Inspection history · 41
22 April 2026
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8354308
15 October 2025
Vessel Attendance · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8254233
9 October 2025
Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8250078
30 May 2025
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8148472
27 May 2025
Internal Structural Exam · Annual Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8145046
16 August 2024
Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7982697
24 July 2024
Damage Survey · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7967214
8 June 2024
Damage Survey · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7930438
15 March 2024
Administrative Inspection · Plan Review "T" Boat · Deadweight Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7888259
21 November 2023
Internal Structural Exam · Plan Review "T" Boat · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7827894
19 July 2023
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7774678
29 March 2023
Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7663521
17 November 2022
Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7645085
15 November 2022
Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7596913
30 August 2022
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7548389
27 June 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7489253
1 June 2022
Deficiency Check · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7465907
27 May 2022
COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7453696
22 March 2022
Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7427438
15 February 2022
Hull Examination · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7396632
16 September 2021
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7313715
24 April 2020
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6943587
18 February 2020
Drydock Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6911049
7 February 2020
Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6891197
24 September 2019
Examination of Repairs
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6820572
18 June 2019
Examination of Repairs · Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6720402
30 April 2019
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6684183
10 April 2019
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6660171
19 March 2019
COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6645616
24 May 2018
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6422944
14 May 2018
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6414500
8 May 2018
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6409627
5 April 2018
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6386198
16 March 2018
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6372447
9 March 2018
Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6369333
27 January 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6078115
10 January 2017
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6068443
3 October 2016
Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6014809
25 April 2016
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5863067
22 April 2016
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5860367
12 January 2016
Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5795551
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 22 April 2026
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Breaker panel in aft electrical closet was missing a blank.
46 CFR 183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2026
Resolved 23 April 2026
Resolution: Blank was installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 22 April 2026
No resolution recorded
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. Two dead end wires were found in the STBD aft engine room.
46 CFR 183.340
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2026 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 22 April 2026
No resolution recorded
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”. Both Forward engine room emergency escape hatches were not properly marked.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2026 — due date passed with no resolution recorded
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 27 May 2025
Resolved
Inflatable liferafts must be serviced every 12 months at a facility specifically approved by the Commandant for the particular brand.. Provide servicing or new install documentation for liferaft ser.# 5241310101910
46 CFR 185.730
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 9 October 2025
Resolution: Verified liferaft servicing certificate.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 27 May 2025
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up to date charts of large enough scale to make safe navigation possible.
46 CFR 184.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 9 October 2025
Resolution: Verified electronic charts had been updated.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 27 May 2025
Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel. Secure painter to float free link.
46 CFR 180.130
Action required: 10 - Deficiency Rectified
Resolved 27 May 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 May 2025
Resolved
Each floating waterlight attached to the ring bouy must be attached by a lanyard with a corrosion-resistant clip around the body of the lifering. Install required corrosion-resistant clip as required.
46 CFR 180.70 (d)(3)
Action required: 10 - Deficiency Rectified
Due 11 June 2025
Resolved 27 May 2025
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 August 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Aft port main has an exhaust leak and exhaust cooling pipe has an epoxy applied, potentially covering a leak. Provide
repair proposal, prior to commencing work.
46 cfr 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2024
Resolution: Deficiency rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 August 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. MI discovered a oil leak located in the forward lower area (sump) of the port fwd main.
46 cfr 182.100
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 August 2024
Resolution: Deficiency rectified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 August 2024
Resolved
A bilge pipe in a vessel of more than 19.8 meters (65 feet) in length must be not less than 40 millimeters (1.5 inches) nominal pipe size. A bilge suction must be fitted with a suitable strainer having an open area not less than three times the area of the bilge pipe. Stbd jet space bilge pump did not have a strainer installed at suction.
46 cfr 182.510b
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 August 2024
Resolution: Strainer installed
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 August 2024
Resolved
Spaces required to have fire detection systems. (a) The following spaces must be equipped with a fire detection and alarm system of an approved type installed in accordance with 46 CFR Part 76. Smoke detector in the stbd jet room was covered.
46 cfr 181.405a1
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 August 2024
Resolution: Cover removed
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 August 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Port and stbd main aft engines have raw water leak, creating a constant drip of water ivo the metal straps on muffler.
46 cfr 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2024
Resolution: Deficiency rectified
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 16 August 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: (a) Provide services necessary for safety under normal and emergency conditions. Overhead light in stbd engine room is flickering.
46 cfr 183.200a
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 August 2024
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 24 July 2024
Resolved
Fire extinguishing equipment installed on a vessel in excess of the requirements of §§ 181.400 and 181.500 must be designed, constructed, installed, and maintained in accordance with a recognized industry standard acceptable to the Commandant (CG-ENG-4). Starboard side aft fire pull station was missing the breakaway cover that initiates the alram and the button was found zip tied in the closed position preventing the alarm from activating as designed.
46 CFR 181.120
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2024
Resolved 2 August 2024
Resolution: Pull station break away glass was installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 June 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions. [name withheld] reported inoperable starboard generator. Determine root cause, complete repairs and restore functionality within 1 week. Due to time zone, MISLE issue date defaults to 08JUN2024. Actual issue date 07JUN2024.
Action required: 705 - Other - as specified
Due 14 June 2024
Resolved 13 June 2024
Resolution: Root cause determined, STBD generator tested and functioning properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 August 2023
Resolved
Flexible hose may only be used at a pressure not to exceed the manufacturer's rating and must have a high resistance to saltwater, oil, and vibration. A section of flexible hose on the main engine showed significant signs of deterioration.
46 CFR 182.720
Action required: 10 - Deficiency Rectified
Resolved 23 August 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 August 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. The electrical enclosures for the engine control modules were secured to the wall and closed with zip ties.
46 CFR 183.200
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 23 August 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 August 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. The vessel had dead end wires from old engine exhaust temp sensors that have since been removed. Remove dead end wires or terminate within an enclosure at next scheduled drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 1 April 2024
Resolution: Wires have been removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 June 2022
Resolved
A space containing diesel machinery must be fitted with adequate means to provide sufficient air for proper operation of the main engines and auxiliary engines. Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. The port engine room fan and vent closure controller failed making the the supply fan and closure inoperable. 46 CFR 182.465
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 June 2022
Resolved 1 June 2022
Resolution: Owner replaced the fan controller, fan and remote vent closure tested - all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 27 May 2022
Resolved
A space containing diesel machinery must be fitted with adequate means such as dripproof ventilators, ducts, or louvers, to provide sufficient air for proper operation of main engines and auxiliary engines. Port engine room ventilation fan was inoperable.
46 CFR 182.465
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 May 2022
Resolved 28 May 2022
Resolution: Fan operational. Optest SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 27 May 2022
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Port E/R Room door wont latch closed and was bungee corded shut.
46 CFR 176.830(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2022
Resolved 27 June 2022
Resolution: Onwer replaced the door latch with a brand new one tested - all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 27 May 2022
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. Bilge high water alarm and electric submersible pump terminal ends are not made within an enclosure.
46 CFR 182.240(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2022
Resolved 28 May 2022
Resolution: All wire terminal ends placed into enclosure.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 May 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Electrical switch in port main deck utility closet has a broken cover plate.
46 CFR 182.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2022
Resolved 28 May 2022
Resolution: Electrical switch plate replaced.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 May 2022
Resolved
On a vessel of not more than 19.8 meters (65 feet) in length carrying more than 49 passengers, and on a vessel of more than 19.8 meters (65 feet) in length, each hose must:(1) Be lined commercial fire hose that conforms to UL 19 (incorporated by reference, see 46 CFR 175.600) or hose that is listed and labeled by an independent laboratory recognized by the Commandant as being equivalent in performance. 2nd deck fire hose had multiple holes that were identified when the hose was charged.
46 CFR 181.320(b)(1)
Action required: 10 - Deficiency Rectified
Resolved 27 May 2022
Resolution: Fire hose was replaced with new one prior to completion of inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 September 2019
Resolved
Exhaust gas must not leak from the piping or any connections. The exhaust piping on all four propulsion engines is wasted allowing exhaust gas to leak extensively from the piping. At next dry-dock, completely replace all exhaust piping on all four propulsion engines.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2020
Resolved 27 May 2022
Resolution: Exhaust leaks have been repairs SAT.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 March 2019
Resolved
Batteries must be mounted in electrolyte resistant trays; provided battery trays were modified preventing the containment of electrolyte.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 10 April 2019
Resolution: Verified appropriate battery trays were provided.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 March 2019
Resolved
Battery installations must be such that battery terminals are protected from falling object; battery terminals were unprotected.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 10 April 2019
Resolution: Verfied all positive terminals were provided with a cover.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 March 2019
Resolved
All electrical equipment and circuits must be clearly marked and identified; provide label for the main circuit breaker for the generator.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 10 April 2019
Resolution: Verified the generator breaker was marked.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 19 March 2019
Resolved
Emergency instructions for fire, heavy weather, and man overboard shall be mounted at the operating station; no emergency instructions were provided.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 10 April 2019
Resolution: Verified emergency instructions were provided at the operating station.
Electrical › Electrical Distribution System (service) › Cable
Issued 16 March 2018
Resolved
Provide metal electrical cable supports spaced not more than 24" apart in the #3 void aft transverse cable run.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 8 May 2018
Resolution: Verified cables were properly supported.
Electrical › Electric Generation Source (service) › Generator
Issued 9 March 2018
Resolved
Identified that the vessel had insufficient power sources for electrically powered vital systems listed in 182.710(a). Provide proposal/plans to address redundancy requirements.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 8 May 2018
Resolution: A portable gas operated pump that is capable of dewatering and firefighting was provided.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 9 March 2018
Resolved
Conduct the annual servicing of the vessel's fixed fire suppression system.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 5 April 2018
Resolution: System is an FM-200 halogenated clean agent. Both bottles have a 2004 hydro. Bottles received a 5 year exam by a DOT certified examiner in lieu of hydro.
Lifesaving › Inflatable Liferafts › Not on Board
Issued 9 March 2018
Resolved
No liferafts were provided. Provide serviced liferafts of adequate capacity for vessel manning.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2018
Resolved 5 April 2018
Resolution: Verified vessel was outfitted with properly installed and currently inspected life rafts.
Engineering › Diesel Engine (propulsion-direct drive) › Blower, Centrifugal
Issued 9 March 2018
Resolved
The #1 main engine was inoperable. Conduct an operational test of the main, associated steering, and fixed fire system shutdowns.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2018
Resolved 5 April 2018
Resolution: Identified source of failure as an inoperable fuel pump. Renewed pump, engine test sat to include start up, bridge shut down, steering, and proper operation of pre-engineered fixed system shutdowns and interlocks.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 9 March 2018
Resolved
Provide up-to-date charts for areas of operation.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 5 April 2018
Resolution: Verfied charts were corrected up to the latest LNM.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 9 March 2018
Resolved
Renew expired medical supplies located in vessel's required first aid kit.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 5 April 2018
Resolution: Verified vessel's first aid kit was properly outfitted and perishable items were current.
Operations/Management › Pollution › Control of Garbage
Issued 9 March 2018
Resolved
Provide a MARPOL placard.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 5 April 2018
Resolution: Provided vessel with a MARPOL placard.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 9 March 2018
Resolved
Excessive corrosion of vessels black water pump motor casing is cause for an electrical hazard. provide proposal to repair or renew motor.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2018
Resolved 24 May 2018
Resolution: Verified the pump motor was renewed.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 9 March 2018
Resolved
Vessel permanent loading marks were not readily apparent. Verify loading marks are provided as required.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 8 May 2018
Resolution: Verified permanent loading marks were welded to the hull IAW architectural drawings.
Operations/Management › Drills/Instruction › Not Conducted
Issued 9 March 2018
Resolved
Conduct required crew drills.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 14 May 2018
Resolution: Witnessed satisfactory drills.
Lifesaving › Lifebuoys › Serviceable
Issued 10 January 2017
Resolved
Renew or replace life ring buoy on the 2nd deck, aft, ring buoy is weather damaged and deteriorated. Renew the retroflective tape on the life ring buoy on the port side bridge wing. 46 CFR 180.70
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 27 January 2017
Resolution: Owners rep replaced the ring buoy on the 2nd deck aft with the required type and repaired the one on the port bridge wing.
Personnel › Certificates/Documents/Licenses › License, Radio Officer
Issued 10 January 2017
Resolved
Master did not have his FCC Marine Radio Operator permit onboard at time of inspection. 46 CFR 176.402(c)(3).
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 11 January 2017
Resolution: Capt emailed me a copy of his FCC Marine Radio Operator permit.
Operations/Management › Pollution › Control of Garbage
Issued 10 January 2017
Resolved
Properly post garbage placard visible to passengers and crew. 33 CFR 151.59
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 27 January 2017
Resolution: Owners rep installed a garbage placard.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 10 January 2017
Resolved
Provide proof of employee coverage for 2017. 49 CFR 40
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 19 January 2017
Resolution: Owners rep emailed me a copy of their 2017 proof of enrollment from Drug Testing Network (DTN).
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 10 January 2017
Resolved
Demonstrate new exhaust pipe gasket on inboard stbd side engine is leak free and remove water collection bucket from beneath it. 46 CFR 182.425(b)(2)
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 27 January 2017
Resolution: Owners mechanics replaced a cracked section of marine exhaust pipe. Test ran - sat.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 10 January 2017
Resolved
Replace missing exhaust lagging on stbd side outboard engine. 46 CFR 177.970
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 27 January 2017
Resolution: Owners mechanics replaced the missing exhaust lagging on the stbd side outboard engine.
Electrical › Electrical Distribution System (service) › Cable
Issued 10 January 2017
Resolved
Properly repair chafed wire on inboard stbd side engine and provide chaffing protection for the same. 46 CFR 183.340(b)(6)
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 27 January 2017
Resolution: Owners electrician repaired the chaffed wiring and provided chaffing gear to the same.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 3 October 2016
Resolved
The No. 3 MDE lost the Engine Control Module display/alarms. Repair or replace the ECM. 46 CFR 182.410(b)
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 7 October 2016
Resolution: [name withheld] attended vessel and witnessed proper operation of the #3 ECM.
Construction/Loadline › Hull › Hull Plating
Issued 22 April 2016
Resolved
Conduct NDT of hull pitting in #3 port void from bow. Pitting centralized under sewage holding and fuel tanks. Crop & renew as necessary. 46CFR177.300
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2016
Resolved 25 April 2016
Construction/Loadline › Hull › Hull Plating
Issued 22 April 2016
Resolved
Clean and repair damaged sea chest gratings on bottom of the hull. 46CFR177.300
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 May 2016
Resolved 25 April 2016
Construction/Loadline › Hull › Hull Plating
Issued 22 April 2016
Resolved
Replace wasted sewage tank in #3 port void and repair hull cutout created to replace tank. 46CFR177.300
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2016
Resolved 25 April 2016
Construction/Loadline › Hull › Hull Plating
Issued 22 April 2016
Resolved
Remove splash zone on potable water tank and repair weld.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 May 2016
Resolved 25 April 2016