Inspection history · 34
22 January 2026
COI Inspection · Administrative Inspection · Vessel Attendance
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8288406
12 February 2025
Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8078749
18 October 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8021031
1 July 2024
Administrative Inspection · Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7946405
15 August 2023
Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7764346
28 April 2023
Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7677758
2 December 2022
Construction Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7603215
15 September 2022
Administrative Inspection · Examination of Repairs · Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7561993
21 October 2021
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7345565
25 August 2021
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7296629
30 July 2021
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7272640
28 September 2020
Construction Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7066906
1 September 2020
COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7047327
1 September 2020
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7056281
29 May 2019
Internal Structural Exam · Drydock Exam · Administrative Inspection · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6698539
18 October 2018
COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6563519
13 November 2017
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6305541
16 August 2017
Hull Examination · Examination of Repairs · Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6242421
10 November 2016
Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6042222
13 October 2015
Periodic Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5741672
11 February 2015
Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5067097
25 August 2014
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4964835
27 September 2013
Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4717021
19 November 2012
Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4487651
13 September 2012
Internal Structural Exam · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4439880
15 February 2012
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4245217
7 October 2011
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4163129
17 November 2010
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3893842
20 January 2009
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3395192
14 January 2008
Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3130865
18 September 2007
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3060798
29 November 2006
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2831005
20 October 2005
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2531489
3 September 2004
Construction Oversight · Initial Certification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2185486
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 30 October 2024
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Vessel's rescue boat was not operational due to a faulty kill switch. Vessel can operate when inspected towing vessel is in vicinity.
Action required: 705 - Other - as specified
Resolved 27 November 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 October 2024
Resolved
Approved portable fire extinguishers and semi-portable fire extinguishing systems must be installed in accordance with table 1 to § 95.50-10(b). Vessel had 10-BC portable fire extinguisher next to flammable storage locker, needs to be 40-B.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 November 2024
Resolved 4 November 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 October 2024
Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. Fire
extinguisher at crane pedestal has rusted out bottom
and damaged hose from improper stowage. Fire
extinguisher hose at station 13 is damaged.
Both not in ready for use condition.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 November 2024
Resolved 4 November 2024
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 October 2024
Resolved
The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Vessel had circuit breaker for deck crane light immediately trips upon reset.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 November 2024
Resolved 4 November 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 October 2024
Resolved
At least one-half the total number of lifebuoys on the vessel must each be fitted with a self-igniting light approved under approval series 161.010. Lifebuoy self-igniting light not operational.
Action required: 10 - Deficiency Rectified
Resolved 30 October 2024
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 15 August 2023
Resolved
Each side of the rescue boat bow must be marked with the name of the vessel and hailing port. Name and hailing port not marked on bow of rescue boat.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 August 2023
Resolved 18 August 2023
Resolution: Markings painted on the rescue boat.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 August 2023
Resolved
General construction vessel shall be to minimize fire hazards. Bulkhead between pump rooms are not sealed. 2 penetrations.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 August 2023
Resolved 18 August 2023
Resolution: Penetrations sealed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 May 2023
Resolved
The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of this chapter. The requirements of § 58.10–5 (a), (c), and (d) shall apply to diesel engine installations. Engine design. All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Generator was able to start, but not able to take load due to megmeter internal safety; provide technician report identifying reason generator can not take load and operate as intended.
46 CFR 96.03-1(a)
46 CFR 58.10-10(a)
46 CFR 58.10-5 (a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 June 2023
Resolution: Received tech report from vessel rep. Generator all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 May 2023
Resolved
All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with the provisions of subchapter F (Marine Engineering) of this chapter. Each valve must close with a right-hand (clockwise) motion of the handwheel or operating lever as seen by one facing the end of the valve stem. Spring on butterfly valves for bilge system were not working as designed, maintenance or replace.
46 CFR 90.20-1 (a)
46 CFR 56.20-9 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2023
Resolution: Butterfly valves replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 May 2023
Resolved
Current carrying components must be protected from accidental contact by personnel operating or routinely servicing the device. MSD aerator is not hard wired to vessel. Hard wire Marine Sanitation Device following electrical guidelines for junction boxes.
33 CFR 159.95(c)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2023
Resolution: Aerator plug was removed and unit was hardwired into a junction box.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 11 May 2023
Resolved
Machinery space openings in position 1 or 2 shall be properly framed and efficiently enclosed by steel casings of ample strength. Access openings in such casings shall be fitted with doors complying with the requirements of 42.15-10(a). Byfold watertight door has gaps at top and bottom of connection point; make watertight.
46 CFR 42.15-35
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2023
Resolution: Doors adjusted, gaps no longer present.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 11 May 2023
Resolved
All marine engineering details such as piping, valves, fittings and their appurtenances installed on the vessel shall be designed, constructed, and installed in accordance with the provisions of Subchapter F of this chapter. There is a valve on the hot water tank that needs to be piped to the bilge.
46 CFR 96.03-1(a)
46 CFR 56.50-25
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2023
Resolution: Hot water heater piped into bilge.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 11 May 2023
Resolved
The installation of all systems of an electrical engineering or interior communications nature together with the details of design, construction, and installation shall be in accordance with the requirements of subchapter J. Systems of this type include general alarm systems. The general alarm did not function as designed under ships power or emergency power.
46CFR96.05-1(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 May 2023
Resolution: Corrected on the spot.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 29 April 2023
Resolved
Annual inspection. Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date, except as required in paragraph (b) of this section. Vessel notified USCG that they were operating outside of 3 month window for annual inspection. Directed vessel to cease operation immediately until annual inspection is complete. Vessel must complete satisfactory inspection prior to conducting cargo operations.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 28 April 2023
Resolved
The requirements of 58.10-5(a), (c) and (d) shall apply to diesel engine installations. Exhaust pipe installations must conform to the requirements of ABYC P-1 and part 1, section 23 of NFPA 302 (both incorporated by reference; see 46 CFR 58.03-1). Protective guards, jacketing or covers shall be provided wherever persons or gear might come in contact with the exhaust system where the temperature exceeds 200°F(93°C). Engine maintenance or engine repair may make the temporary removal of this protection necessary. Replace/repair lagging on generator.
46 CFR 58.10-10 (a)
46 CFR 58.10-5(d)
ABYC P-1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2023
Resolution: Received pictures of new lagging.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 September 2020
Resolved
There must be ground detection for each: electric propulsion system, ship's service power system, and lighting system; The 240 volt breaker panel in the engine room aft of ship's office showed a ground fault of 6 amps; Vessel shall show proof that the ground fault has been troubleshot, found, and corrected IAW 46 CFR 111.05-21 NLT 15SEP20; To the satisfaction of the OCMI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 September 2020
Resolved 30 November 2020
Resolution: Marine inspector verrified that the ground was no longer present.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 September 2020
Resolved
The inspector will determine if the tests and inspections required by 97.15-60 of this subchapter have been conducted; Fire Extinguisher #3 did not have its annual inspection by a certified servicing agency; Ensure fire extinguishers are serviced IAW 46 CFR 91.25-20; To the satisfaction of the OCMI.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 September 2020
Resolved 25 November 2020
Resolution: Extinguishers were swapped out for proper ones.
Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 14 October 2015
Resolved
REPAIR FUEL LEAK ON #2 AUXILIARY GENERATOR, AS ORIGINAL.
Action required: 705 - Other - as specified
Due 28 October 2015
Resolved 20 October 2015
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 14 October 2015
Resolved
REPAIR LEAK ON OIL DRAIN LINE FOR TURBOCHARGER ON #1 AUXILIARY GENERATOR, AS ORIGINAL.
Action required: 705 - Other - as specified
Due 28 October 2015
Resolved 20 October 2015
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 14 October 2015
Resolved
REPAIR LEAKS ON EXHAUST MANIFOLD ON #1 AND #2 PRIME MOVERS FOR DREDGE PUMPS.
Action required: 705 - Other - as specified
Due 28 October 2015
Resolved 20 October 2015
Electrical › Lighting (emergency) › Lighting Fixture
Issued 27 September 2013
Resolved
Repair emergency lighting in aft engine room.
Action required: 705 - Other - as specified
Due 28 October 2013
Resolved 1 November 2013
Resolution: O/O repaired emergency engine room life in aft section of engine room.
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 27 September 2013
Resolved
Repair engine alarm in aft engine room.
Action required: 705 - Other - as specified
Due 28 October 2013
Resolved 1 November 2013
Resolution: Alarm is audibly and visually operational.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 27 September 2013
Resolved
Show evidence of lifesaving equipment maintenance records.
Action required: 705 - Other - as specified
Due 30 October 2013
Resolved 1 November 2013
Resolution: Crew provided copies of records showing maintenance of life saving equipment.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 27 September 2013
Resolved
Provide proof or enrollment in and compliance with drug and alcohol testing program.
Action required: 705 - Other - as specified
Due 28 October 2013
Resolved 27 September 2013
Resolution: Vessel rep provided evidence of enrollment in and full compliance with a drug and alcohol testing program.
Lifesaving › Line-Throwing Appliances › Projectiles
Issued 27 September 2013
Resolved
Provide appropriate number of line throwing device and charges.
Action required: 705 - Other - as specified
Due 28 October 2013
Resolved 1 November 2013
Resolution: O/O provided appropriate number of line throwing devices and charges.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 27 September 2013
Resolved
Provide new first aid kit.
Action required: 705 - Other - as specified
Due 28 October 2013
Resolved 1 November 2013
Resolution: O/O provided new first aid kit with all parts within expiry dates.
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 27 September 2013
Resolved
Repair emergency lighting in forward engine room.
Action required: 705 - Other - as specified
Due 1 November 2013
Resolved 4 November 2013
Resolution: O/O replaced inoperable engine room alarm light.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 7 October 2011
Resolved
Auxilary generator was removed for servicing at time of inspection. Rep will call for CGMI to witness the operation of generator and over speed of prime mover when work is complete.
Action required: 705 - Other - as specified
Resolved 9 November 2011
Resolution: generator installed, run with the house load and the over speed device tested sat.
Fire Fighting › Means of Escape › Emergency Lighting
Issued 7 October 2011
Resolved
All e-lights not working due to either dead batteries or broken lights, proper operation must be proved to CGMI.
Action required: 705 - Other - as specified
Resolved 9 November 2011
Resolution: E-lighting tested throughout vessel and found to be working properly.
Construction/Loadline › Structures › Door
Issued 7 December 2010
Resolved
Repair or replace forward watertight door and starboard aft watertight door. Check hinges, pins, gaskets, and loose dogs and ensure proper operation. (All watertight doors)
Action required: 705 - Other - as specified
Due 13 January 2011
Resolved 13 January 2011
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 7 December 2010
Resolved
Install pressure gages on main deck air receivers.
Action required: 705 - Other - as specified
Due 7 December 2010
Resolved 13 January 2011
Engineering › Compressed Air System (start air) › Valve
Issued 7 December 2010
Resolved
Bench test relief valves on main deck air receivers to prove proper operation or replace with new relief valves.
Action required: 705 - Other - as specified
Due 13 January 2011
Resolved 13 January 2011
Electrical › Electric Generation Source (service) › Generator
Issued 7 December 2010
Resolved
Overspeed outboard (main) generator and test low lube oil shutdown
Action required: 705 - Other - as specified
Due 13 January 2011
Resolved 13 January 2011
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 7 December 2010
Resolved
Post donning instructions for life jackets where life jackets are stowed.
Action required: 705 - Other - as specified
Resolved 13 January 2011
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 17 November 2010
Resolved
Main Deck Air Receiver tests have not been conducted as required, make ready for internal inspection to the satisfaction of the attending USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 17 December 2010
Resolved 8 December 2010
Resolution: Approved air receivers based on internal inspection. Hydrostatic test recommended during next exam.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 17 November 2010
Resolved
Aft starboard side ring buoy missing retroreflective tape, replace buoy and/or retape buoy to the satisfaction of the attending USCG Marine Inspector
Action required: 705 - Other - as specified
Due 17 December 2010
Resolved 7 December 2010
Construction/Loadline › Hull › Bracket
Issued 18 September 2007
Resolved
Stanchion and diagonal stiffener in middle tank centerline aft of house damaged and required renewal. Bilge brackets in this and adjacent spaces damaged and require renewal. Damage appears to be due to grounding in past.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 20 September 2007
Resolution: Repairs completed satisfactorily.
Lifesaving › Inflatable Liferafts › Painter
Issued 29 November 2006
Resolved
The painter was not permanently attached to the weak link.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2006
Resolution: Corrected on the spot.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 29 November 2006
Resolved
Life line was not deployable as stowed in PVC piping.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2006
Engineering › Diesel Engine (propulsion-electric) › Crosshead Assembly
Issued 29 November 2006
Resolved
Air supply hose needed chaffing gear on the port main engine.
Due 14 December 2006
Resolved 29 November 2006
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 29 November 2006
Resolved
Emergency lighting in the engine room had dead batteries.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2006
Engineering › Fuel Oil Service System › Hose
Issued 20 October 2005
Resolved
Several lengths of flexible fuel hose exceed the 30-inch max length requirement.
Condition: Improper Installation
Due 31 January 2006
Resolved 20 September 2007
Lifesaving › Inflatable Liferafts › Carriage Requirement
Issued 20 October 2005
Resolved
Manual launching of inflatable liferaft from stowed location requires it to be lifted over 1 foot.
Condition: Improper Installation
Due 31 January 2006
Resolved 20 September 2007