Records from 1999 to 2003. Most recent: inspection, 1 August 2003.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 7
1 August 2003
Administrative Inspection
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1941403
27 June 2002
Annual Inspection · Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1639485
22 June 2001
COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1067786
11 January 2001
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1056741
8 August 2000
Re-Inspection · Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1389198
14 June 2000
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 819250
16 July 1999
Hull Examination · Initial Certification
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1404965
Navigation › Collision/Grounding Avoidance
Issued 27 June 2002
Resolved
PROVE PROPER OPERATION OF FORWARD NAVIGATION LIGHT TO THE SATISFACTION OF THE ATTENDING
COAST GUARD MARINE INSPECTOR.. LEGACY COMPONENT DESC: Navigation Lights
Condition: Unknown
Due 28 July 2002
Resolved 31 July 2002
Resolution: Corrected
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 27 June 2002
Resolved
DOUBLE HOSE CLAMP RUBBER HOSE SECTIONS OF EXHAUST LINES TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR. LEGACY COMPONENT DESC: Piping (exhaust)
Condition: Improper Installation
Due 28 July 2002
Resolved 31 July 2002
Resolution: Corrected
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 27 June 2002
Resolved
RELOCATE STARBOARD ENGINE EXHAUST RISER TO ELIMINATE CHAFFING ON MAIN ENGINE MOUNT AND REPAIR CHAFFED SECTION OF RISER TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR.. LEGACY COMPONENT DESC: Piping (exhaust)
Condition: Improper Installation
Due 28 July 2002
Resolved 31 July 2002
Resolution: corrected
Engineering
Issued 22 June 2001
Resolved
Repair or replace engine oil pressure gauge. Requirement to be completed prior to the carriage of passengers.
Condition: Unknown
Due 29 June 2001
Resolved 29 June 2001
Lifesaving
Issued 22 June 2001
Resolved
Properly install inflatable buoyant apparatus in accordance with 46 CFR 180.130 prior to the carriage of passengers.
Condition: Unknown
Due 3 July 2001
Resolved 3 July 2001
Lifesaving
Issued 22 June 2001
Resolved
Provide orange smoke signals in accordance with 46 CFR 180.68. Requirement to be completed prior to the carriage of passengers.
Condition: Unknown
Due 29 June 2001
Resolved 29 June 2001
Construction/Loadline
Issued 22 June 2001
Resolved
Lower center high bilge alarm prior to the carriage of passengers.
Condition: Unknown
Due 29 June 2001
Resolved 29 June 2001
Electrical
Issued 22 June 2001
Resolved
Install fuse for VHF radio in accordance with 46 CFR 183.392. Requirement to be completed prior to the carriage of passengers.
Condition: Unknown
Due 29 June 2001
Resolved 29 June 2001
Engineering
Issued 8 August 2000
Resolved
Label F.O. shut off valve on/off positions.
Condition: Unknown
Due 18 October 2000
Resolved 18 October 2000
Lifesaving
Issued 8 August 2000
Resolved
Attach IBA painter to hydrostatic release weak link.
Condition: Unknown
Due 18 October 2000
Resolved 18 October 2000
Engineering
Issued 8 August 2000
Resolved
Replace all vital system flexible hose with SAE/F1942 or USCG approved A1,_x001C_A2, B1, B2 hose.
Condition: Unknown
Due 18 October 2000
Resolved 18 October 2000
Construction/Loadline
Issued 8 August 2000
Resolved
Provide auto bilge visual indication at the operating station.
Condition: Unknown
Due 18 October 2000
Resolved 18 October 2000
Construction/Loadline
Issued 8 August 2000
Resolved
Provide check valve for all bilge overboards.
Condition: Unknown
Due 18 October 2000
Resolved 18 October 2000
Construction/Loadline
Issued 16 July 1999
Resolved
REPAIR ROT AT THE INTERSECTION OF THE #3 FLOOR TIMBER AND #3 RIB; ROT AT BILGE AREA.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Construction/Loadline
Issued 16 July 1999
Resolved
REPAIR CHECKED 5TH FRAME DOWN FROM CHINE BETWEEN RIB 7 & 8.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Unknown
Issued 16 July 1999
Resolved
PROVIDE SUPPORTING DATA TO MSC FOR REVIEW PERTAINING TO VESSEL SISTER VESSEL STATUS TO PAUL HERRON OR343FC. IF DETERMINED BY MSC THAT VESSEL DOES NOT WARRANT SISTER STATUS FOR ISSUANCE OF STABILITY LTR THEN NEW STABILITY TEST MUST BE CONDUCTED.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Engineering
Issued 16 July 1999
Resolved
PROVIDE BLOWER INTERLOCK FOR ENGINES.
Condition: Unknown
Due 20 August 1999
Resolved 8 May 2000
Construction/Loadline
Issued 16 July 1999
Resolved
REFASTEN STARBOARD SHEAR RAIL 10 FEET AFT OF STEM.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Construction/Loadline
Issued 16 July 1999
Resolved
REFASTEN BOTTOM STARBOARD LOWER CHINE PLANK AFT.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Construction/Loadline
Issued 16 July 1999
Resolved
REPAIR AFT END OF THIRD FRAME (EXTERIOR LAZARETTE CORNERS).
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999