Records from 2016 to 2025. Most recent: inspection, 19 May 2025.
Documentation record
Registered dimensions (L × B × D)89.3 ft × 21.0 ft × 5.5 ft
Registered tonnagegross 34 / net 23
ITC dimensions (L × B × D)89.3 ft × 21.0 ft × 5.5 ft
ITC tonnagegross 97 / net 29
BuilderGUNDERSON BROTHERS ENGINEERING · PORTLAND, OR, UNITED STATES · built 1968
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portANACORTES, WA
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 3 October 2025 · expires 31 October 2026
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it34 - Regulatory (Subpart C or D), Gross Ton
97 - Convention (Subpart B), Gross Ton
23 - Regulatory (Subpart C or D), Net Ton
29 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 17
19 May 2025
Drydock Exam · Internal Structural Exam · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8139428
27 August 2024
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7990727
29 August 2023
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7778474
22 June 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7724106
13 October 2022
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7577006
8 September 2022
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7554576
19 April 2022
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7434083
7 September 2021
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7295157
22 June 2020
COI Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6984189
15 June 2020
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6977102
12 August 2019
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6780909
10 September 2018
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6533251
18 June 2018
Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6448720
15 March 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6372214
5 September 2017
Annual Inspection · DAPI Audit
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6260411
17 June 2016
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5913221
17 June 2016
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5966998
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 27 August 2024
Resolved
Piping the temperature of which exceeds 150 degrees F must be suitably insulated where necessary to prevent injuries. Port and starboard engine exhaust piping inboard of the engine room was missing lagging/insulation and must be replaced.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 September 2024
Resolved 28 August 2024
Resolution: Operator fully replaced lagging port and stbd side engine exhaust piping with new insulation. All sat.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 27 August 2024
Resolved
Deck plating port and starboard of superstructure found to be deteriorated. Small holes within outboard port and starboard areas visible in engine room overhead. Crop and renew port and starboard wasted deck plating at next drydocking.
Action required: 705 - Other - as specified
Due 30 June 2025
Resolved 17 June 2025
Resolution: Observed new plate steel inserted in way of observed areas.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 September 2022
Resolved
A number of child size life jackets equal to at least 10% of the number of persons permitted on board must be provided. Vessel did not have any child sized life jackets on board.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 September 2022
Resolved 23 September 2022
Resolution: Vessel acquired 02 child sized life jackets to meet the requirements of 46 CFR 180.71.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 September 2022
Resolved
Nonmetallic flexible hose may be used in lengths not exceeding 30 inches and must be in accordance with SAE J1942. The nonmetallic flexible hose used in the fuel supply to the ship's diesel generator exceeds 30 inches in length and is not in accordance with SAE J1942.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 September 2022
Resolved 23 September 2022
Resolution: Vessel provided evidence of modifying the ship's diesel generator fuel supply piping to ensure the nonmetallic flexible hose does not exceed 30 inches in length and is in accordance with SAE J1942.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 10 September 2018
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 October 2018
Resolved 10 October 2018
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 10 September 2018
Resolved
Each item of equipment carried, whether required under this section or not, must be secured by lashings, stored in lockers, compartments, brackets, or have equivalent mounting or storage arrangements that do not...adversely affect seaworthiness of the survival craft. One of the container lashings had broken off the liferaft container.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 September 2018
Resolved 24 September 2018
Engineering › Bilge Water Management System › Valve
Issued 21 June 2018
Resolved
Vessel's non integral keel coolers did not have sea valvles near the shell as required by the regulation.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 29 September 2018
Resolved 10 October 2018
Resolution: Valve was in place and operable.
Engineering › Bilge Water Management System › Valve
Issued 21 June 2018
Resolved
Vessel did not have a screwdown valve for the bilge piping forward of the collision bulkhead.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2018
Resolved 23 October 2018
Resolution: Received video fm o/o indicating valve was fully operational.
Engineering › Bilge Water Management System › Valve
Issued 21 June 2018
Resolved
Vessel has a deck drain valve that drains less than six inches above the waterline.
46CFR176.350(c)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2018
Resolved 27 June 2018
Resolution: The master had the shipyard install a deck drain valve as the opening for the deck drain was less than six inches above the water line.
Construction/Loadline › Structures › Deck Plating
Issued 21 June 2018
Resolved
Vessel has corrosion with small holes on upper portion of port side gunwale.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2018
Resolved 27 June 2018
Resolution: The Master had the shipyard crop out and replace the portion of gunwale in question.
Engineering › Bilge Water Management System › Pump
Issued 17 June 2016
Resolved
Repair leak to stbd bilge pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 August 2016
Resolved 4 August 2016
Resolution: Pump was rebuilt & tested, all sat.