MAURY USCG vessel records Sign in
← All vessels

ONEGO EMS

ONEGO EMS is a 2004 freight ship. The Coast Guard has recorded 65 inspections since 2004, most recently in May 2026, along with 36 deficiencies and 13 operational controls.

Records from 2004 to 2026. Most recent: inspection, 8 May 2026.

Built
2004
Last inspected
8 May 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9290074 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
668514
Flag
ANTIGUA AND BARBUDA
—
Maury page id
psix-668514

Inspections, by type

…with no type recorded16
Years with a record 15 calendar years (2004–2026)
The 65 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it7767 - Convention (Subpart B), Gross Ton
14831 - Displacement, Metric Ton
10649 - Dead Weight, Metric Ton
3856 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 65

8 May 2026 PSC B
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 8367921
6 May 2026 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8367835
6 May 2026 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8367836
2 September 2025 PSC B
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8222493
26 August 2025 PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8218213
28 July 2025 PSC B · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8196381
5 June 2025 PSC B
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8150158
11 March 2025 PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8091634
10 March 2025 In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8091534
10 March 2025 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8091537
9 August 2024 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7971463
1 October 2023 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7801307
15 September 2023 PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7792032
14 September 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7791824
14 September 2023 COE-Offshore
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7791841
28 August 2023 Administrative Inspection · VRP Review
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7778854
29 December 2018 COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6603859
14 September 2018 PII Safety Exam · Ballast Water Examination · ISPS II Exam · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6531069
4 August 2018 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6500321
24 July 2018 Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6485573
24 July 2018 Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 6489005
20 November 2017 Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6309780
3 July 2017 Administrative Inspection · Ballast Water Examination · PII Safety Exam · ISPS II Exam · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6191958
3 July 2017 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6208171
24 June 2016 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 5917484
16 June 2016 Administrative Inspection · ISPS II Exam · Deficiency Check · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5909003
4 June 2012 Ballast Water Examination · ISPS II Exam · PII Safety Exam · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4330182
31 August 2011 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4132213
14 December 2009 Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3650241
8 January 2009 PII Safety Exam · ISPS III Exam · Ballast Water Examination · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3390603
6 October 2008 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3337380
2 October 2008 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3337400
21 June 2008 Joint Vessel Security Verification (Massena only) · ISPS II Exam
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 3236407
25 April 2008 Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 3192215
19 September 2007 Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 3061177
14 September 2007 Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 3060330
28 July 2007 Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 3011906
17 June 2007 Random ISPS/MTSA/PSC
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2964226
15 June 2007 ISPS III Exam · MARPOL Annex I Examination · MARPOL Annex V Examination · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2959254
5 April 2007 Random ISPS/MTSA/PSC · Ballast Water Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2983127
13 March 2007 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2886914
10 March 2007 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2885286
10 March 2007 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2885507
13 October 2006 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2799853
12 October 2006 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2799461
3 October 2006 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2792875
3 October 2006 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2792900
29 September 2006 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2790026
26 September 2006 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2787526
28 February 2006 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 2593187
16 February 2006 Random ISPS/MTSA/PSC
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2587198
11 February 2006 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2583659
1 December 2005 Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 2543882
6 October 2005 Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 2503938
7 July 2005 Enhanced Seaway Inspection (Massena only) · Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 2411043
7 July 2005 Joint Vessel Security Verification (Massena only)
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 2412016
3 June 2005 Random ISPS/MTSA/PSC · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2377928
10 March 2005 Ballast Water Examination · Annual Inspection · PII Safety Exam
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2307342
10 March 2005 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2307371
10 March 2005 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2307402
7 September 2004 Enhanced Seaway Inspection (Massena only) · Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 2185276
3 September 2004 ISPS II Exam · ISPS I Exam · PII Safety Exam
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 2185278
23 May 2004 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2075444
11 February 2004 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2004381
10 February 2004 Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2003825

Deficiency record · 36

10 - Safety of Navigation › N/A - No Subsystem › Voyage data recorder (VDR)/Simplified Voyage data recorder(S-VDR)
Issued 26 August 2025 Resolved
TO ASSIST IN CASUALTY INVESTIGATIONS, CARGO SHIPS, WHEN ENGAGED ON INTERNATIONAL VOYAGES, SHALL BE FITTED WITH A VDR WHICH MAY BE A SIMPLIFIED VOYAGE DATA RECORDER (s-VDR) PSCO OBSERVED SVDR DISPLAYING 02 ALERTS FOR ERROR OF CAPSULE NOT BEING FOUND AND CAPSULE NOT RECORDING DATA. 74SOLAS(20) V/20.2
Action required: 17 - Rectify deficiencies prior to departure
Due 28 August 2025
Resolved 2 September 2025
Resolution: Recieved satisfactory Class and tech reports 29AUG25 (attached).
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 28 July 2025 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 July 2025
Resolution: Received photo evidence of 5 new rations.
07 - Fire Safety › N/A - No Subsystem › Emergency Escape Breathing Device and disposition
Issued 5 June 2025 Resolved
On all ships, within the machinery spaces, emergency escape breathing devices shall be situated ready for use at easily visible places, which can be reached quietly and easily at anytime in the event of fire. The shelf life printed on 02 EEBDs shows expired even though they were serviced by a third party in November 2024, 01 EEBD shows "see user manual" and crew could not provide user manual. SOLAS (20) II-2/13.4.3.1 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2025
Resolution: Class sent survey record and reciept showing purchase of 03 new EEBD. Will be on board before 20JUN25.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 June 2025 Resolved
Two means of escape shall be provided from each machinery space of category A, the emergency exit door from the sterring gear room was padlocked shut, not allowing access out. SOLAS(01)II-2/45.3.1 10c
Action required: 10 - Deficiency Rectified
Resolved 5 June 2025
Resolution: Padlock was unlocked and the antipiracy gate was left open.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 5 June 2025 Resolved
Guard rails fitted on freeboard decks shall have at least three courses. The openings below the lowest course of the guard rails shall not exceed 320mm. The other course shall be not more than 380mm apart. On the STBD side of the ship there is a bottom missing rail, along with one rail detached from the stantion. 66 ICLL (88 Proto) 25(3) 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 June 2025
Resolution: Class sent survey report attesting to guard rails being welded and satisifactory.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 June 2025 Resolved
Hoses specified in this chapter as "Fire Hoses" shall be kept ready for use in conspicuous positions near the water service hydrants or connections. On the main deck, STBD side, the fire hose is not readily available due to storage blocking immediate access. 74 SOLAS (01) II-2/4.7.1 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 June 2025
Resolution: Class sent survey report attesting to stowage being moved and fire hose now readily available for use.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 June 2025 Resolved
Doors fitted in boundary bulkheads of machinery spaces of Category A shall be reasonably gastight and self-clsoing. On 01 of the emergency escpae doors in the engine room the gasket was missing on the bottom and hinge side of the door. 74SOLAS(01)II-2/47.1 10c
Action required: 10 - Deficiency Rectified
Resolved 5 June 2025
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 5 June 2025 Resolved
Cylinders must always be secured and, when not in use, they must be stowed in a rack in an upright position. One oxygen bottle was not properly secured. 46 CFR147.60(b)(1) 10c
Action required: 10 - Deficiency Rectified
Resolved 5 June 2025
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 11 March 2025 Resolved
Each liferaft or group of liferafts shall be stowed with a float free arrangement complying with the requirements of paragraph 4.1.6 of the code so that each floats free and , if inflatable, inflates automatically when the ship sinks. PSCO observed 02 inproperrly installed painter lines, starboard side painter line was installed incorrectly and port side painter line was not connected.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2025
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 September 2018 Resolved
CITE: SOLAS 2004 CONS: CH I REG II(9) The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to set without danger to the ship or persons on board. The main isolation valve servicing the fire main was found with a four-inch fracture on the weld, posing & significant risk to its operation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 September 2018
Resolution: Received class report approving temporary repair of valve until permanent repair can be conducted. Class issued a due date of 17Jan2019.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 14 September 2018 Resolved
CITE: SOLAS 2004 CONS CP II-2 REG 2.2.3.4 For emergency generating sets, a second source of energy shall be provided for an additional three starts within 30 minutes. The secondary means, coil, was non-operational.
Action required: 10 - Deficiency Rectified
Due 14 September 2018
Resolved 14 September 2018
Resolution: The secondary means was corrected on the spot.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 14 September 2018 Resolved
CITE: SOLAS 2004 CONS CH II-2 Reg 2.2.3.4 Oil fuel pipes, which, if damaged, would allow oil to escape from a storage, setting or daily storage tank having a capacity of 500 litres. and above situated above the double bottom, shall be fitted, with a cock or valve directly on the tank capable of being closed from a safe position on the outside the space in which such tanks are situated. The fuel oil shut off valve servicing the emergency diesel generator fuel tank was non-operational from outside the space.
Action required: 10 - Deficiency Rectified
Due 14 September 2018
Resolved 14 September 2018
Resolution: Outside emergency shut off was corrected on the spot.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 3 July 2017 Resolved
1730-OILY WATER SEPARATOR WAS MODIFIED TO DEMONSTRATE OPERATION AND NOT RETURNED TO ORGINAL CONDITION APPROVED BY ADMINISTRATION-MARPOL ANNEX 1/14.6 [10C]
Action required: 705 - Other - as specified
Due 3 July 2017
Resolved 3 July 2017
Resolution: OILY WATER SEPARATOR RETURNED TO ORIGINAL DESIGN APPROVED BY ADMINISTRATION. DNV-GL CLASS SURVEYOR WAS PRESENT AND PROVIDED A STATEMENT WHEN THE SYSTEM WAS MODIFIED FOR DEMONSTRATION TO PSC EXAMINERS IN CANADA
Fire Fighting › Firemans Outfit › Protective Clothing
Issued 3 July 2017 Resolved
0735-Fire Fighting- A fireman outfit shall consist: Protective clothing of material to protect the skin from the heat radiating from the fire and from burns and scalding by steam, 01 FIREMAN'S OUTFIT DOES NOT ADEQUATELY PROTECT THE FIREMAN'S FACE FROM FIRE AND BURNS-SOLAS74(2001 CONS.)II-2/17.1.1.1 -[15C]
Action required: 705 - Other - as specified
Due 31 August 2017
Resolved 22 August 2017
Resolution: Received receipt for purchase of 02 fireman's balaclava's.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 16 June 2016 Resolved
0750 - Fire Prevention - The fire resistance of doors shall be equivalent to that of the division in which they are fitted. The A-clasws paint locker door has multiple openings which compromises its fire protective condition. 74SOLAS (2001 cons) CH II-2/ 47.1
Condition: Placed in Improper Service
Action required: 15 - Rectify deficiencies by next port
Resolved 23 June 2016
Resolution: Successfully repaired fire door. DNV attended the vessel and issued a class report attesting to the repair.
Fire Fighting › International Shore Connection › Connection
Issued 4 June 2012 Resolved
04JUN12 0720- Fire fighting systems shall be kept in good working order and readily available for immediate use. International shore connection not available for immediate use, bolts corroded and painted over. 74 Solas (09) II-2/14.2.1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 June 2012
Resolution: 05JUN12 Coast Guard inspectors examined vessel and found International shore connection in adaquate condition and available for immediate use.
Fire Fighting › Miscellaneous Items › Waste Receptacles
Issued 4 June 2012 Resolved
04Jun12 0710- All waste receptacles shall be contructed of concombustible materials with no openings in the sides or bottom. Receptacles inside engine room were found to be of plastic combustible material. 74 Solas (2001 Cons ed) II-2/18.5.
Action required: 705 - Other - as specified
Resolved 4 June 2012
Resolution: Crew replaced combustible waste receptacles with non-combustible receptacles.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 4 June 2012 Resolved
04Jun12 0710- Doors required to be self closing shall not be fitted with hold back hooks. Main deck stair tower fire door has hold back. 74 Solas (2001 Cons Ed.) II-2/47.2
Action required: 705 - Other - as specified
Resolved 4 June 2012
Resolution: Crew removed hold back mechanism from door.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 4 June 2012 Resolved
04Jun12 0997-The steering Gear components shall include handrails and gratings or other nonslip surfaces. Steering gear compartment did not contain any nonslip material. 74 Solas (2004 Cons ed) II-1/29.13.2
Action required: 705 - Other - as specified
Due 4 July 2012
Resolved 20 November 2017
Navigation › Piloting/Steering › Gyro Compass
Issued 14 December 2009 Resolved
1540 - Gyrocompass - Each VSL must have an operating gyrocompass. Vessel's Notice of Arrival noted that the gyrocompass was inoperable. 33 CFR 164.35(d)
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2009
Resolution: Received Technician''s report attesting to the repair of the gyrocompass.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 8 January 2009 Resolved
1150 - Loadings and Unloading Equipment - Ships shall be designed, constructed and maintained in compliance with structural requirements of a classification society. Vessel's forward crane jib support sustained damage while vessel was underway due to heavy weather. Jib has to be welded to deck at three locations.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2009
Resolution: Received class report from agent via fax attesting to proper repair of #1 crane jib. Deficiency cleared.
Engineering › Diesel Engine (propulsion-direct drive) › Cylinder Head
Issued 6 October 2008 Resolved
Vessel experienced a power loss due to a failure of the No. 6 cylinder rocker arm assembly allowing cooling water to drain into the crankcase disrupting suction.
Action required: 705 - Other - as specified
Due 6 October 2008
Resolved 6 October 2008
Resolution: Recieved class report from Lloyds Register satisfying requirement.
Electrical › Electrical Distribution System (service) › Wiring
Issued 10 March 2007 Resolved
Vessel's Forecastle was flooded with seawater, resulting in all electrical equipment and wiring being compromised. SOLAS 74/78 (04 Cons) II-I/45-1.3.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2007
Resolved 22 March 2007
Resolution: Received class survey report attesting to satisfactory condition of forecastle.
Fire Fighting › Fire Pumps › Power Source
Issued 10 March 2007 Resolved
Emergency fire pump inoperative due to forecastle flooding. SOLAS 74/78 (04 Cons.) II-2/22.2
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2007
Resolved 22 March 2007
Resolution: Observed satisfactory operation of em. fire pump, class attested to proper installation and operation.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 10 March 2007 Resolved
Emergency escape trunk lighting inoperative. SOLAS 74/78 (04 Cons) II-I/43.2
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2007
Resolved 22 March 2007
Resolution: Received class survey rpt indicating the light was now operative.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 10 March 2007 Resolved
Oily water separator is inoperable. During operational test of ows pump not operating, resulting in system unable to process bilge water. MARPOL 73/78 Ann I/16
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2007
Resolved 22 March 2007
Resolution: Received class rpt indicating proper operation of the vessel’s OWS.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 10 March 2007 Resolved
Major non conformities vessels sms: Crew unfamiliar with ows operation and operation of vessels incinerator; Vessel did not conduct a pre arrival check prior to entering the port of Philadelphia; Failure to complete non conformity reports for missing fixed fwd piping as part of engine room aft bilge suction line and inop OWS; failure to perform an effective fire drill.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2007
Resolved 19 March 2007
Resolution: An satisfactory external audit was conducted by the RO (GL) identifying 05 non conformities issued to the company for action, and rectifying all ISM related requirements. See the narrative for more details.
Personnel › Training › Fire Fighting Basic
Issued 10 March 2007 Resolved
Crew failed to conduct a satisfactory fire drill as evidenced by miscommunication between the bridge and reporting party and inability to respond in a timely manner. SOLAS 74/78 (04 Cons) III/18.3.4
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2007
Resolved 22 March 2007
Resolution: Observed satisfactory fire drill also received GL survey rpt indicating satisfactory fire drill.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 10 March 2007 Resolved
Vessel crew did not receive adequate rest to perform duties, all vessels crew must observe adequate rest periods prior to performing vessels duties. STCW 95 VIII.1
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2007
Resolved 22 March 2007
Resolution: Vessel received satisfactory rest to perform vessel duties.
Operations/Management › Navigation Safety › Arrival/Departure Tests
Issued 10 March 2007 Resolved
Vessel did not perform prearrival tests required by 33CFR164.25
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2007
Resolved 19 March 2007
Resolution: A non conformity was issued by GL pending company action, and an NOV was issued by USCG.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 29 September 2006 Resolved
Under water portion of echo depth sounder is not operational. LOD granted for inbound and outbound transit.
Action required: 705 - Other - as specified
Due 31 January 2007
Resolved 10 March 2007
Resolution: Vessel installed functional echo depth sounder with recorder.
Navigation › Piloting/Steering › US Coast Pilot
Issued 10 March 2005 Resolved
Vessel needs to correct or purchase a new US Coast Pilot. Cite: 33 CFR 164.33
Action required: 17 - Rectify deficiencies prior to departure
Due 12 March 2005
Resolved 10 March 2005
Resolution: Vessel obtained a new and updated US Coast Pilot.
Personnel › Certificates/Documents/Licenses
Issued 10 February 2004 Resolved
Provide Flag State Endorsements For Officers in Accordance with STCW 95 Reg I/10 Prior to next US port LEGACY COMPONENT DESC: STCW Endorsement
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 23 May 2004
Resolution: RECEIVED LLOYD''S CLASS REPORT CLEARING DEFICIENCY.
Fire Fighting › Combustible Materials
Issued 10 February 2004 Resolved
Prove to the satisfaction of class that wood products used in stairwell is not a Restricted Combustible Material in Accordance with SOLAS CH II-2 Reg 49 Prior to next us port LEGACY COMPONENT DESC: Paints/Varnishes/Other Finishes
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 23 May 2004
Resolution: RECEIVED LLOYD''S CLASS REPORT CLEARING DEFICIENCY.
Accommodation/Occupational Safety › Occupational Safety
Issued 10 February 2004 Resolved
Prove proper operation of door closer in stairwell on port side by messdeck in Accordance with SOLAS CH II-2 reg47
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 23 May 2004
Resolution: RECEIVED LLOYD''S CLASS REPORT CLEARING DEFICIENCY,
Electrical
Issued 10 February 2004 Resolved
Properly install Radiator Heater on Bridge In Accordance with SOLAS CH II-1 Reg 45
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 23 May 2004
Resolution: RECEIVED LLOYD''S CLASS REPORT CLEARING DEFICIENCY.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.