Records from 2004 to 2014. Most recent: inspection, 1 October 2014.
Inspection history · 18
1 October 2014
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4997002
16 May 2014
COI Inspection · Examination of Repairs · Inclining Experiment · Internal Structural Exam · Hull Examination · MTSA Verification · Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4859981
29 June 2012
Internal Structural Exam · Annual Inspection · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4360674
2 December 2011
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4200093
24 June 2008
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3246162
4 June 2008
Deficiency Check · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3229173
30 July 2007
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3011834
1 June 2006
Re-Inspection · Hull Examination · MTSA Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2685655
23 January 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2571379
26 October 2005
Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2522698
7 October 2005
Damage Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2509248
5 October 2005
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2526938
7 April 2005
Internal Structural Exam · MTSA Verification · Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2329333
4 March 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2303581
10 February 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2290230
19 November 2004
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2244350
14 May 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2067557
14 April 2004
Hull Examination · Initial Construction-Excluding Oversight · Initial Certification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2043992
Documentation › Certificates/Documents › Stability Letter
Issued 16 May 2014
Resolved
Vessel must obtain new stability letter prior to departure from port.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 July 2014
Resolution: Recieved ABS Stability Letter.
Construction/Loadline › Structures › Superstructure
Issued 4 June 2008
Resolved
Repair fractures in 6 inside stringers and doubler plates attached to the inboard bulwarks on the bow.
Action required: 705 - Other - as specified
Due 18 June 2008
Resolved 18 June 2008
Engineering › Bilge Water Management System › Strainer
Issued 4 June 2008
Resolved
Install a strainer on the bilge suction pipie in the forepeak.
Action required: 705 - Other - as specified
Due 18 June 2008
Resolved 18 June 2008
Engineering › Fuel Oil Service System › Filter
Issued 30 July 2007
Resolved
Remove the petcock on all fuel oil filters and install metal plugs as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 30 August 2007
Resolved 13 August 2007
Resolution: The pet cocks were removed from all fuel oil filters and plugged.
Engineering › Fuel Oil Service System › Piping
Issued 30 July 2007
Resolved
Make repairs to the fuel oil pipe and flange assembly to stop fuel oil leak in the machinery room as required by 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 30 August 2007
Resolved 13 August 2007
Resolution: The piping assembly was taken down and all of the gaskets were replaced.
Engineering › Diesel Engine (propulsion-electric) › Crankcase
Issued 30 July 2007
Resolved
Make repairs to secure the excessive lube oil leaks on the port main engine and also on both ship service generator as required by 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 30 August 2007
Resolved 13 August 2007
Resolution: New gaskets were installed on the fuel pump of the generator and bolts were tighten to secure the leaks.
Engineering › Steering Gear System › Hydraulic Hose
Issued 30 July 2007
Resolved
Tighten all fittings in the hydraulic lines for the steering system in the lazarette to secure all leaks as required by 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 30 August 2007
Resolved 13 August 2007
Resolution: All of the fitting were tighten to secure the leaks.
Engineering › Generator (propulsion-electric) › Winding
Issued 30 July 2007
Resolved
Clean the windings in both ship service generators by removing all oil and grime as required by 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 30 August 2007
Resolved 13 August 2007
Resolution: The generator windings were cleaned by Armstrong Electric.
Fire Fighting › Ventilation Systems › Fans
Issued 30 July 2007
Resolved
Remove all oil form the exhaust fan and the exhaust fan housing and the area around the same as required by 46 CFR 176.800..
Action required: 705 - Other - as specified
Due 30 August 2007
Resolved 15 August 2007
Resolution: Removed all oil from the exhaust fan and the exhaust fan housing and the area around the same as required by 46 CFR 176.800.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 30 July 2007
Resolved
Replace grab line on 30" ring life buoys on the bow and aft of the house on starboard side, replace 60' tending line on ring life buoy on the bow as per 46 CFR 180.70.
Action required: 705 - Other - as specified
Due 30 August 2007
Resolved 13 August 2007
Resolution: Two new life ring were purchased to replace the existing ring buoys.
Construction/Loadline › Hull › Hull Plating
Issued 26 October 2005
Resolved
Repair or renew damaged hull plating, frames, and skeg in way of generator space, one frame aft of forward bulkhead and aft through the next two transverse frames, from the second longitudinal frame starboard of the skeg and port through the next four frames to the third longitudinal frame port of the skeg.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 October 2005
Resolution: MSO Morgan City completed hull survey and cleared the deficiency.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 7 April 2005
Resolved
clean fuel/oil from engine room bilges.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 April 2005
Construction/Loadline › Penetrations › Gasket
Issued 7 April 2005
Resolved
replace gasket material on fwd escape hatch, passenger compartment.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 April 2005
Engineering
Issued 14 April 2004
Resolved
Provide propulsion control plans for approval.
Action required: 705 - Other - as specified
Due 27 July 2004
Resolved 2 June 2004
Resolution: Provided.