MAURY USCG vessel records Sign in
← All vessels

CHALLENGER

CHALLENGER is a 2001 freight ship. The Coast Guard has recorded 23 inspections since 2004, most recently in January 2017, along with 9 deficiencies — 1 with no resolution recorded — and 9 operational controls.

Records from 2004 to 2017. Most recent: inspection, 11 January 2017.

Built
2001
Last inspected
11 January 2017
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9216810 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
666936
Flag
MARSHALL ISLANDS
—
Maury page id
psix-666936

Inspections, by type

…with no type recorded11
Years with a record 7 calendar years (2004–2017)
The 23 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 9 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it17734 - Convention (Subpart B), Net Ton
60772 - Displacement, Ton
52413 - Dead Weight, Ton
30303 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 23

11 January 2017 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6068645
6 July 2016 ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5931468
19 August 2015 In-Service Inspection · Deficiency Check · MARPOL Annex VI Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5220635
13 August 2015 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5215089
22 July 2015 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5192156
28 December 2009 PII Safety Exam · MARPOL Annex VI Survey · MARPOL Annex I Examination · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3650455
26 December 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3658926
19 December 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3652998
17 November 2008 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3356959
6 November 2007 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3094255
4 November 2007 Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3092772
1 November 2007 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3091308
1 March 2007 MARPOL Annex V Examination · MARPOL Annex I Examination · ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2879510
28 February 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2879243
24 February 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2876993
20 December 2004 Random ISPS/MTSA/PSC · Ballast Water Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2262457
16 December 2004 ISPS III Exam
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2260664
12 October 2004 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2218424
11 October 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2218682
6 October 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2215455
29 January 2004 Ballast Water Examination · Annual Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1997076
28 January 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1997254
25 January 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1996128

Deficiency record · 9

Construction/Loadline › Structures › Door
Issued 11 January 2017 No resolution recorded
1270 - DOORS - ALL ACCESS OPENINGS IN BULKHEADS AT ENDS OF ENCLOSED SUPERSTRUCTURES SHALL BE WATERTIGHT WHEN CLOSED. BOTH EXTERIOR DOORS ON THE LOWER BRIDGE DECK WERE UNABLE TO BE CLOSED. ICLL 66, REG. 12(1) -40AC-
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Lifesaving › Launching Appliances › Release Mechanism
Issued 11 January 2017 Resolved
0635 - LAUNCH ARRANGEMENTS FOR RESCUE BOATS - BEFORE THE SHIP LEAVES PORT AND AT ALL TIMES DURING THE VOYAGE, ALL LIFE-SAVING APPLIANCES SHALL BE IN WORKING ORDER AND READY FOR IMMEDIATE USE. THE LAUNCHING MECHANISM FROM INSIDE THE STARBOARD LIFEBOAT WAS INOPERABLE AND NOT READY FOR IMMEDIATE USE. 74SOLAS(14)III/20.2 -10C-
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 11 January 2017
Resolution: LAUNCHING MECHANISM WAS RE-STRUNG AND TESTED DAVIT OPERATION VIA LOWERING LIFEBOAT TO EMBARKATION; ALL SATISFACTORY.
Operations/Management › Pollution › Changeover Not Completed Prior to ECA
Issued 19 August 2015 Resolved
2430 - While ships are operating within an emission control area (ECA), the sulfur content used on board ships shall not exceed 0.10%. The PSCO discovered that the vessel has been operating within the North American ECA from 12/08/15 to 24/08/15 utilizing fuel oil that does not comply with the MARPOL Annex VI ECA sulfur limits. - MARPOL Annex VI Reg 14.4 - 17C
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 August 2015
Resolution: Vessel received analysis report showing flash point of LSMGO was within limits for use on the ship. The vessel switched over to LSMGO on 24AUG15.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 22 July 2015 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. 74 SOLAS (14) I/11. The refracting material at the access door of the incinerator is deteriorating beyond safe operating parameters. 50a
Action required: 705 - Other - as specified
Due 21 August 2015
Resolved 19 August 2015
Resolution: Received class survey report attesting to a new refractory plastic fire clay & the refracting material has been applied on the incinerator access door. Visual inspection carried out by surveyor & found sat. Function test carried out & found sat.
Fire Fighting › Firemans Outfit › Protective Clothing
Issued 22 July 2015 Resolved
Personal equipment shall consist of the following: protective clothing or material to protect the skin from the heat radiating from the fire and from burns and scalding by steam. The outer surface shall be water resistant.74 SOLAS (01) II-2/17.1.1.1. The firefighting suits on the vessel are torn and deteriorated and are no longer capable of skin protection and water resistance. 16a
Action required: 705 - Other - as specified
Due 5 August 2015
Resolved 19 August 2015
Resolution: Received class survey report attesting that two new firefighting outfits are on board and inspected satisfactorily by the surveyor.
Lifesaving › Lifeboat Equipment › Food Ration
Issued 1 March 2007 Resolved
During the inspection of the lifeboat equipment the PSCO noted that both lifeboats had many food rations with a compromised vacuum seal. Port side lifeboat has 10 good food rations while starboard side lifeboat has 15. Provide at least one (1) food ration for each crew member (24 crew members) on each lifeboat to the satisfaction of the Coast Guard.
Action required: 705 - Other - as specified
Due 8 March 2007
Resolved 3 March 2007
Resolution: 03 MAR 07: RCVD proper documentation clearing DF.
Navigation › Piloting/Steering › Gyro Compass
Issued 12 October 2004 Resolved
The ship's gyrocompass is inoperable.
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 October 2004
Resolved 12 October 2004
Resolution: Rcvd satisfactory technicians report for repairs to the gyrocompass.
Construction/Loadline › Hull
Issued 29 January 2004 Resolved
The vessel had an inset on the starboard side hull shell plating approx. 1.5 meters in length located between frames 10 and 30, 2.5 meters below the water line, and had possibly impacted fuel oil or cylinder oil tank. Make repairs to the satisfaction of class. LEGACY COMPONENT DESC: Side Shell
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 2 March 2004
Resolved 30 January 2004
Resolution: Received class report stating the inset will be repaired in dry dock APR 04.
Engineering › Lubricating Oil Service System
Issued 29 January 2004 Resolved
The main engine lube oil cooler has a temporary band patch on the cooling water inlet piping. Make repairs to the satisfaction of class. LEGACY COMPONENT DESC: Cooler
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 February 2004
Resolved 30 January 2004
Resolution: Received class report stating that a temporary doubler patch had been applied to the main engine lube oil cooler inlet piping and was tested to the satisfaction of class.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.