MAURY USCG vessel records Sign in
← All vessels

SEA HORIZON

SEA HORIZON is a 2003 tank ship. The Coast Guard has recorded 44 inspections since 2004, most recently in March 2022, along with 30 deficiencies and 11 operational controls.

Records from 2004 to 2022. Most recent: inspection, 21 March 2022.

Built
2003
Last inspected
21 March 2022
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9258026 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
V7A4999
669444
Flag
MALTA
—
Maury page id
psix-669444

Inspections, by type

…with no type recorded14
Years with a record 16 calendar years (2004–2022)
The 44 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it28529 - Convention (Subpart B), Gross Ton
12315 - Convention (Subpart B), Net Ton
47149 - Dead Weight, Ton
56524 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 44

21 March 2022 COC-TVE Annual · PSC B · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7414375
23 January 2021 COC-TVE Renew · Ballast Water Examination · PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7129364
22 January 2021 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7130163
19 January 2021 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7126861
10 September 2020 PSC B · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7055210
28 February 2020 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6916893
31 January 2020 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6900720
30 January 2020 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6902235
17 December 2019 COC-TVE Annual · Ballast Water Examination · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6873393
6 July 2019 Random ISPS/MTSA/PSC
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6734736
2 July 2019 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6733460
15 February 2019 MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6623888
11 December 2018 COE-Dockside · COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6591346
19 May 2017 Ballast Water Examination · ISPS III Exam · PII Safety Exam
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6150267
23 December 2016 COE-Administrative
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6061674
14 November 2016 Ballast Water Examination · ISPS II Exam · PII Safety Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6040390
5 October 2016 COC-TVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6016426
5 October 2016 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6017053
16 August 2016 COE-Dockside
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5974227
17 September 2015 COC-TVE Renew · ISPS II Exam · Ballast Water Examination · COE-Offshore
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5721261
21 May 2012 NPV Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4317618
10 August 2011 Ballast Water Examination · ISPS II Exam · COC-TVE Renew · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4111095
14 January 2011 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3926500
7 December 2010 COC-TVE Annual · PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3905988
13 February 2008 MARPOL Annex V Examination · MARPOL Annex I Examination · ISPS III Exam · COC-TVE Annual · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3145067
14 January 2008 Type not recorded
No type recorded · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3130157
12 January 2008 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3129196
7 January 2008 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3125809
28 May 2007 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2944068
30 March 2007 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2897136
12 March 2007 COC-TVE Annual · ISPS II Exam · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2886381
22 August 2006 ISPS III Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2755655
22 February 2006 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2590259
6 February 2006 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2580161
5 February 2006 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 2576848
5 February 2006 MARPOL Annex V Examination · MARPOL Annex I Examination · COC-TVE Renew · Ballast Water Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 2579417
5 February 2006 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2579538
22 September 2005 ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2498452
4 May 2005 COC-TVE Annual · MARPOL Annex V Examination · MARPOL Annex I Examination · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2348868
23 April 2005 Type not recorded
No type recorded · Station Fort Lauderdale · USCG Southeast District (CGD-SE) · Activity 2345510
20 April 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2339094
15 July 2004 PII Safety Exam
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2133809
9 July 2004 ISPS II Exam
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2127684
24 February 2004 Certificate of Compliance
Administrative · Marine Safety Detachment American Samoa · USCG Oceania District (CGD-O) · Activity 2012540

Deficiency record · 30

07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 17 December 2019 Resolved
07102 - Fire Saftey - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will fit to proceed to sea without danger to the ship or persons on board. PSCO observed leakage in the scrubber sea water supply hose fitting. SOLAS 74(2004) I/11-(a) 10c
Action required: 10 - Deficiency Rectified
Resolved 17 December 2019
Resolution: Repaired and changed hose fitting.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 17 December 2019 Resolved
07102 - Fire Safety - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will fit to proceed to sea without danger to the ship or persons on board. PSCO observed oxygen sampling line installed using velcro and metal bending strap. SOLAS 74(2004) I/11-(a) 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 28 February 2020
Resolution: Received Class Report; inspected satisfactory repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 17 December 2019 Resolved
09211 - Working Conditions - The boilers associated piping systems and fittings shall be of a design for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to hot surfaces. PSCO observed leaking steam valve adjacent to #2 cargo pump turbine. SOLAS 74(2001) II-1/26.1 10c
Action required: 10 - Deficiency Rectified
Resolved 17 December 2019
Resolution: Repaired steam valve.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 July 2019 Resolved
02199 - Structural - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Prior to arrival into the port of New Haven, CT, the crew observed a two inch crack on the pipeline (W 640-50-22G) that conntacts from the seachest to the marine growth protection system. Solas 74 (2014 Cons.) I/11(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 July 2019
Resolved 8 July 2019
Resolution: Received Class Report attesting to repairs made to the w-640-50-22g pipeline.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 6 July 2019 Resolved
14104 - Pollution Prevention - The PSCO belives that there are clear grounds for believing that the master or crew are not familiar with essential shipboard procedures relating to the prevention of pollution by oil MPEC 107(49) states "Ship staff training should include familiarization in the operation and maintenance of the equipment." A new oil content meter was installed 17MAY2019. The engineering department was unaware how to retrieve information from the oil content meter. MARPOL 73/78 (2017 Cons.) I/14.6
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 July 2019
Resolution: Sector Long Island Sound received a Class report attesting to the competence of the Chief Engineer relating to the Oil Processing System and components.
01 - Certificates & Documentation › 011 - Ships Certificates › International Oil Pollution Prevention (IOPP)
Issued 6 July 2019 Resolved
01117 - Certificates & Documentation - After any survey of the ship, no change shall be made in the structure, equipment systems, fittings, arrangements or material covered by the survey. PSCO observed that the IOPP certificate reflected that the oil content meter is apporved in accordance with MPEC 60(33) however vessel is fitted with an oil content meter that is apporved in accordance with MPEC 107(49). Provide clarification from classification society reflecting correct information. MARPOL 73/78 (2017 Cons.) I/6.4.2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 July 2019
Resolution: Sector Long Island Sound received a Class Report attesting to the amendment made to the IOPP to reflect the 107(49) Oil Content Meter.
01 - Certificates & Documentation › 011 - Ships Certificates › International Oil Pollution Prevention (IOPP)
Issued 6 July 2019 Resolved
01117 - Certificates & Documentation - The International Oil Pollution Prevention certificate shall be drawn up in the form corresponding to the model given in appendix II. IOPP Form B supplement indiciates capacity of incinerator is 580 kW, however manufacturer plate indicates maximum capacity of incinerator is 417 kW. MARPOL 73/78 (2017 Cons.) I/9
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 July 2019
Resolution: Sector Long Island Sound Received a Class Report stating that the IOPP Supplement was updated to remove the Incinerator Capacity Specification in Section 3.2.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 15 February 2019 Resolved
The vessel shall prevent the ignition of combustible materials or flammable liquids and shall provide means to control leaks of flammable liquids. PSCO observed mulitple fuel oil leaks on the #1 and #2 generators on multiple cyclinders and a fuel oil leak on the #4 cyliner of the main diesel engine.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 17 February 2019
Resolution: Received class report attesting to proper repair of Fuel injectors.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 February 2019 Resolved
The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces, and other hazards. PSCO observed a substantial leak of feedwater and stear from the auxillary boiler recirculating pumps #1 and #2, multiple steam leaks from fuel trace lines, and a rubber hose being run from steam pressure relief valve to the cascade tank.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 February 2019
Resolution: Received class report attesting to the overhaul of auxiliary boiler pumps, and steam leaks from trace lines.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 February 2019 Resolved
The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces, and other hazards. PSCO observed sumbstanital leak on the jacket water system for the generators at teh three way vavle just before the heat exchanger.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2019
Resolution: Received class report attesting to overhaul of three way valve with no leak after repair.
14 - Pollution Prevention › 141 - MARPOL Annex I › Retention of oil on board
Issued 15 February 2019 Resolved
Oil Residues (sludge) tanks shall be provided and shll be of adequate capacity having regard to the type of machiner and length of voyage, to receive the oil residues (sludge) which requirements of the Annex. Class Clarification on sludge capacity of vessel for next intended voyage. Vessel has sludge in seperating bilge oil tank and lube oil settling tank.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 June 2019
Resolution: Received class report that tanks were dischartged to a tank barge and vessel had enough capacity for next voyage.
01 - Certificates & Documentation › 012 - Crew Certificates › Endorsement by flagstate
Issued 11 December 2018 Resolved
A seafarer is allowed to serve for a period not exceeding three months on board a ship entitled to fly it's flag. PSCO observed the chief engineers application to Malta flag for flag endorsemment is greater than three months old. STCW 1/10.5 17ac
Action required: 17 - Rectify deficiencies prior to departure
Due 12 December 2018
Resolved 13 December 2018
Resolution: Vessel submmited classification society survey.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 December 2018 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service they are intended. PSCO observed the forward general service fire pump leaking excessively. 74 SOLAS (01) II-1/26 17ac
Action required: 17 - Rectify deficiencies prior to departure
Due 12 December 2018
Resolved 13 December 2018
Resolution: Vessel submmited classification society survey.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 11 December 2018 Resolved
Every lifeboat shall consist of water receptacles containing a total of 3 liters of fresh water for each person the lifeboat is permitted to accommodate. PSCO observed lifeboats were not equipped with adequate water rations for the entire complement of the lifeboat. 74 SOLAS (14) III/34 LSA CODE 4.4.8.9
Action required: 17 - Rectify deficiencies prior to departure
Due 12 December 2018
Resolved 13 December 2018
Resolution: Vessel submmited classification society survey.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 11 December 2018 Resolved
Every lifeboat shall consist of a food ration of not less than 10,000 KJ for each person the lifeboat is permitted to accommodate. PSCO observed lifeboats were not equipped with food rations for the entire complement of the lifeboat. 74 SOLAS (14) III/34 LSA CODE 4.4.8. 17ac
Action required: 17 - Rectify deficiencies prior to departure
Due 12 December 2018
Resolved 13 December 2018
Resolution: Vessel submmited classification society survey.
Deck/Cargo › Ballast › Piping
Issued 8 October 2016 Resolved
PSCO was informed by pumpman and 3rd Officer that a ballast line in the cargo pump room had a leak and was subsequently repaired. The crew was unable to provide any documentation demonstrating that the crew made the proper notifications per their SMS to their company, class, and flag to inform them of the temporary repairs, or that the temporary repairs were approved by class. See Form B for more.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 November 2016
Resolution: VESSEL PROVIDED CLASS REPORT THAT REPAIRS HAD BEEN MADE
Deck/Cargo › Holds/Tanks › Fixed Gas Detection
Issued 6 October 2016 Resolved
When entering the pump room, PSCO observed the alarm had activated despite the space being recently certified safe for workers by a Marine Chemist. The PSCO questioned the vessel's Pumpman and 3rd Officer about the alarm, who explained that a ballast line had gasket had leaked in the space, flooding the lower gas detection sensors.
Action required: 705 - Other - as specified
Resolved 8 October 2016
Resolution: See ABS Survey in documents
Deck/Cargo › Holds/Tanks › Portable Gas Measuring Equipment
Issued 5 October 2016 Resolved
Tankers shall be equipped with at least one portable instrument for measuring oxygen and one for measuring flammable vapors concentrations. Together with a sufficient set of spares, suitable means shall be provided for the calibration of such instruments. Portable gas detection meters are not able to be calibrated due to incorrect span gas on board.
Action required: 705 - Other - as specified
Resolved 8 October 2016
Resolution: See ABS Survey in documents
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 5 October 2016 Resolved
During an expanded exam of the SMS, with a focus on reporting requirements, PSCO observed crew was not following confined space entry procedures, and not reporting fixed and portable gas detection deficiencies since at least 015JUN2016. Additionally, PSCO identified falsified cargo operations checklists requiring the crew to calibrate portable gas and oxygen meters. The checklists show the task be
Action required: 705 - Other - as specified
Resolved 8 October 2016
Resolution: See ABS Survey in documents
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 21 May 2012 Resolved
2540- Safety Management System -The vessel failed to respond to an onboard fire as required in their Safety Management Manual- SOLAS CHAP. IX REG 3.1
Action required: 17 - Rectify deficiencies prior to departure
Due 21 May 2012
Resolved 22 May 2012
Resolution: RO verified that the vessel responded correctly to the incident and no non-conformity was required.
Operations/Management › Vessel Safety Management › Resources and Personnel
Issued 21 May 2012 Resolved
2510- SAFETY MANAGEMENT- Vessel could only provide records for 12 of the 21 crew onboard have received the required familiariazation training, specified by their safety management system. SOLAS CHAP IX REG 3.1. SOLAS CHAP III REG 2.1
Action required: 17 - Rectify deficiencies prior to departure
Due 21 May 2012
Resolved 22 May 2012
Resolution: RO verified non-conformity and Company is taking corrective action to prevent reoccurence
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 21 May 2012 Resolved
2555- SAFETY MANAGEMENT -Vessel is not submitting forms RB-011 or CMS-011. These forms are required by their safety management system. SOLAS CHAP IX REG 3
Action required: 17 - Rectify deficiencies prior to departure
Due 21 May 2012
Resolved 22 May 2012
Resolution: RO identified the failure as a non-conformity and Company is taking corrective action
Operations/Management › Vessel Safety Management › Safety/Environmental Protection Policy
Issued 21 May 2012 Resolved
2565- SAFETY MANAGEMENT -Based on Deficiencies 2,3 and 4, the PSCO has objective evidence that a major non-comformity exists with regards to the implementation of the safety management system on board. An external audit is requested. SOLAS CHAP I REG 19, SOLAS CHAP IX REG 6
Action required: 17 - Rectify deficiencies prior to departure
Due 21 May 2012
Resolved 22 May 2012
Resolution: An audit was conducted by RO, and 03 non comformities were noted, to be dealt with at the schedule imposed by Class.
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 21 May 2012 Resolved
1430- MAINENTANCE OF EQUIPMENT -#1 Generator turbo charger malfunctioned causing burning embers and carbon soot to be emitted out of the exhaust stack. SOLAS CHAP I REG 11
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 22 May 2012
Resolution: Class verified new installation of turbo charger, and proper function of # 1 auxiliary generator
Engineering › Steering Gear System › Pump
Issued 7 December 2010 Resolved
Observed hunting in steering system only when #1 steering pump was in operation and given portside commands.
Action required: 705 - Other - as specified
Due 14 December 2010
Resolved 8 December 2010
Resolution: Recieved class report attesting to the proper operation of #1 steering pump.
Construction/Loadline › Hull › Hull Plating
Issued 7 December 2010 Resolved
vessel hull in way of the wind waterline is covered with barnaces that present a hazard to the marine environment.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 January 2011
Resolution: Recieved class report and photo''s of the hull.
Navigation › Collision/Grounding Avoidance › Radar
Issued 14 January 2008 Resolved
Vessel has inoperable radar.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2008
Resolution: Received Technician Report attesting to radar repairs.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom
Issued 12 March 2007 Resolved
Make cargo pumproom available for inspection at next U. S. port. Vessel had obtained marine chemist's certificate but failed to maintain conditions of certificate, thereby invalidating it.
Action required: 15 - Rectify deficiencies by next port
Resolved 30 March 2007
Resolution: Pump Room cleared by a marine chemist and inspected satisfactory.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom
Issued 4 May 2005 Resolved
Certified Marine Chemist was unavailable to certify pumproom "Safe for Workers" prior to COC-T Annual to allow USCG Inspectors to inspect cargo pumproom. Prior to conducting cargo operations, have Certified Marine Chemist certify pumproom "Safe for Workers" and fax a copy of report to COTP NY.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2005
Resolved 5 May 2005
Resolution: Received certified marine chemist report for pumproom. Deficiency cleared, vessel cleared to conduct cargo operations.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom
Issued 24 February 2004 Resolved
PUMPROOM NOT INSPECTED BECAUSE THERE IS NO MARINE CHEMIST IN THE TERRITORY TO CERTIFY THE CARGO PUMPROOM SAFE FOR ENTRY.
Action required: 15 - Rectify deficiencies by next port
Due 16 July 2004
Resolved 16 July 2004

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.