Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 27
4 May 2026
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8350828
3 March 2026
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8310083
26 January 2026
Administrative Inspection · Appeal
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8302930
13 November 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8267345
21 July 2025
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8188410
15 October 2024
COI Inspection · MARPOL Annex V Examination · MARPOL Annex I Examination · MARPOL Annex IV Survey · MTSA/ISPS Verification · MARPOL Annex VI Survey · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8016945
25 September 2024
Cargo Tank Internal · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8008725
23 January 2024
MARPOL Annex I Examination · MARPOL Annex VI Survey · Annual Inspection · MTSA/ISPS Verification · MARPOL Annex V Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7853610
14 November 2023
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7824337
6 June 2023
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7705008
6 June 2023
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7725820
17 January 2023
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7622178
9 June 2022
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7472812
21 December 2021
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7371044
4 November 2021
Drydock Exam · Internal Structural Exam · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7345597
12 March 2021
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7155263
24 November 2020
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7101201
9 July 2020
Examination of Repairs · Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7002991
31 October 2019
MTSA/ISPS Verification · MARPOL Annex VI Survey · MARPOL Annex IV Survey · Administrative Inspection · COI Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6846614
9 October 2019
Administrative Inspection · Cargo Tank Internal · Drydock Exam · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6831162
6 September 2018
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6533925
17 August 2018
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6515148
29 November 2017
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6314239
23 August 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6249911
25 October 2016
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6029658
21 October 2016
Cargo Tank Internal · Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6027353
26 August 2016
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5986678
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 26 January 2026
No resolution recorded
...The master or person in charge of an oceangoing ship that cannot discharge NLS residue into the sea in accordance with 46 CFR 153.1126 or 153.1128 shall ensure that the NLS residue is—(1) Retained on board; or(2) Discharged to a reception facility. The methanol containment around the loading and discharge manifolds allows spills on the deck to flow directly into the sea. Four sided containment must be properly installed around the manifolds prior to carriage of methanol (methyl alcohol). If the vessel is currently carrying methanol, a one-time discharge is authorized to clean and gas free tanks. After request for reconsideration was rescinded, MSU Houma agreed to extend the 835 until the vessel's next scheduled drydock in Nov 2026.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Documentation-ISM
Issued 13 November 2025
Resolved
In meeting these requirements the company should ensure that any non-conformity is reported with its possible cause. The vessel reported a failure of the emergencny generator to the company on 7/18/2025 which lasted until USCG attendance on 11/13/2025. A report was never made to the USCG. Conduct root cause analysis of non-conformity.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 December 2025
Resolved 3 December 2025
Resolution: Company conducted a root cause analysis regarding their failure to report the casualty.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 13 November 2025
Resolved
Machinery spaces of category A containing oil fuel units shall be provided with one of the systems in para 4.1. The CO2 flex hoses were loose and unsealed to the bottle on 5 of the bottles.
74 SOLAS (20) II-2/10.5.1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 November 2025
Resolution: Bayou Fire and Sprinkler attended vsl and fixed all CO2 hoses.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 November 2025
Resolved
Electrical installations shall be such as to minimize the risk of fire from flam. products. Install certified safe lights in cargo deck haz zone. Recitfy prior to methanol carriage.
74 SOLAS (20) VII/10.1, IBC 10.1.2.1
Action required: 705 - Other - as specified
Resolved 7 January 2026
Resolution: Proper lights install in haz zone around methanol tank vents.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 13 November 2025
Resolved
Oil piping drains, strainers, and other equip. subject to normal leakage must be fitted with drip pans. The E-gen prime mover is missing drip pans under the fuel filters and fuel sample port.
46 CFR 56.50-60(k)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 December 2025
Resolved 5 December 2025
Resolution: Drip pans installed under fuel filters.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 13 November 2025
Resolved
Each vessel must have a means of comms among the following: steering gear room. The light on the sound powered phone beacon was extinguished.
46 CFR 113.30-5(a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 December 2025
Resolved 11 December 2025
Resolution: Light fixed and is operational.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 October 2024
Resolved
Electrical installations on vessels must ensure: protection of passengers, crew, other persons, and the vessel from electrical hazards. 01 breaker panel in the machinery space had excessive oil within the panel, another breaker panel was missing a blank and was open to contact.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2024
Resolved 25 October 2024
Resolution: Vessel placed blanks in missing locations. Additionally, cleaned oil from the panel.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 15 October 2024
Resolved
Vent outlets from all tanks which may emit flammable or combustible vapors, must be fitted with a single screen of corrosion-resistant wire of at least 30 by 30 mesh, or two screens of at least 20 by 20 mesh spaced not less than one-half inch (13mm) nor more than 1 1/2 inches (38mm) apart. STBD Fuel vent flame screen was not secured to the vent.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2024
Resolved 25 October 2024
Resolution: Vessel properly secured flame screens to the vents.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 15 October 2024
Resolved
When the vessel is underway, the EPIRB must be mounted in a manner so that it will float-free if the vessel sinks. EPRIB bracket was not made for the type of EPIRB carried by the vessel and could not be properly secured in it's bracket.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2024
Resolved 25 October 2024
Resolution: Vessel replaced EPIRB bracket with one that is specifically made for the EPIRB that they carry onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 October 2024
Resolved
Design Verification and Periodic Safety test procedure documents approved by the Coast Guard must be retained aboard the vessel. Periodic Safety test procedures onboard were not CG approved. Provide CG approval within 90 days.
Action required: 705 - Other - as specified
Due 15 January 2025
Resolved 15 November 2024
Resolution: PSTP approved.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 15 October 2024
Resolved
Each cargo vessel must carry at least one rescue boat. Each rescue boat must be approved under approval series 160.156 and be equipped as specified in table 199.175 of this part. Vessel was not in possession of Certificate of Approval for their rescue boat.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2024
Resolved 25 October 2024
Resolution: Vessel provided Certificate of Approval for the rescue boat.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 15 October 2024
Resolved
On U.S. inspected ships, oily water separating equipment and bilge alarms must be approved under 46 CFR 162.050. Vessel was not in possession of Certificate of Approval for oily water separator.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2024
Resolved 25 October 2024
Resolution: Vessel provided OWS seperator approval.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 October 2024
Resolved
Each fire hydrant shall be identified in red letters and figures at least two inches high “FIRE STATION NO.#", Fire station on starboard aft main deck was not marked.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2024
Resolved 25 October 2024
Resolution: Vessel marked all fire stations with the marking " FIRE STATION" and the associated number.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 15 October 2024
Resolved
Each side of each rescue boat bow must be marked in block capital letters and numbers with the name of the vessel and the name of the port required to be marked on the stern of the vessel to meet the requirements of subpart 67.123 of this chapter. Rescue boat was not marked with vessel name and hailing port.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2024
Resolved 25 October 2024
Resolution: Vessel marked rescue boat with required markings including vessel name and hailing port.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Technical files and if applicable, monitoring manual
Issued 15 October 2024
Resolved
The revised NOx Technical Code 2008 shall be applied in the certification, testing, and measurement procedures for the standards set forth in this regulation. There was no documented evidence of NOx influencing engine component replacements/repair in the vessel’s Engine Technical Files.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2024
Resolved 12 November 2024
Resolution: Engine technical files were updated to include maintenance to NOx influencing engine components.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 23 January 2024
Resolved
The signal at both EOT locations must audible and sound continuously when the transmitter and the indicator do not show the same order; EOT at e-steering was not audible.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2024
Resolved 7 February 2024
Resolution: EOT was repaired and is now audible at e-steering.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 23 January 2024
Resolved
Each vessel must meet the applicable requirements in Subchapter S; escape hatch from e-steering was not sealing appropriately.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 January 2024
Resolved 23 January 2024
Resolution: Vessel crew replaced gasket and made adjustments to the hatch; it now seals properly.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 January 2024
Resolved
E-gen shall be provided with two means of energy for starting; battery bank for starting was not separated into two means.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2024
Resolved 7 February 2024
Resolution: Battery bank is now separated into two means of starting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 November 2023
Resolved
No repairs or alterations to machinery that affects the safety of the OSV may be made without notice to the OCMI.
On 13NOV23 MSU Houma received notification that the vessel's forward main generator was taken out of service due to a bad lead wire. Provide a technician's report attesting to the satisfactory operation of the vessel's forward main generator.
46 CFR 126.150
Action required: 17 - Rectify deficiencies prior to departure
Due 14 November 2023
Resolved 16 November 2023
Resolution: MSU Houma accepted the Technician and supplementary ABS Surveyor report the clear the outstanding CG-835.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 June 2023
Resolved
No repairs or alterations to the machinery may be made without notice to the OCMI.
Vessel experienced fire as a result of wiring failure on the generator for the main engine. Vessel must make proper repairs to wiring prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2023
Resolution: New generator installed. Proper testing conducted.
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 17 January 2023
Resolved
The auxiliary steering gear must be— 2) Capable of moving the rudder from 15° on either side to 15° on the other in not more than 60 seconds. The pumps powered up but would not actuate the steering gear. Repair and test.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 17 January 2023
Resolved 19 January 2023
Resolution: Tech reset the VFD and tested on main power and E-gen.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 17 January 2023
Resolved
(b) Where a generator driven by a propulsion engine is used as a source of electrical power, no speed change, throttle movement, or change in direction of the propeller shaft of the vessel may interrupt power to any of the loads specified in paragraph (a)(1) of this section. The E-gen continuously tripped off line while supporting the emergency electrical load.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 17 January 2023
Resolved 18 January 2023
Resolution: Witnessed e-generator power on within 45 seconds and hold load.
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 17 January 2023
Resolved
a) Each vessel must be designed and constructed to minimize fire hazards, as far as reasonable and practicable. The bow thruster fire detector was inop/disconnected. Install and test.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 17 January 2023
Resolved 18 January 2023
Resolution: Fire detector was repaired.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 17 January 2023
Resolved
a) Each vessel must be designed and constructed to minimize fire hazards, as far as reasonable and practicable. The fire damper in the the forward port tank farm was inop/ would not close.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 17 January 2023
Resolved 18 January 2023
Resolution: Witnessed operation of fire damper.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 17 January 2023
Resolved
Except as provided by paragraphs (l) and (m) of this section, there must be at least two means of escape, exclusive of windows and portholes, from each of the following spaces:
(1) Each space accessible to offshore workers.
(2) Crew accommodations and each space where the crew may normally be employed. The aft steering escape hatch was frozen closed and could not be opened from the space.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 17 January 2023
Resolved 18 January 2023
Resolution: Witnessed operation of emergency escape hatch open from steering gear room.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 November 2021
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary must be at least equivalent to the standards established by the ABS Steel Vessel Rules. There was a hydraulic leak on the bow tunnel thruster. There was also a hydraulic leak and broken hydraulic line bracket on the swing down thruster. All hydraulic leaks are required to be corrected.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 February 2022
Resolved 27 January 2022
Resolution: Marine Inspectors Verified service report listed in documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 November 2021
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary must be at least equivalent to the standards established by the ABS Steel Vessel Rules. There was an oil leak in the starboard main diesel engine and oil leak in the starboard shaft generator reduction gear. All hydraulic leaks are required to be corrected.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 February 2022
Resolved 27 January 2022
Resolution: Marine Inspectors verified service images showing leak was corrected. Uploaded into documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 November 2021
Resolved
Electrical installations on vessel must ensure protection of the vessel from electrical hazard. Steering gear motor controller #3 had a broken main switch. Switch is required to be fixed for proper operation.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 February 2022
Resolved 27 January 2022
Resolution: Marine Inspectors verified with picture showing the switch was fixed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 October 2019
Resolved
Vessel is 3,045 ITC and multi-certificated under 46 CFR subchapters L & I. IAW 46 CFR 62.01-5(a), self propelled vessels of 500 GT and over that are certificated under subchapter I are subject to 46 CFR Part 62, Vital System Automation under subchapter F. As per 46 CFR 62.20-1, design verification and periodic safety test procedures are required and must be submitted to the Coast Guard for approval.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2019
Resolved 15 April 2020
Resolution: The vessel shall provide the fully specified manning when operating in subchapter I with no reduction in engineering staff.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 31 October 2019
Resolved
Inspectors observed defective fire hoses during operational test of fire main to leak test all fire hoses onboard. Master shall ensure that the vessel's firefighting equipment is at all times ready for use and equipment is maintained & replaced as indicated.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 5 November 2019
Resolved 5 November 2019
Resolution: Cleared to satisfaction of attending Marine Inspector
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 31 October 2019
Resolved
Electrical installations in hazardous locations must comply with the standards listed in 46 CFR 111.106-3 for intrinsically safe or explosion-proof installations. Inspectors observed two (02) lights on the aft deck by fuel vents & cargo vents with improper wiring for the hazardous location.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2019
Resolved 5 December 2019
Resolution: Resealed wire glands on intrinsically safe lights to ensure proper requirements in haz zone.
Fire Fighting › Fire Pumps › Pressure
Issued 26 August 2016
Resolved
Provide proper operation of emergency fire pump and ability to produce 50 PSI from every hydrant independently.
Action required: 705 - Other - as specified
Due 26 August 2016
Resolved 26 August 2016
Resolution: On scene class surveyor tested repairs to the emergency fire pump.
Fire Fighting › Fire Pumps › Pressure
Issued 26 August 2016
Resolved
Provide two independent fire pumps each capable of simultaneously producing approximately 50 PSI measured by pito tube out of 2, 2.5" hoses from the 2 highest fire main hydrants onboard. Note** this is a correction to the had written item #2 on the CG-835 sent via email .
Action required: 705 - Other - as specified
Due 26 September 2016
Resolved 25 October 2016
Resolution: vessel identifed that the strainers were painted. vsl rep wire brushed the paint off the stainless strainer. witnessed operation at 110 psi for the primary and 55 psi for the secondary fire pump on 2 2.5 inch hoses.
Lifesaving › Lifebuoys › Serviceable
Issued 26 August 2016
Resolved
vessel had 4 unservicable ring buoys with degraded lines
Action required: 705 - Other - as specified
Due 2 September 2016
Resolved 7 September 2016
Resolution: [name withheld] sent pictures showing 4 satisfactorily repaired liferings.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 26 August 2016
Resolved
Door was missing CO2 Storage placcard, required vessel rep to provide CO2 storage placcard IAW 46CFR97.37-11
Due 26 September 2016
Resolved 6 September 2016
Resolution: vessel rep provided pictures clearing the deficency