Records from 2004 to 2026. Most recent: inspection, 8 June 2026.
Documentation record
Registered dimensions (L × B × D)73.0 ft × 32.0 ft × 7.0 ft
Registered tonnagegross 169 / net 115
ITC dimensions (L × B × D)73.0 ft × 32.0 ft × 7.0 ft
ITC tonnageNot recorded
BuilderDAKOTA CREEK INDUSTRIES INC · ANACORTES, WA, UNITED STATES · built 2004
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portSAN FRANCISCO, CA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 30 January 2026 · expires 31 January 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it169 - Regulatory (Subpart C or D), Gross Ton
115 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 29
8 June 2026
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8395241
4 May 2026
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8361979
27 June 2025
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8174379
7 June 2025
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8156448
7 June 2025
Deficiency Check · Examination of Repairs
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8158908
23 April 2025
COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8118165
3 February 2025
Examination of Repairs
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8075873
15 May 2024
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7918208
29 September 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7802221
27 September 2023
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7802223
3 July 2021
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7250104
15 April 2021
Administrative Inspection · Initial Certification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7170087
16 February 2021
Deficiency Check · Examination of Repairs
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7141507
7 August 2020
Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7026640
18 June 2019
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6735065
14 June 2018
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6456071
7 March 2018
MTSA Verification · Spot Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6367901
9 September 2017
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6270586
9 July 2017
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6208040
20 August 2015
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5227287
29 July 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4938180
17 July 2013
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4661558
3 October 2012
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4457454
25 June 2012
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4360190
8 May 2012
Administration
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4780355
4 July 2011
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4086109
11 May 2010
Industry Initiated Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3742368
9 November 2006
MTSA Verification · Uninspected Other
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2832444
3 May 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2058700
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 May 2026
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The starboard main engine is inoperable due to a faulty ECM.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 May 2026
Resolution: ECM was replaced and tested satisfactorily by technician.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 May 2026
Resolved
Complete but simple instructions for the operation of the systems must be located in a conspicuous place at or near all pull boxes, stop valve controls and in the CO2 cylinder storage room. On systems in which the CO2 cylinders are not within the protected space, these instructions must also include a schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate. There were no instructions in the CO2 cylinder storage room or schematic diagram detailing alternate methods of discharging the system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2026
Resolved 26 June 2026
Resolution: Placards of instructions installed onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 May 2026
Resolved
All lifesaving equipment must be tested and maintained in accordance with the minimum requirements of § 199.190 of this chapter. Life ring buoy lights found with incorrect battery type.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2026
Resolved 15 June 2026
Resolution: New batteries of the correct type installed in life buoy light.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 27 May 2026
Resolved
The master must ensure that all lifesaving equipment is properly maintained and ready for use at all times. The port and starboard life raft painter lines were not connected to the weak link on the hydrostatic release unit inhibiting activation of the life raft.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 27 May 2026
Resolution: Life raft was properly connected to hydrostatic release unit.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 7 June 2025
Resolved
Towing vessels are required to have a steering system that is operational. While operating, T/V AVIK reported having a non-operational steering system due to the loss of 03 out of 03 rudders. Vessel is required to re-install 03 operational rudders and have them inspected by a Coast Guard Marine Inspector prior to the carriage of cargo and prior to barge operations. To clear this 835 the following needs to occur during the welding process:
1. Show evidence of having qualified welders
2. Prior to welding, welding procedures and plan needs to be approved by Coast Guard Inspector
3. All welding prep work needs to be approved by CG Inspector before continuing to next step.
4. Fit-up needs to be approved by CG Inspector before continuing to next step.
5. Final weld and NDT needs to be inspected physically by CG Inspector.
Additionally the vessel is required to undergo CG inspection of the propellers, propeller shaft and hull for possible damage that occurred during the event when the vessel touched bottom.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 August 2025
Resolved 16 June 2025
Resolution: All repairs completed satisfactoraly
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 23 April 2025
Resolved
If Dedicated storage cabinet is provided, it must be secured to the vessel so that it does not move. Inspector observed cabinet outside of Captain's stateroom that was not secured to the bulkhead. 46CFR142.225(c)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 4 June 2025
Resolved 8 May 2025
Resolution: Vessel affixed cabinet to the bulkhead.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 April 2025
Resolved
There must be an installed bilge pump for emeregency dewatering. Bigle suction was inoperable in the lazarette due to having power supply disconnected. 46CFR143.275
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 4 June 2025
Resolved 8 May 2025
Resolution: Bigle suction was connected back to power and is now operable.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 April 2025
Resolved
A fixed fire pump must be capable of delivering water from hydrants. Inspector observed fire pump could not deliver any water because a valve was jammed shut and could not be opened for 45 minutes. 46CFR142.325
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 4 June 2025
Resolved 8 May 2025
Resolution: Valve was fixed and the fire pump was able to deliver water to the hydrants.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 April 2021
Resolved
All installed bilge piping must have a check/foot valve in each bilge suction that prevents unintended backflooding through bilge piping. All installed bilge suction piping does not have check/foot valve.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 15 November 2021
Resolved 16 June 2025
Resolution: repais complete.
25 June 2012Routine · role: Involved in a Marine Casualty · activity 4360190
3 October 2012Routine · role: Involved in a Marine Casualty · activity 4457454
17 July 2013Routine · role: Involved in a Marine Casualty · activity 4661558
9 September 2017Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6270586
14 June 2018Routine · role: Involved in a Marine Casualty · activity 6456071
18 June 2019Routine · role: Involved in a Marine Casualty · activity 6735065
3 July 2021Routine · role: Involved in a Marine Casualty · activity 7250104
27 September 2023Routine · role: Involved in a Marine Casualty · activity 7802223
7 June 2025Routine · role: Involved in a Marine Casualty · activity 8156448
27 June 2025Routine · role: Sighted in Area · serious marine incident, as classified · 1 injured · activity 8174379
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source:
IIR, through 2026.