MAURY USCG vessel records
← All vessels

NANTES

Built
2003
Last inspected
4 August 2026
Documentation
No record in the NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 4 August 2026
…with no type recorded4
Operational controls None recorded without a removal date
Years with a record 8 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9253818
664664
Flag
NORWAY
Maury page id
psix-664664

Documentation record

Tonnage as PSIX records it11023 - Convention (Subpart B), Net Ton
60681 - Displacement, Metric Ton
44773 - Dead Weight, Metric Ton
35190 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel

Behind this panel: 15 inspections, each with its date, unit and type; 7 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 15

4 August 2026 PSC B · COC-GAS Renew · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8446219
2 April 2025 COC-GAS Annual · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8102858
22 February 2025 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8082936
29 April 2024 PSC B · COC-GAS Renew · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7899400
17 October 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7809753
1 May 2023 PSC C · Administrative Inspection · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7677493
11 May 2022 COC-GAS Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7447020
8 April 2022 Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 7428622
23 June 2021 PSC B · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7230286
19 November 2020 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7098628
10 June 2020 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6973365
1 May 2020 COC-GAS Renew · Deficiency Check · PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6940399
13 May 2016 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5881377
24 January 2016 COC-GAS Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5800473
24 January 2016 Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 6093218

Deficiency record · 7

15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 29 April 2024 Resolved
The safety management system should include procedures ensuring that non-conformities, accidents, and hazardous situations are reported to the company, investigated and analyzed with the objective of improving safety and pollution prevention [9.1]. The company should established procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. In meeting these requirements, the company should ensure that any non-conformity is reported, with its possible cause, if known [10.2.2]. The design and installation of fixed electrical equipment in the cargo area is subject to strict regulations to prevent fires or explosions. It is essential that this design safety be maintained. [6-Cargo Equipment and Instrumentation 6.3.4]. Level alarms shall include PMS procedures to ensure maintenance, test, and calibration of this equipment as per maker's instructions [6-Cargo Equipment and Instrumentation 6.3.5]. The fixed seawater spray system shall be maintained in accordance with manufacturer guidelines [1-Fixed Fire Extinguishing Systems - Fixed Seawater Spray System]. As delineated in deficiencies 2-5, the company failed to establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations. Lastly, the objective evidence provided in the proceeding deficiencies attest to the company failing to ensure that any non-conformity is reported, and subsequent action is taken. An additional external verification of the vessel's SMS, focusing on the company procedures regarding maintenance of the ship, is required. 74 SOLAS (2020) IX/3.1 ISM Code 9.1 ISM Code 10.2.2 30AC
Condition: Invalid
Action required: 30 - Ship detained
Resolved 3 May 2024
Resolution: Please see referenced DNV Id No:23600.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 April 2024 Resolved
An airlock should be consistent of two steel doors substantially gastight. PSCO Observed the airlock door leading to the compressor room is not gastight and air freely moving through the edges of the door. 74 SOLAS VII/ 13.1 93 IGC 3.6.1 50AC
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 May 2024
Resolution: Please see reference DNV Id No:23600.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 April 2024 Resolved
On ships carrying flammable or toxic products or both, a water spray for cooling, fire prevention and crew protection should be installed to over exposed cargo tank domes, and boundaries of superstructures and deckhouses normally manned, and cargo compressor rooms. PSCO observed inadequate water spray around the cargo compressor room and tank dome #01. 74 SOLAS (2020) VII/13.1 93 IGC Code 13.3 30ABC
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 3 May 2024
Resolution: Please see reference DNV Id No:23600.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 April 2024 Resolved
Electrical equipment, cables and wiring should not be installed in hazardous locations unless it conforms with the standards not inferior to those acceptable to the organization. PSCO observed 06 damaged light installations on deck and in the cargo compressor room, 02 emergency lights with exposed wiring going into the housing, standpipes on all cargo tank tops severely corroded with exposed wiring, a junction box with a gap comprising the seal, and a dry rotted cable transit seal on the motor supply ventilation. 74 SOLAS (2020) IX/3.1 ISM Code 9.1 ISM Code 10.2.2 30 ABC
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 3 May 2024
Resolution: Please see reference DNV Id No:23600.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 April 2024 Resolved
Cargo tank liquid level gauges when not in use, the devices should be kept completely closed, and the design and installations should ensure that no dangerous escape of cargo can take place when opening the device. PSCO observed a leak of propane escaping from the starboard overfill gauge on the tank dome #01.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 10 May 2024
Resolution: Please see reference DNV Id No:23600.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 May 2022 Resolved
On ship carrying flammable products. A water-spray system for cooling, fire prevention and crew protection should be installed to cover exposed cargo tank domes. Any exposed parts of cargo tanks and cargo compressor room facing the cargo area. PSCO observed insufficient water spray coverage on #1 cargo tank dome. All 03 spray nozzles were clogged preventing adequate coverage. PSCO observed insufficient water spray coverage on the entire branch line on forward bulkhead of cargo compressor room. Vessel's crew unclogged all 03 spray nozzles over #1 cargo tank dome, and branch line. PSCO observed adequate coverage. Vessel's crew provided satisfactory water spray test conducted on 08MAY2022. 74SOLAS(20)VII/13.1 ICC 1993 11.3
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 11 May 2022
Resolved 11 May 2022
Resolution: Rectified while on board.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 1 May 2020 Resolved
THE VAPOR SPACE OF EACH CARGO TANK SHOULD BE PROVIDED WITH A PRESSURE GUAGE WHICH SHOULD INCORPORATE AN INDICATOR IN THE CONTROL POSITION REQUIRED BY 13.13. IN ADDITION A HIGH PRESSURE ALARM AND IF VACUUM PROTECTION REQUIRED, A LOW PRESSURE ALARM SHOULD BE PROVIDED ON THE NAV. BRIDGE. THE ALARMS SHOULD BE ACTIVATED BEFORE THE SET PRESSURES ARE REACHED. CREW SET THE PRESSURE READING ON A PORTABLE PRESSURE APPLICATOR TO .35 BAR G TO THE LOCAL GUAGE ON TANK #1 AND 4. NO ALARM WAS INDICATED BY THE CREW. LOW-LOW PRESSURE ALARM WAS SUCCESSFULLY ACTIVATED AND COULD BE HEARD ON DECK, AFTER MULTIPLE ATTEMPTS, CREW COULD NOT DEMONSTRATE HIGH PRESSURE ALARM FOR CARGO TANK #1 AND #4, CREW STATED THIS SYSTEM WORKED WHEN TESTED A MONTH AGO.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 May 2020
Resolution: Received service and class surveyor report attesting to sat repairs and testing of pressure alarms on all tanks.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.