MAURY USCG vessel records
← All vessels

ONEGO GLOMMA

ONEGO GLOMMA is a 2002 public freight. The Coast Guard has recorded 14 inspections since 2020, most recently in June 2026, along with 26 deficiencies and 2 operational controls.

Records from 2020 to 2026. Most recent: inspection, 27 June 2026.

Built
2002
Last inspected
27 June 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 27 June 2026
Operational controls None recorded without a removal date
Years with a record 5 calendar years (2020–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9294977
712048
Flag
ANTIGUA AND BARBUDA
Maury page id
psix-712048

Documentation record

Tonnage as PSIX records it7767 - Convention (Subpart B), Gross Ton
10649 - Dead Weight, Metric Ton
7347 - Displacement, Metric Ton
3856 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 14

27 June 2026 PSC A
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8416962
7 April 2026 PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8343996
7 January 2026 PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8291284
9 November 2025 Administrative Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8266261
28 October 2025 PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8259816
23 October 2025 PSC A
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8254466
25 August 2025 Deficiency Check · PSC A
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8214325
5 August 2025 Ballast Water Examination · PSC B
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8202289
20 May 2025 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8134946
26 November 2024 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8040402
16 November 2024 In-Service Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8035755
13 August 2024 PSC A
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7975303
5 June 2022 PSC A
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7468561
21 May 2020 PSC B
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 6956736

Deficiency record · 26

14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 23 October 2025 Resolved
The master, owner, operator, agent, or person in charge of the vessel subject to this subpart must properly maintain the BWMS in accordance with all manufacturer specifications at all times. PSCO observed vessel's BWMS not within manufacturer's specifications since May 2025. Vessel is to not discharge untreated ballast. 33CFR151.2025(a)(1)
Condition: Invalid
Action required: 705 - Other - as specified
Due 3 November 2025
Resolved 9 November 2025
Resolution: Received class report from NKK attesting to the repair and proper operation of the vessel's BWMS.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 23 October 2025 Resolved
All ships 500 gross tonnage and upwards shall have... rudder indicators to determine and display rudder angle, readable from the conning positions. PSCO observed starboard conning position rudder indicator display incorrect angle. 74SOLAS(20) V/19.2.5.4
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 November 2025
Resolved 25 October 2025
Resolution: Received class report attesting to repair
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 23 October 2025 Resolved
Means shall be provided to close all openings which may admit air to or allow gas to escape from a protected space. PSCO observed gas sampling point for cargo hold no.2 unable to seal. 74SOLAS(01) II-2/5.1.4
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 November 2025
Resolved 25 October 2025
Resolution: Received class report attesting to repair and ability to seal properly
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Masters responsibility and authority
Issued 25 August 2025 Resolved
The company should clearly define and document the master’s responsibility with regard to: 1. implementing the safety and environmental-protection policy of the company. 2. motivating crew in the observation of that policy. The operational nature of deficiencies 02,03 04 and 05. provide objective evidence of a serious failure of the implementation of the ISM Code. An external audit report, satisfactory to the OCMI must be submitted, prior to clearance of this deficiency. 74SOLAS(2020) IX/3.1 ISM Code 2018 Part A 5.1
Action required: 30 - Ship detained
Resolved 2 September 2025
Resolution: Recieved NKK audit# 25UHM0058
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 25 August 2025 Resolved
Each fire drill shall include: .3 checking of fireman's outfits and other personal rescue equipment; 4. checking of relevant communication equipment. PSCO observed 02 fire drills conducted. Fire team was unable and unaware on proper donning of SCBA. Lack of communication between the fire team and bridge and lack of knowledge of fire fighting equipment located in galley. 74SOLAS(2024) III/19.3.5.2
Action required: 30 - Ship detained
Resolved 2 September 2025
Resolution: Recieved NKK audit# 25UHM0058 and witness satisfactory drill onboard vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 25 August 2025 Resolved
Muster stations shall be provided close to the embarkation stations. Each muster station shall have sufficient clear deck space to accommodate all persons assigned to muster at that station, but at least 0.35m.Muster stations shall be provided close to the embarkation stations. Each muster station shall have sufficient clear deck space to accommodate all persons assigned to muster at that station, but at least 0.35m². PSCO observed muster station obstructed by scaffolding blocking more than 50% of the muster station. 74SOLAS(2024) III/11.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2025
Resolution: Recieved NKK audit# 25UHM0058. Observed scaffolding had been removed.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 25 August 2025 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 August 2025
Resolution: PSCO observed a sastisfactory abandon ship drill.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 25 August 2025 Resolved
On-board training in the use of the ship's life-saving appliances, including survival craft equipment, and in the use of ship's fire -extinguishing appliances shall be given as soon as possible... PSCO questioned 04 personnel about proper wearing of immersion suits. All crew members responded with no life-jacket required. Immersion suits did not meet the requirement or having fittings to not require life jackets. 74SOLAS(2024) III / 19.4.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2025
Resolution: Recieved NKK audit# 25UHM0058
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 25 August 2025 Resolved
The fire resistance of doors shall, as far as practicable, be equivalent to that of the division in which they are fitted. Doors and door frames in "A" class divisions shall be constructed of steel. PSCO observed that the paint locker door was not able to maintain an "A" class boundary due to handle and fit being loose and door seal completely painted over. 74 SOLAS (2001) II-2 / 47.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 October 2025
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 August 2025 Resolved
Except as provided in paragraph 4, two means of escape shall be provided from each machinery space of Category A. In particular one of the following provisions shall be complied with: PSCO observed that the engine control room had ladders on the main deck blocking the escape hatch. 74 SOLAS (2024) III/19.4.1
Action required: 10 - Deficiency Rectified
Resolved 25 August 2025
Resolution: Ladder blocking escape hatch was removed by vessel crew.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 August 2025 Resolved
Below the lowest open deck the main means of escape shall be a stairway and the second escape may be a trunk or a stairway. PSCO observed that the emergency escape from provision store had multiple cases of water blocking the escape trunk. SOLAS (2001) II-2/45.1.2.1
Action required: 10 - Deficiency Rectified
Resolved 25 August 2025
Resolution: PSCO observed the cases of water blocking the escape truck relocated.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Masters responsibility and authority
Issued 5 August 2025 Resolved
The company should clearly define and document the master's responsibility with regard to : 1. Implementing the safety and environmental-protection policy of the company. 2. motivating crew in the observation of that policy. The Chief Engineer removed the International Shore connection from its intended location to connect the seawater pump and freshwater generator to replace a portion of wasted piping in the engine room. The Chief Engineer failed to notify the Master, Company, Class Society, or the Flag State. The vessel failed to fully implement the requirements of the SMS as evident by deficiencies 02, 04, 05, 07, 09, 12, and 13. An external audit is required. 74SOLAS (20) IX/3.1 ISM Code 2018 Part A 5.1
Action required: 30 - Ship detained
Due 5 August 2025
Resolved 8 August 2025
Resolution: Recieved NKK ISM Shipboard Audit Report# 25UHM0051.
07 - Fire Safety › N/A - No Subsystem › International shore-connection
Issued 5 August 2025 Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained and ready for use. PSCO observed the vessel's international shore connection being used in the engine room to connect the seawater pump to the fresh water generator in order to by-pass wasted piping. Chief Engineer stated it was installed on the seawater pump during the voyage from New Orleans to Lake Charles. 74 SOLAS (20) II-2/14.1.1
Action required: 30 - Ship detained
Due 5 August 2025
Resolved 8 August 2025
Resolution: Received NKK survey report# 25UH0343 rectifying deficiency.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 5 August 2025 Resolved
The machinery, boilers and other pressure vessels, associated piping systems, and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board due regard being paid to moving parts, hot surfaces and other hazards. After being manually shut down, the emergency generator will restart on its own with no known cause for its restart, posing a hazard to any persons that may be working on the prime mover at the time it automatically starts.74SOLAS(20) II-1/26.1
Action required: 60 - Rectify deficiencies prior to movement
Due 5 August 2025
Resolved 8 August 2025
Resolution: Received NKK survey report# 25UH0343 rectifying deficiency.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 August 2025 Resolved
All electrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in a normal manner. PSCO observed temporary repair on a high voltage line to the gantry crane posing a hazard to crew members and personnel. Use of damaged electrical cable is prohibited.74SOLAS(04)II-1/45.1.3
Action required: 60 - Rectify deficiencies prior to movement
Due 5 August 2025
Resolved 8 August 2025
Resolution: Received NKK survey report# 25UH0343 rectifying deficiency.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 August 2025 Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids ...means shall be provided to control leaks of flammable liquids and limit the accumulation of flammable vapors. PSCO observed approximately 40 containers of flammable liquids (paint) outside of paint locker in the bosun store. 74SOLAS(20)II-2/4.1
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2025
Resolved 5 August 2025
Resolution: The container containing flammable liquids (paint) were moved into the paint locker.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 August 2025 Resolved
Doors required to be self-closing shall not be fitted with hold-back hooks... PSCO observed the PS main deck ladder well door was held open with a metal pipe.74SOLAS(01)II-2/47.2
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2025
Resolved 8 August 2025
Resolution: Received NKK survey report# 25UH0343 rectifying deficiency.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 5 August 2025 Resolved
All ships officers concerned with the operation and/or maintenance of steering gear shall be familiar with the operation of the steering systems fitted on the ship and with the procedures for changing from one system to another. PSCO observed Chief Engineer and Second Engineer unable to perform loss of power and low hydraulic oil alarm tests on the steering gear.74SOLAS(20)V/26.3.2
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2025
Resolved 8 August 2025
Resolution: Received NKK survey report# 25UH0343 rectifying deficiency.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 5 August 2025 Resolved
If a ship has any watch or work stations which are located remotely from the place or places where immersion suits are normally stowed, including remotely located survival craft carried in accordance with regulation 31.1.4, additional immersion suits of an appropriate size shall be provided at these locations for the number of persons normally on watch or working at those locations at any time. PSCO observed no immersion suits in the engine control room.74SOLAS(20) III/32.3.3
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 5 August 2025
Resolved 25 October 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 August 2025 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board due regard being paid to moving parts, hot surfaces and other hazards. PSCO observed a removed section of wasted piping, on the deck of the engine room, intended to connect the seawater pump to the freshwater generator. The Chief Engineer failed to notify the Master, the Company, the Classification Society, or the Flag State that the system was inoperable. 74SOLAS(20)II-1/26.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 5 August 2025
Resolved 25 October 2025
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 5 August 2025 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger. PSCO observed wastage adjacent STBD accommodation ladder on poop and A deck. 74SOLAS(20)I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 September 2025
Resolved 25 October 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 5 August 2025 Resolved
The opening below the lowest course of the guard rails shall not exceed 230 mm (9 inches). PSCO observed lower guard rail PS close to midships was cracked. ILLC as modified 2003 Reg 25.3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 September 2025
Resolved 25 October 2025
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 5 August 2025 Resolved
The Administration shall be satisfied that adequate arrangements are in in place to ensure that the performance of the equipment required by this chapter are maintained. PSCO observed the gyrocompass door propped open. [name withheld] stated the door was propped open to provide ventilation to the gyrocompass as advised by a technician due to overheating.74SOLAS(20)V/16.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 September 2025
Resolved 25 October 2025
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 5 August 2025 Resolved
The master, owner, operator, agent, or person in charge of the vessel subject to this subpart must properly maintain the BWMS in accordance with all manufacturer specifications at all times of discharge into the waters of the United States. PSCO observed vessel's ballast water treatment system has not been within manufacturer specifications since May 2025. Vessel is not authorized to discharge untreated ballast in US Waters. 33CFR151.2025(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 September 2025
Resolved 25 October 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 November 2024 Resolved
MAIN AND AUXILIARY MACHINERY ESSENTIAL FOR THE PROPULSION AND SAFETY OF THE SHIP SHALL BE PROVIDED WITH EFFECTIVE MEANS FOR ITS OPERATION AND CONTROL. MAIN ENGINE JACKING GEAR AUTOMATIC POWER SHUTOFF NOT FUNCTIONING PROPERLY. 74SOLAS(04)II-1/31.1 15AC
Action required: 15 - Rectify deficiencies by next port
Due 25 November 2024
Resolved 26 November 2024
Resolution: Vessel has submitted documentation of repairs and working order.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 August 2024 Resolved
EVERY FUEL OIL PIPE, WHICH IF DAMAGED, WOULD ALLOW OIL TO ESCAPE FROM A STORAGE, SETTLING, OR DAILY SERVICE TANK, SITUATIONED ABOVE THE DOUBLE BOTTOM, SHALL BE FITTED WITH A COCK OR VALVE DIRECTLY ON THE TANK CAPABLE OF BEING CLOSED FROM A SAFE POSITION OUTSIDE THE SPACE CONCERNED IN THE EVENT OF A FIRE OCCURING IN THE SPACE IN WHICH SUCH TANKS ARE SITUATED. EMERGENCY GENERATOR FUEL SHUT OFF VALVE DID NOT ACTUATE FROM THE EMERGENCY SHUT OFF POSITION. SOLAS 74/78 (2001 CONS. ED.) II-2/2.5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2024
Resolved 21 August 2024
Resolution: See documents for class report.

Ownership record