Inspection history · 12
20 October 2025
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8251868
24 September 2025
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8204038
13 September 2024
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8000715
16 May 2024
Examination of Repairs · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7913273
14 September 2023
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7778863
12 September 2022
Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7557510
27 May 2021
Initial Certification · Administrative Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7208720
27 January 2010
DAPI Audit · Deficiency Check · Industry Initiated Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3678125
15 November 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2821431
2 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1958097
12 November 1999
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 9624
9 June 1994
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 118062
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 September 2025
Resolved
Provide 1 life jacket and immersion at watch station on Bridge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2025
Resolved 8 June 2026
Resolution: Vsl sold and COI deactivated.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 14 September 2023
Resolved
The master must ensure that all hatches, doors, and other openings designed to be watertight or weather-tight function properly. The aft stern void hatch is inoperable and the forward hatch gasket material is dry-rotted. Make aft hatch operable and replace gasket on forward hatch.
46 CFR 140.610(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 October 2023
Resolved 24 October 2023
Resolution: The aft hatch was serviced and the forward hatch gasket replaced.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 14 September 2023
Resolved
Decks and bulkheads designed to be watertight must be maintained in that condition. Severe wastage at the base of the STBD stack, approx 2'x1', and at the base of the port WTD, approx 1' x 6", was discovered. Provide plan to crop and renew back to good metal for the aforementioned areas prior to next operating season.
46 CFR 140.610(f)
24OCT2023: The vessel has been hauled out of the water for the winter season. The vessel rep will be assessing scope of repair work during this haul out period and submitting repair proposal. Repair work will be conducted in spring 2024 after review and approval of the proposal. Vessel rep will request attendance for verification of repair work prior to placing the vessel back into the water around the beginning of June.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 October 2023
Resolved 18 May 2024
Resolution: Wasted areas were cut back to good metal and new inserts were placed on the starboard stack and WTD.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 September 2023
Resolved
High bilge level alarms must be visible and audible at each operating station. The bilge high level alarm did not provide adequate audible notification at the operating station. Install adequate audible alarm at operating station.
46 CFR 143.230(b)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 October 2023
Resolved 24 October 2023
Resolution: An additional audible alarm was installed to provide notification to the bridge.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 14 September 2023
Resolved
Each towing vessel must be equipped with navigation lights in accordance with the International Regulations for Prevention of Collisions at Sea (COLREGS) or 33 CFR part 84. The port side running LED light is partially obstructed and not providing the required horizontal arc of visibility, install proper navigational light.
46 CFR 140.720
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 October 2023
Resolved 24 October 2023
Resolution: A new port side navigation light was installed.
10 - Safety of Navigation › N/A - No Subsystem › Navigation records
Issued 14 September 2023
Resolved
The master or officer in charge of a navigational watch must determine whether the vessel complies with all stability requirements in the vessel's stability letter. Bilges were found with several inches of standing oily water, pump bilges and provide documentation of removal in TVR.
46 CFR 140.605(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 October 2023
Resolved 24 October 2023
Resolution: The oily water from machinery space was removed and the bilges were cleaned.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 September 2023
Resolved
Each entrance to a space storing carbon dioxide cylinders, a space protected by carbon dioxide systems, or any space into which carbon dioxide might migrate must be conspicuously marked: Spaces protected by carbon dioxide—“CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. WHEN ALARM OPERATES, DO NOT ENTER UNTIL VENTILATED. LOCK OUT SYSTEM WHEN SERVICING.” Spaces storing carbon dioxide—“CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. VENTILATE THE AREA BEFORE ENTERING. A HIGH CONCENTRATION CAN OCCUR IN THIS AREA AND CAN CAUSE SUFFOCATION.” The machinery space and forward storage space were Carbon Dioxide is stored were not marked, properly mark entrances to spaces.
46 CFR 136.110
46 CFR 78.47-11(b)-(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 October 2023
Resolved 24 October 2023
Resolution: The machinery space and forward storage space were properly marked.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 September 2023
Resolved
All piping, valves, and fittings shall be securely supported, and where necessary, protected against injury. The CO2 branch line in the centerline overhead of the engine room had a broken support bracket and not properly supported. Repair support bracket.
46 CFR 136.110
46 CFR 76.15-15(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 October 2023
Resolved 24 October 2023
Resolution: The support bracket was repaired.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 September 2023
Resolved
Each escape hatch and emergency exit used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”. The emergency exit from forward engine room was not marked, mark emergency exit.
46 CFR 144.160(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 October 2023
Resolved 24 October 2023
Resolution: The emergency exit was properly marked.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 September 2023
Resolved
Each watertight hatch must be marked on both sides in clearly legible letters at least 25 millimeters (1 inch) high: “WATERTIGHT DOOR—KEEP CLOSED” or “WATERTIGHT HATCH—KEEP CLOSED”. The watertight hatches and doors to the lazerette, machinery space, house, and forward storage space were not marked. Properly mark watertight hatches and doors.
46 CFR 140.160(e)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 October 2023
Resolved 24 October 2023
Resolution: The watertight hatches and doors to the lazerette, machinery space, house, and forward storage space were properly marked.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 14 September 2023
Resolved
The master of a towing vessel must ensure that each crewmember participates in fire-fighting drills and receives instruction at least once each month. Fire drills have not been conducted since and recorded since June 30, 2023.
46 CFR 142.245(a)
Action required: 10 - Deficiency Rectified
Resolved 14 September 2023
Resolution: Fire drill was conducted and recorded in TVR.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 May 2021
Resolved
Vessel must have a type I Lifejacket for every person onboard. Vessel currently only has 02 lifejackets.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2021
Resolved 2 August 2021
Resolution: 4 PFDs now onboard.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 27 May 2021
Resolved
Fire pump must deliver 50psi and be energized remotely from a safe place outside the engine room. Fire pump does not deliver 50 psi to hydrant and cannot be energized from outside the engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2021
Resolved 16 July 2021
Resolution: Vessel excepted from regulation as it only operates as a harbor assist tug in the vacinity of another inspected towing vessel.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 May 2021
Resolved
The design and installation of the fire detection system must be certified by a professional engineer or NICET Level 4 alarm engineering technician. Installation is not certified.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2021
Resolved 16 July 2021
Resolution: Vessel excepted from regulation as it only operates as a harbor assist tug in the vacinity of another inspected towing vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 May 2021
Resolved
All installed bilge piping must have check valves installed to prevent backflooding.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2021
Resolved 14 September 2023
Resolution: check valves installed on bilge piping.