Records from 2004 to 2025. Most recent: inspection, 9 December 2025.
Documentation record
Registered dimensions (L × B × D)35.0 ft × 12.0 ft × 5.0 ft
Registered tonnagegross 14 / net 11
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderLATITUDE MARINE · LA CONNER, WA, UNITED STATES · built 2004
Hull materialAluminum
PropulsionDiesel Outdrive
Hull shapeShip
Hull configurationMonohull
Hailing portANACORTES, WA
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 11 August 2026 · expires 30 September 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it14 - Simplified, Gross Ton
11 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 24
9 December 2025
Administrative Inspection · Annual Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8280247
17 December 2024
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8049484
12 December 2023
Internal Structural Exam · Drydock Exam · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7831884
13 December 2022
Internal Structural Exam · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7612483
3 December 2021
Internal Structural Exam · Drydock Exam · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7362058
8 December 2020
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7107994
2 December 2019
Annual Inspection · DAPI Audit · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6865884
19 November 2019
Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6856975
4 December 2018
Annual Inspection · DAPI Audit · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6587146
13 December 2017
Drydock Exam · DAPI Audit · Annual Inspection · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6318960
11 September 2017
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6264578
14 December 2016
Administrative Inspection · DAPI Audit · Internal Structural Exam · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6048454
7 January 2016
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5792246
16 December 2015
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5782795
7 December 2011
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4203966
4 January 2011
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3925065
10 December 2009
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3650867
10 December 2009
Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3650972
29 April 2009
Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3463987
29 December 2008
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3386058
14 December 2007
Annual Inspection · Hull Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3115758
13 October 2005
Annual Inspection · Hull Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2513554
10 February 2005
Damage Survey · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2290259
3 September 2004
Initial Certification
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2170533
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 9 December 2025
Resolved
A pre-engineered fix gas fire extinguishing system must.....automaticially shut down all power ventilation systems and all engines that draw intake air from within the protected space. Upon testing, the system only secured the STBD main engine. The vessel rep identified a faulty relay in the system. MI witnessed proper operation.
46 CFR 181.420
Action required: 10 - Deficiency Rectified
Due 16 December 2025
Resolved 9 December 2025
Resolution: The vessel rep identified a faulty relay in the system. MI witnessed proper operation.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 8 December 2020
Resolved
Vessel is to have current and valid Certificate of Documentation on boat. Vessels COD is expired and waiting for renewal.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 January 2021
Resolved 31 December 2020
Resolution: Vessel received COD, sent in picture.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 2 December 2019
Resolved
46 CFR 180.137 (b)(2). The float free link was designed for life float of 21 passengers of more and was not satisfactory for a 15 passenger life float. Install float free link of proper strength for the size of life float on identifiaction tag.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2020
Resolved 16 December 2019
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 19 November 2019
Resolved
Approx. 45 cracks and fractures were identified, localized around four adjacent frame bays amidships. The failures included one through thickness fracture of the hull. Numerous "v + weld" repairs noted in same general area. Vessel history indicates significant failures in same location caused by the normal working of the vessel. Observations and history call into question the fitness of the hull structure for the intended route and service. Produce a report from naval architect as to the adequacy of hull design for intended route and service.
46CFR177.300
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2019
Resolved 17 December 2019
Resolution: Repair proposal received.
Lifesaving › Lifefloat › Float-free Link
Issued 13 December 2017
Resolved
Identification tag for weak link on life float missing. Install new link with tag attached.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 8 January 2018
Resolution: New tag installed.
Engineering › Fuel Oil Service System › Piping
Issued 13 December 2017
Resolved
Bonding wires on fuel tank fill pipes not adequately attached to fill pipe and tank. Satisfactorily secure bonding wires on fuel tanks.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2018
Resolved 8 January 2018
Resolution: Bonding wires secured.
Engineering › Bilge Water Management System › Interface Detector
Issued 13 December 2017
Resolved
Bilge high level alarm must have visual and audible alarm.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 12 October 2018
Resolved 8 January 2018
Resolution: Installed visual and audible alarm.
Communications › Radio Communications › VHF Radiotelephone
Issued 13 December 2017
Resolved
Durable emergency broadcast placard must be posted next to all radio telephone installations
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2018
Resolved 8 January 2018
Resolution: Durable emergency broadcast placard
Engineering › Bilge Water Management System › Pump
Issued 7 January 2016
Resolved
Provide operational bilge pump in tank space (beneath passenger accommodations). 182.520(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 January 2016
Resolution: Operator retrieved equipment and made repairs hour after inspection.
Construction/Loadline › Hull › Transverse Frame
Issued 16 December 2015
Resolved
Crack discovered between starboard side CVK and 3rd transverse frame forward of aft bulkhead, below passenger accommodations. Grind out crack, weld and renew. 46 CFR 177.100
Action required: 705 - Other - as specified
Due 30 December 2015
Resolved 27 January 2016
Resolution: Received email correspondence with picture confirming completed weld.
Construction/Loadline › Hull › Transverse Frame
Issued 16 December 2015
Resolved
Crack discovered between port side CVK and 3rd transverse frame forward of aft bulkhead,below passenger accommodations. Grind out crack, weld and renew. 46 CFR 177.100
Action required: 705 - Other - as specified
Due 30 December 2015
Resolved 27 January 2016
Resolution: Received email correspondence with picture confirming completed weld.
Construction/Loadline › Hull › Transverse Frame
Issued 16 December 2015
Resolved
Crack discovered 3 inches to the port of CVK on the 3rd transverse frame forward of the aft bulkhead, below passenger accommodations. Grind out crack, weld and renew. 46 CFR 177.100
Action required: 705 - Other - as specified
Due 30 December 2015
Resolved 27 January 2016
Resolution: Received email correspondence with picture confirming completed weld.
Construction/Loadline › Hull › Transverse Frame
Issued 16 December 2015
Resolved
Crack discovered on the starboard side in between gusset plate and 5th transverse frame forward of aft bulkhead, below passenger accommodations. Grind out crack, weld and renew. 46 CFR 177.100
Action required: 705 - Other - as specified
Due 30 December 2015
Resolved 27 January 2016
Resolution: Received email correspondence with picture confirming completed weld.
Construction/Loadline › Hull › Longitudinal Frame
Issued 16 December 2015
Resolved
Crack discovered on 1st longitudinal port of CVK just forward of 6th transverse frame forward of aft bulkhead, below passenger accomodations. Grind out crack, weld and renew. 46 CFR 177.100
Action required: 705 - Other - as specified
Due 30 December 2015
Resolved 27 January 2016
Resolution: Received email correspondence with picture confirming completed weld.
Documentation › Logs/Records › Drug Test Records
Issued 10 December 2009
Resolved
Vessel's letter of enrollment in Drug/Alcohol Testing Program was dated 2003 with no newer letter present. Required operator to obtain updated letter IAW 46 CFR 16.230.
Due 30 December 2009
Resolved 11 December 2009
Resolution: Operator emailed updated letter to inspectors.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 10 December 2009
Resolved
First aid kit had several expired items. Required vessel to correct IAW 46 CFR 184.710.
Due 15 December 2009
Resolved 11 December 2009
Resolution: Operator emailed receipts for new first aid items.
Construction/Loadline › Hull › Transverse Frame
Issued 29 April 2009
Resolved
Port and starboard frames 4-6 cracked at gusset plate. Vessel to crop and renew starboard shell frame #6 from chine inboard approximately 32"
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 31 August 2009
Resolution: Cropped and renew''d stbd shell frame IAW NVIC 7-68. Replaced all damaged plate to original.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 29 December 2008
Resolved
Remove plastic cable supports and replace with metal supports in accordance with 46 CFR 183.340 b (4). Complete repairs with in two weeks to the satisfaction of on scene marine inspector.
Action required: 705 - Other - as specified
Due 12 January 2009
Resolved 5 January 2009
Resolution: Vessel Rep sent pictures of repairs. Metal supports were added in accordance with 46 CFR 183.340 (b) 4.
Engineering › Sea-water System (primary cooling) › Piping
Issued 14 December 2007
Resolved
Provide double clamping on sea water intake piping in engine room, per 46 CFR 182.410 (a) (1).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 11 January 2008
Resolved 26 December 2007
Resolution: Pictures were provided to prove double clamping on each sea water suction piping for both engines.