Records from 2004 to 2012. Most recent: inspection, 4 May 2012.
Documentation record
Registered dimensions (L × B × D)38.0 ft × 11.7 ft × 3.8 ft
Registered tonnagegross 11 / net 9
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBRUNO & STILLMAN · NEWINGTON, NH, UNITED STATES · built 1978
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portWICKFORD, RI
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 June 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it11 - Simplified, Gross Ton
9 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 8
4 May 2012
Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 4340681
28 April 2009
COI Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3453809
1 July 2008
Re-Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3253516
9 April 2008
Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3158940
19 July 2007
Re-Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2989561
8 August 2006
Re-Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2740456
12 April 2006
Hull Examination
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2622856
12 April 2004
Construction Oversight · Simplified Stability Test · Initial Certification
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2042207
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 4 May 2012
No resolution recorded
Vessel requested to suspend inspection requirements untill they begin operation of the vessel. Issed an 835 to the operator: Prior to being placed in the water and used in any service the vessel must have the following exams conducted: COI, Dry dock and ISE exam. Contact OCMI as soon as practical to arrange exams.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 May 2013 — due date passed with no resolution recorded
Navigation › Piloting/Steering › Marine Charts
Issued 28 April 2009
Resolved
Provide updated charts (current edition is 2001).
Action required: 705 - Other - as specified
Due 14 May 2009
Resolved 8 May 2009
Resolution: new chart purchased.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 28 April 2009
Resolved
Provide updated items for those expired in first aid kit.
Action required: 705 - Other - as specified
Due 14 May 2009
Resolved 8 May 2009
Resolution: First aid kit items updated.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 28 April 2009
Resolved
Provide 18' lanyard for life float water light (current lanyard is approx 3' long).
Action required: 705 - Other - as specified
Due 14 May 2009
Resolved 8 May 2009
Resolution: 18'' lanyard installed for life float water light.
Engineering › Bilge Water Management System › Pump
Issued 28 April 2009
Resolved
Replace electric bilge pump in focsle
Action required: 705 - Other - as specified
Due 14 May 2009
Resolved 8 May 2009
Resolution: new pump purchased and installed.
Deck/Cargo › Ballast › Special Ballast Arrangements
Issued 19 July 2007
Resolved
Secure all ballast on board vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 August 2007
Resolved 21 July 2007
Resolution: Rcvd call from master stating ballast secured in accordance with good marine practice. Follow up on 26July07 confirmed ballast secured as stated.
Lifesaving › Lifefloat › Paddle
Issued 19 July 2007
Resolved
Replace paddle on life float and properly mark with vessel name.
Action required: 705 - Other - as specified
Due 2 August 2007
Resolved 26 July 2007
Resolution: Observed life float outfitted with new paddle stenciled appropriately.
Electrical › Electric Supply System (service) › Battery Installation
Issued 12 April 2004
Resolved
1. Provide approved plans from MSC.
2. Provide and implement approved electrical plans from MSC.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2005
Resolved 20 May 2005
Resolution: Approved all plans locally.
Engineering › Bilge Water Management System › Valve
Issued 12 April 2004
Resolved
Provide positive shut off at hull penetration for five internal electric bilge pumps IAW 46 CFR 182.520 e (7). There are two in the engine compartment, two in the forward compartment, and one in the rope locker forward.
Action required: 705 - Other - as specified
Due 20 May 2006
Resolved 6 April 2006
Resolution: Positive shut off hull penetrations installed.