2,250 kW and above or having cylinders of more than 300 mm bore shall be provided with crankcase oil mist detectors or engine bearing temperature monitors or equivalent devices. PSCO observed that the oil mist detection system for the main engine was inoperable. The system's alarm panel indicated a fault, and the crew was unable to demonstrate its operational readiness or provide objective evidence how long the system had been inoperable.
SOLAS (04) II-1/47.2
Code: 17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 4 February 2026
Resolved 5 February 2026
Resolution: Received class report attesting to the M/E 1 and M/E 2 oil mist detection back in operation.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 4 February 2026
Resolved
Associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to a persons on board. PSCO observed that a quick-closing valve for a sludge tank was obstructed by a pair of vice-grips. The tool was clamped onto the valve mechanism in such a way that it physically prevented the valve from being shut, rendering the remote emergency closing function completely inoperable.
SOLAS (09) II-1/26.1
Code: 10C
Action required: 10 - Deficiency Rectified
Due 4 February 2026
Resolved 5 February 2026
Resolution: Received class report attesting to the vice-grips being removed and the quick-closing valve being back in operation.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 4 February 2026
Resolved
Every steam pipe and every fitting connected thereto through which steam may pass, shall be so designed, constructed and installed as to withstand the maximum working stresses to which it may be subjected. PSCO observed a steam pipe valve actively leaking in the purifier room. The continuous leak of high-temperature steam created a hazardous condition for any personnel entering or working in the space, posing a significant risk of severe burns.
SOLAS (04)
II-1/33.1
Code: 17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 4 February 2026
Resolved 5 February 2026
Resolution: Received class report attesting to the steam pipe valve being fixed and not posing a hazard to the crew.
07 - Fire Safety › N/A - No Subsystem › International shore-connection
Issued 4 February 2026
Resolved
The international shore connection flange shall have a flat face on one side and, on the other side, it shall be permanently attached to a coupling that will fit the ship's hydrant and hose. PSCO observed that the gaskets for the international shore connection were deteriorated to such an extent that a proper seal could not be achieved and condition was last verified on 19DEC25. This condition renders the connection unusable, preventing the vessel from connecting to a shoreside water supply for firefighting purposes.
SOLAS (09) II-2/10.2.1.7.1
FSS Code 2.2.2.1
Code: 16AC
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 February 2026
Resolved 5 February 2026
Resolution: Received class report attesting to the proper gasket and fit of the ISC.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 18 June 2024
Resolved
02105 - STEERING GEAR - ALL THE STEERING GEAR COMPONENTS AND THE RUDDER STOCK SHALL BE OF SOUND AND RELIABLE CONSTRUCTION TO THE SATISFACTION OF THE ADMINISTRATION. PSCO OBSERVED STEERING GEAR DRIFT WHILE CONDUCTING STEERING TEST ON STEERING PUMP #2. 74 SOLAS 04 II-1/29.2.1-17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 18 June 2024
Resolved 18 June 2024
Resolution: RECEIVED CLASS REPORT ATTESTING TO REPAIRS.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 September 2023
Resolved
Fire fighting systems and appliances shall be kept in good working and readily available for immediate use. PSCO observed a two inch hole in the fire main that feeds the paint store sprinkler.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 September 2023
Resolution: Received pictures and Class Survey report showing that the faulty section of pipe had been renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 5 February 2023
Resolved
74 solas (01) II-1/29.12.3
15AC
A fixed storage tank having sufficient capacity to recharge at least one power actuating system including the reservoir, where the main steering gear is required to be power-operated. The storage tank shall be connected by piping in such a manner that permanently connected the hydraulic systems can be readily recharged from a position within the steering gear compartment and shall be provided with a contents gauge.
PSCO observed steering gear room fixed storage tank gauge leaks when testing level. Unable to ascertain accurate measurement of contents in spare tank.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 13 February 2023
Resolved 11 February 2023
Resolution: Vessel submitted satisfactory photo evidence and class report of issue rectification. O rings were replaced and tank was able to hold pressure without leaking.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 12 April 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Liferafts servicing expired and not in proper stowage locations. 74 SOLAS(14 Cons) III/20.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 12 April 2021
Resolved 12 April 2021
Resolution: Corrected on spot. Captain received life raft servicing extension from Flag.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 12 April 2021
Resolved
The electrical power available shall be sufficient to supply all those services that are essential for safety in an emergency. PSCO observed excessive diesel oil leak from filter causing inoperability. 74 SOLAS(04 Cons)II-1/43.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 12 April 2021
Resolved 12 April 2021
Resolution: Corrected on spot. Engineer changed washer on fuel oil filter on EDG that was causing diesel oil to spill. PSCO witnessed successful EDG test.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 12 April 2021
Resolved
Electrical services essential for safety will be ensured under various emergency conditions. Various main and emergency lighting onboard not illuminated. 74 SOLAS(04Cons)II-1/40.1.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2021
Resolved 21 May 2021
Resolution: Received class report. Deficiency has been rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 April 2021
Resolved
Provision shall be made to faciltate maintenance of boilers. Boiler refractory has deteriorated, reduces boiler efficiency. This indicates a lack of proper maintenance. 74 SOLAS(04Cons)II-1/26.7
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 21 May 2021
Resolution: Received documentation from Class that the deficiency has been rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 February 2019
Resolved
All the steering gear components and the rudder stock shall be of sound and reliable construction to the satisfaction of the Administration. Emergency steering pump failed to start during the steering test.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 22 February 2019
Resolved 22 February 2019
Resolution: Timer was found faulty and replaced.
Engineering › Steering Gear System › Ram
Issued 4 August 2017
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respect will remain fit to proceed to sea without danger to the ship or persons on board. The seals on the rudder actuating rams are leaking hydraulic oil while the steering gear is in operation. 74 SOLAS (14 cons) 1/11a
Action required: 705 - Other - as specified
Due 5 August 2017
Resolved 5 August 2017
Resolution: Seals were replaced and no longer leaks.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 4 August 2017
Resolved
Structural fire protection, including fire-resisting divisions and protection of openings shall be kept in good order so as to ensure their required performance if a fire occurs. 05 A-class fire doors required to be self-closing, as per the vessel’s fire control plan, located on B-deck are not self-closing. 74 SOLAS (09) II-2/ 14.2.1.1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 August 2017
Resolution: Provided class report stating self-closing mechanisms were installed on the "A Class" fire doors IAW fire control plan. Also stated that fire control plan has updated to reflect "B-Class" doors no longer required to be self-closing.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 4 August 2017
Resolved
Doors required to be self-closing shall not be fitted with hold-back hooks. Several doors throughout B-deck, which are required to be self-closing, have hold back hooks. 74 SOLAS (09) II-2/9.4.2.2
Due 4 September 2017
Resolved 13 August 2017
Resolution: Provided class report stating that all hold-back hooks on "A-Class" self closing doors have been removed.
Operations/Management › Vessel Activity › Construction/Repair
Issued 26 September 2016
Resolved
After any survey of the ship under regulations 7,8,9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the Administration. Modification was made to bulkhead between air conditioning room and main passageway on "C" deck without approval from Administration.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 24 October 2016
Resolution: Received, reviewed and accepted DNV GL class survery report.
Fire Fighting › Structural - A Class Divisions › Service Spaces
Issued 26 September 2016
Resolved
Where "A" class divisions are penetrated, such penetrations shall be tested in accordance with the fire test procedures code. A section of "A" class boundary protecting air conditioning unit room has been cut out and temporarily replaced.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 24 October 2016
Resolution: Recieved, reviewed and accepted DNV GL class survey report; original bulkhead plate was restored and reweleded to the satisfaction of class.
Engineering › Fuel Oil Service System › Piping
Issued 11 July 2016
Resolved
Unauthorized spare tool room found in purifier room.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 July 2016
Resolved 26 September 2016
Resolution: Received, reviewed and accepted class report from DNV-GL. Spare tool room has been cleaned out and removed.
Engineering › Diesel Engine (auxiliary) › Waste Heat Recovery
Issued 11 July 2016
Resolved
Unauthorized make shift high temperature water hose found on emergency generator.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 July 2016
Resolved 26 September 2016
Resolution: Received, reviewed and accepted class report from DNV GL. Water hose on emergency generator has been replaced.