Records from 2004 to 2021. Most recent: inspection, 8 November 2021.
Documentation record
Registered dimensions (L × B × D)74.0 ft × 21.0 ft × 4.0 ft
Registered tonnagegross 41 / net 33
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMARINETTE MARINE CORPORATION · MARINETTE, WI, UNITED STATES · built 1968
Hull materialAluminum
PropulsionNot recorded
Hull shapeShip
Hull configurationMonohull
Hailing portNOME, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationExpired · issued 30 June 2004
Service, as the file records itTowing Vessel
Hull formunknown (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it41 - Simplified, Gross Ton
33 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 10
8 November 2021
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7347726
30 June 2021
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7261529
20 October 2020
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7258313
14 August 2020
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7063312
18 October 2019
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6840001
19 September 2015
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5793931
29 August 2013
Industry Initiated Exam
Physical examination · USCG Arctic District (dp) · USCG Arctic District (CGD-A) · Activity 4710509
26 October 2011
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4176674
15 August 2011
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4176606
19 May 2004
Hull Examination
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 2163362
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 November 2021
Resolved
Propulsion machinery, including main engine, reduction gears, shafting, and bearing must be suitable for route and service. Due to the grounding on 11OCT21, propulsion system must be verified of proper working order by an attending Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 January 2022
Resolution: Vessel has been laid up, must obtain a COI prior to operation.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 20 October 2020
Resolved
No person may operate any vessel equipped with installed toilet facilities unless it is equipped with an operable type II or type III device or an operable type I device. Vessel has an operates a toliet facility that discharges sewage directly overboard. Vessel shall cease operation of installed toliet facility and prevent discharge of sewage immediately.
Action required: 60 - Rectify deficiencies prior to movement
Due 20 October 2020
Resolved 30 June 2021
Resolution: Received photo of overboard discharge valve handle removed to prevent sewage from going overboard within 3NM from shore.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 October 2020
Resolved
Fuel shutoff requirements, to stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine, generator, or prime mover. Vessel does nothave valves operable from outside the space where the valve in installed.
Action required: 60 - Rectify deficiencies prior to movement
Due 20 October 2020
Resolved 30 June 2021
Resolution: Received video demonstrating proper operation of fuel shut off valve.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 20 October 2020
Resolved
Each towing vessel must have a fire pump. Vessels fire pump is currently not working and being repaired.
Action required: 60 - Rectify deficiencies prior to movement
Due 20 October 2020
Resolved 30 June 2021
Resolution: Received video of fire pump properly operating.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 14 August 2020
Resolved
All owners and operators of an existing towing vessel must have a valid COI prior to the specified phase-in period. This vessel is one of the 50% of the vessels that has not obtained a valid COI. The vessel shall be made available for a Coast Guard COI inspection within 90 days. If an inspection is not completed prior to this date, the action for this deficiency shall be changed to a 60 (rectify deficiencies prior to movement) and the vessel may no longer be permitted to operate.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 14 November 2020
Resolved 30 June 2021
Resolution: Company will be providing another vessel to meet 50% for 2020.
Construction/Loadline › Hull › Longitudinal Frame
Issued 19 May 2004
Resolved
Crop and Renew broken frame port side forward.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 January 2022
Resolution: Vessel has been laid up, must obtain a COI prior to operation.
Construction/Loadline › Hull › Bottom Plating
Issued 19 May 2004
Resolved
Insert bottom at centerline under #4 and #5 voids where pitted.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 January 2022
Resolution: Vessel has been laid up, must obtain a COI prior to operation.
Construction/Loadline › Hull › Stiffener
Issued 19 May 2004
Resolved
Crop and renew damaged bottom gusset #6 port, aft.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 January 2022
Resolution: Vessel has been laid up, must obtain a COI prior to operation.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 19 May 2004
Resolved
Provide plans for fuel tank and fuel piping system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 January 2022
Resolution: Vessel has been laid up, must obtain a COI prior to operation.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 19 May 2004
Resolved
Cap welds on fuel tank centerline bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 January 2022
Resolution: Vessel has been laid up, must obtain a COI prior to operation.
Engineering › Sea-water System (primary cooling) › Valve
Issued 19 May 2004
Resolved
Remove both sea valves in engine room for examination.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 January 2022
Resolution: Vessel has been laid up, must obtain a COI prior to operation.
Deck/Cargo › Holds/Tanks › Ventilation Air Intake
Issued 19 May 2004
Resolved
Install proper vents for all voids.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 January 2022
Resolution: Vessel has been laid up, must obtain a COI prior to operation.