Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it5320 - Convention (Subpart B), Gross Ton 9250 - Dead Weight, Ton 2910 - Convention (Subpart B), Net Ton 5320 - Simplified, Gross Ton 2910 - Simplified, Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 12 February 2021Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7mm diameter and is at least 25.4mm long. The required stud is missing.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 February 2022
Resolution: Verified installation on board.
The SOPEP shall have a section of the plan that contains a geographic specific apppendix for each COTP zone in which the vessel operates. The SOPEP's appendix of COTP zone contacts is out of date and incorrect.
Action required: 705 - Other - as specified
Due 19 February 2021
Resolved 15 February 2022
Resolution: Verified updated SOPEP while on board.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 8 October 2019Resolved
Gooseneck vent screens were all found to be below acceptable corrosion, with some exceptionally worn.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 October 2019
Resolved 14 February 2020
Resolution: Picture received showing installed flame screens.
gaskets at knife edge for watertight doors on deck found to be cracked and worn beyond acceptance.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 October 2019
Resolved 14 February 2020
Resolution: Picture received showing new gaskets installed on doors.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 8 October 2019Resolved
pump house on deck did not maintain NFPA standards for proximity to hazardous location
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 October 2019
Resolved 14 February 2020
Resolution: Picture received showing holdbacks removed and that training was administered.
09 - Working and Living Conditions › 092 - Working Conditions › Stowage of cargo
Issued 8 October 2019Resolved
Various lifesaving, firefighting, and damage control equipment improperly stowed as gear adrift (general housekeeping condition)
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 October 2019
Resolved 14 February 2020
Resolution: Received a picture showing all loose housekeeping items being stowed properly.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 27 November 2018Resolved
The last 1.0 meter (3.3 feet) of vapor piping upstream of the vessel vapor connection and each end of a vapor hose must be painted in the sequence of red/yellow/red. The width of the red bands must be 0.1 meter (0.33 foot) and the width of the middle yellow band must be .08 meter (2.64 feet); and labeled with the word "VAPOR" painted in black letters at least 50.8 millimeters (2 inches) high. Vessel did not have any markings on the vapor piping.
46 CFR 39.2001(h)
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 30 November 2018
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 November 2018Resolved
Means shall be provided to control leaks of flammable liquids. The #2 diesel driven cargo pump was leaking flammable liquids (cargo) at the pump housing connection to the cargo piping.
74SOLAS(14)II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 30 November 2018
Electrical › Electrical Distribution System (service) › Cable
Issued 29 October 2012Resolved
Vessel had a section of frayed cable in the cargo pump room leading to a cargo pump tachometer. 46CFR111.105-17. Vessel is required to rectify the deficiency prior to next US port after sailing foreign, to the satisfaction of ABS class society and the Coast Guard.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 November 2012
Resolution: Received tech rpt and pictures of repair.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.