Professional
The full record for this vessel
Behind this panel: 13 inspections, each with its date, unit and type; 8 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 13
3 July 2026
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8385754
5 May 2026
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8367263
21 April 2023
PSC B
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7670021
27 April 2022
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7439338
15 October 2021
PSC A
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7333312
13 May 2020
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7002091
26 August 2019
Annual Inspection · ACP Annual Oversight · Administrative Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6794761
19 March 2019
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6645521
14 November 2018
ACP Annual Oversight · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6580285
1 November 2017
MTSA/ISPS Verification · Deficiency Check · ACP Annual Oversight · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6299167
27 March 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6112594
20 October 2016
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6026673
1 September 2016
Periodic Inspection · MTSA/ISPS Verification · ACP Periodic Oversight · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5989937
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 26 August 2019
Resolved
Provide proper operation of stbd aft watertight hatch.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 August 2019
Resolution: Corrected to the satisfaction of ABS.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 26 August 2019
Resolved
Provide proper operation of port aft watertight hatch gasket.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 August 2019
Resolution: Corrected to the satisfaction of ABS.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 August 2019
Resolved
Provide proof of valid batteries for life ring lights.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2019
Resolved 30 August 2019
Resolution: Corrected to the satisfaction of ABS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 August 2019
Resolved
Provide proper working condition of emergency generator fuel lines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2019
Resolved 30 August 2019
Resolution: Corrected to the satisfaction of ABS.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 August 2019
Resolved
Provide proper installation of CO2 hose on paint locker.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 August 2019
Resolution: Corrected to the satisfaction of ABS.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 August 2019
Resolved
Provide proper installation of fixed CO2 hose in CO2 room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 August 2019
Resolution: Corrected to the satisfaction of ABS.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 August 2019
Resolved
Properly secured fuel sample storage bin.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2019
Resolved 30 August 2019
Resolution: Corrected to the satisfaction of ABS.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 1 November 2017
Resolved
perform fire and man overboard drills (utilizing the rescue boat) to the satisfaction of the attending CG Marine Inspector and prior to sailing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 November 2017