Inspection history · 18
12 May 2026
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8371067
5 August 2025
Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8147159
1 May 2025
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8127229
14 May 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7912329
23 August 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7787566
9 May 2023
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7683462
17 February 2022
Administrative Inspection · COI Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7391669
28 July 2021
Drydock Exam · Examination of Repairs · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7269318
26 April 2021
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7183426
25 June 2020
Administrative Inspection · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6986418
14 April 2020
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6939027
7 August 2019
Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6775420
28 May 2019
DAPI Audit · MTSA Verification · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6696257
3 May 2018
DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6403734
22 September 2017
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6345194
2 August 2017
Drydock Exam · Administrative Inspection · Internal Structural Exam · In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6228003
23 February 2017
COI Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6089370
6 May 2016
In-Service Inspection · Annual Inspection · DAPI Audit · MTSA/ISPS Verification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5870793
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 12 May 2026
Resolved
Each vessel certificated to operate on a limited coastwise route within three miles of land in warm water and is equipped an EPIRB is not required to carry survival craft. Vessel did not have an EPIRB on board. Vessel restricted to rivers route only. 46CFR117.204
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 26 May 2026
Resolved 28 May 2026
Resolution: Installed EPIRB
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 12 May 2026
Resolved
When using DSC techniques, coast stations and ship stations must use maritime mobile service identities (MMSI) assigned by the Commission or its designees.
The MMSI number displaying on the VHF radio did not match the station license. 47 CFR 80.103(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2026
Resolved 28 May 2026
Resolution: VHF matches MMSI listed on Station License
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 12 May 2026
Resolved
Commmunications Act must have a detailed inspection of the radio installation. Calls signs on bridge-to-bridge and radio telephony certificate do not match statin license.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2026
Resolved 28 May 2026
Resolution: Updated bridge-to-bridge and radio telephony.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 12 May 2026
Resolved
The owner, managing operator, or a qualified servicing facility as applicable shall, for portable fire extinguishers, conduct the inspections, maintenance procedures and hydrostatic pressure tests required by NFPA 10. No logs or evidence of monthly maintenance on portable fire extinguishers. 46CFR115.810(b)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2026
Resolved 28 May 2026
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 12 May 2026
Resolved
An exposed hazard, such as gears or rotating machinery, must be protected by a cover, guard, or rail. Guard on fire pump was broken causing contact with the shaft resulting in sparks. 46CFR116.960
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2026
Resolved 28 May 2026
Resolution: Guard was repaired.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 May 2026
Resolved
A door in a stair tower must be of the self-closing type capable of closing against a 3.5 list of the vessel. Doors in stair tower did not close. 46CFR116.435(c)(6)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2026
Resolved 28 May 2026
Resolution: Doors repaired and close properly.
02 - Structural Conditions › N/A - No Subsystem › Wheelhouse -door -window
Issued 12 May 2026
Resolved
Each window, port hole, and its means of attachment to the hull or deck house, must be capable of withstanding the maximum load from wave and wind conditions. Starboard aft window was shattered 46CFR116.1020
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2026
Resolved 28 May 2026
Resolution: Window was repaired.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 1 May 2025
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck.
Starboard Main Engine fuel shutoff valve inoperable. Demonstrate proper operation.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 15 May 2025
Resolved 1 May 2025
Resolution: Cable replaced. Test Sat.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 1 May 2025
Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment, other than small buoyancy compartments, under all practicable conditions. Sluice valves are not permitted in watertight bulkheads.
Machine shop bilge suction inoperable. Demonstrate proper operation.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 15 May 2025
Resolved 1 May 2025
Resolution: Bilge pick up cleaned out. Strainer replaced. Test Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 1 May 2025
Resolved
Gauges to indicate engine revolutions per minute (RPM), jacket water discharge temperature, and lubricating oil pressure must be provided for all propulsion engines installed in the vessel. The gauges must be readily visible at the operating station.
Demonstrate proper operation of starboard lube oil pressure gauge from operating station.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2025
Resolved 9 May 2025
Resolution: Vessel installed starboard engine lube oil pressure gauge from operating station. Test Sat.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 14 May 2024
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty.
Found stowage at stairway used for emergency escape on deck two aft and a table with seating placed directly in front of the emergency exit door on deck two leading to that same stairway. Emergency escape routes shall be clear of any obstacles impeding the safe evacuation of that space.
46 CFR 116.100
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 20 May 2024
Resolution: Vessel moved stowage
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 14 May 2024
Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”.
Found that emergency escape routes and doors were missing signage. Install signage to properly mark emergency exits and escape routes.
46 CFR 122.606
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2024
Resolved 20 May 2024
Resolution: signage installed
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 May 2024
Resolved
Ring life buoys shall be of first class workmanship and free from any defects materially affecting their appearance or serviceability. Found two ring life buoys with deteriorated grab lines. Grab lines shall be replaced.
46 CFR 160.050-4(f)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 20 May 2024
Resolution: Grab lines replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 June 2020
Resolved
The exhaust from the port generator has not been properly installed and needs all mounting hardware installed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2020
Resolved 7 July 2020
Resolution: operator emailed in photo of properly installed exhaust
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 June 2020
Resolved
Vessel has not conducted EAP training. Vessel to complete annual training for crew and personnel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2020
Resolved 7 July 2020
Resolution: operator sent in photo of EAP training.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 June 2020
Resolved
Vessel response plan is expired. Vessel to attaing a valid VRP. Previous plan expired in November 2019. 33 CFR 155.5015(a)
Action required: 60 - Rectify deficiencies prior to movement
Due 30 June 2020
Resolved 6 July 2020
Resolution: VRP Plan approved on 06JUL2020 under plan #50241
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 7 August 2019
Resolved
re-attach sections of the insulation in the overhang of the bow thruster room located over the machinery.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 August 2019
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 7 August 2019
Resolved
Provide repair proposal for stress crack forward of the port side rudder post.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 August 2019
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 7 August 2019
Resolved
Have UT shots done of all areas identified with chalk on both port and starboard sides. Provide Coast Guard with the report.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 August 2019
Electrical › Electrical Distribution System (emergency) › Neutral Ground
Issued 3 May 2018
Resolved
Vessel fire service technician stated that there has been an ongoing issue with grounding onboard causing multiple faults on fire alarm panal located on bridge. Technician visit 3 and 4 May to address.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2018
Resolved 4 May 2018
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 3 May 2018
Resolved
Wait staff and all members involved in safety sensitive roles must be enrolled.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 May 2018
Resolved 17 May 2018
Lifesaving › Rescue Boat › Construction
Issued 3 May 2018
Resolved
Vessel has unapproved rescue boat. Rescue boat listed on COI.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 May 2018
Resolved 17 May 2018
Resolution: Ammended COI to remove rescue boat.
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 7 August 2017
Resolved
Renew port and starboard cutlass bearings prior to credit DD.
Action required: 705 - Other - as specified
Resolved 24 August 2017
Resolution: Replace port/stbd cutlass bearings, worklist item cleared.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 7 August 2017
Resolved
Significant pitting by keyway on both port and starboard shafts. Renew shafts or provide repair proposal prior to credit DD.
Action required: 705 - Other - as specified
Resolved 24 August 2017
Resolution: Port/stbd shafts replaced, worklist item cleared.
Engineering › Thrusters › Piping
Issued 7 August 2017
Resolved
Renew cooling water piping between thru-hull valve and bow thruster prior to credit DD.
Action required: 705 - Other - as specified
Resolved 22 September 2017
Resolution: Worklist item cleared.
Engineering › Thrusters › Tunnel
Issued 2 August 2017
Resolved
Submit repair proposal for repairs to bow thruster tube.
Action required: 705 - Other - as specified
Resolved 21 September 2017
Resolution: Received report. Cleared worklist item.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 23 February 2017
Resolved
remove all power strips throughout the vessel. 46CFR120.200(b)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 31 March 2017
Resolution: All power strips have been removed. Equipment has been installed to bulkhead installations adequately. 01 power strips remain installed as it is a component of the security system required to be onboard.
Personnel › Certificates/Documents/Licenses › TWIC
Issued 9 May 2016
Resolved
Renew 02 expired TWICs
Action required: 705 - Other - as specified
Due 23 May 2016
Resolved 27 May 2016
Resolution: Verified captain and crew with access to restricted areas on the vessel had valid TWICs.
Documentation › Logs/Records › MIS Form
Issued 9 May 2016
Resolved
Provide MIS Report
Action required: 705 - Other - as specified
Due 23 May 2016
Resolved 27 May 2016
Resolution: Verified presence of annual MIS report on board.
Personnel › Certificates/Documents/Licenses › License, Radio Officer
Issued 9 May 2016
Resolved
Provide Radio Operator Permits on board.
Action required: 705 - Other - as specified
Due 23 May 2016
Resolved 27 May 2016
Resolution: Verified presence of Radiotelephone Operator Permit on board.