Records from 1999 to 2003. Most recent: inspection, 25 June 2003.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Construction/Loadline
Issued 22 June 2001
Resolved
Lower center high bilge alarm prior to the carriage of passengers.
Condition: Unknown
Due 29 June 2001
Resolved 29 June 2001
Construction/Loadline
Issued 22 June 2001
Resolved
Make permanent repairs to stringer on stbd side, aft in way of engine motormount. 46 CFR 177.300
Condition: Unknown
Due 29 June 2001
Resolved 29 June 2001
Lifesaving
Issued 22 June 2001
Resolved
Properly install inflatable buoyant apparatus in accordance with 46 CFR 180.130 prior to the carriage of passengers.
Condition: Unknown
Due 3 July 2001
Resolved 3 July 2001
Construction/Loadline
Issued 22 June 2001
Resolved
Make permanent repairs to first transom batten stbd from centerline. _x001C_ 46 CFR 177.300
Condition: Unknown
Due 29 June 2001
Resolved 29 June 2001
Lifesaving
Issued 22 June 2001
Resolved
Provide detachable clip for lifering. 46 CFR 180.70. Requirement to be completed prior to the carriage of passengers.
Condition: Unknown
Due 29 June 2001
Resolved 29 June 2001
Engineering
Issued 22 June 2001
Resolved
Label fuel shut-off valves in accordance with 46 CFR 185.608
Condition: Unknown
Due 29 June 2001
Resolved 29 June 2001
Lifesaving
Issued 22 June 2001
Resolved
Provide orange smoke signals in accordance with 46 CFR 180.68. Requirement to be completed prior to the carriage of passengers. _x001C_
Condition: Unknown
Due 29 June 2001
Resolved 29 June 2001
Construction/Loadline
Issued 8 August 2000
Resolved
Provde check valve for all bilge overboards.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 8 August 2000
Resolved
Replace nut on aft drain plug.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Lifesaving
Issued 8 August 2000
Resolved
Attach IBA painter to hydrostatic release weak link.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 8 August 2000
Resolved
Reinforce deck fwd of engine room compartment.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Lifesaving
Issued 8 August 2000
Resolved
Provide retro reflective tape for all lifejackets.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Navigation
Issued 8 August 2000
Resolved
Repair radio.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Electrical
Issued 8 August 2000
Resolved
Replace wire clip on aft stbd speaker wire.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Electrical
Issued 8 August 2000
Resolved
Remove alligator clips and repair wiring on control console.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Electrical
Issued 8 August 2000
Resolved
Provide fuse at main panel for radio.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Engineering
Issued 8 August 2000
Resolved
Tighten shaft packing.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 8 August 2000
Resolved
Replace first stern frame to stbd from centerline.
Condition: Unknown
Due 8 August 2000
Resolved 8 August 2000
Engineering
Issued 8 August 2000
Resolved
Replace all vital system flexible hose with SAE/F1942 or USCG approved A1,_x001C_A2, B1, B2 hose.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 8 August 2000
Resolved
Provide auto bilge visual indication at the operating station.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Engineering
Issued 8 August 2000
Resolved
Label F.O. shut off valve on/off positions.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 26 July 1999
Resolved
REPAIR SPLIT 4TH BATTON ON PORT SIDE IN LAZARETTE.
Condition: Unknown
Due 26 July 1999
Resolved 26 July 1999
Construction/Loadline
Issued 26 July 1999
Resolved
PROVIDE COLLISION BULKHEAD WATER TIGHT.
Condition: Unknown
Due 20 August 1999
Resolved 10 May 2000
Construction/Loadline
Issued 26 July 1999
Resolved
REFASTEN STERN PLANKS.
Condition: Unknown
Due 26 July 1999
Resolved 26 July 1999
Engineering
Issued 26 July 1999
Resolved
PROVIDE ENGINE BLOWER INTERLOCK FOR GASOLINE ENGINE.
Condition: Unknown
Due 20 August 1999
Resolved 10 May 2000
Unknown
Issued 26 July 1999
Resolved
PROVIDE SUPPORTING DATA TO MSC FOR REVIEW PERTAINING TO VESSEL SISTER VESSEL STATUS TO PAUL HERRON OR343FC. IF DETERMINED BY MSC THAT VESSEL DOES NOT WARRENT SISTER STATUS FOR ISSUANCE OF STABILITY LTR THEN NEW STABILITY TEST MUST BE CONDUCTED.
Condition: Unknown
Due 26 July 1999
Resolved 26 July 1999