Records from 2000 to 2007. Most recent: inspection, 7 September 2007.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 4 May 2006
Resolved
Replace port ring buoy light clip.
Due 5 June 2006
Resolved 8 May 2006
Communications › Radio Communications › EPIRB
Issued 4 May 2006
Resolved
Replace EPIRB - not functional.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2006
Fire Fighting › Portable CO2 Fire Extinguisher › Pressure
Issued 4 May 2006
Resolved
Replace/recharge fire extinguisher in the flammable stores locker.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2006
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 4 May 2006
Resolved
Secure ships fire plan in a water tight container.
Due 4 June 2006
Resolved 8 May 2006
Accommodation/Occupational Safety › Occupational Safety › Storm Rail
Issued 4 May 2006
Resolved
Provide railings around tween deck cooking and mess area.
Due 4 June 2006
Resolved 8 May 2006
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 4 May 2006
Resolved
Re-run TV/cable to starboard accommodation trailer so as not to impede personnel.
Due 4 June 2006
Resolved 8 May 2006
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 4 May 2006
Resolved
Permanently secure TV and refrigerators in starboard accommodation trailer.
Due 4 June 2006
Resolved 8 May 2006
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 4 May 2006
Resolved
Re-run starboard accommodation trailer - audio speaker wires so as not to impede personnel.
Due 4 June 2006
Resolved 8 May 2006
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 4 May 2006
Resolved
Replace emergency light bulb cover in the forward portion of the port accommodation trailer.
Due 4 June 2006
Resolved 8 May 2006
Pollution Prevention/Response › Response Equipment › Containers
Issued 4 May 2006
Resolved
De-water/replace spill kit (2" of water in container).
Due 4 June 2006
Resolved 8 May 2006
Accommodation/Occupational Safety › Potable Water System › General
Issued 4 May 2006
Resolved
Permanently brace the potable water line running to the port accommodation trailer.
Due 4 June 2006
Resolved 8 May 2006
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 4 May 2006
Resolved
Prove proper operation of fire detection systems in portable accommodation spaces.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2006
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 4 May 2006
Resolved
Amend vessel's fire plan to include all accommodation trailers.
Due 4 June 2006
Resolved 8 May 2006
Lifesaving › Hand Flares › Expired
Issued 4 May 2006
Resolved
Provide for a total of 12 rocket parachute flares.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2006
Operations/Management › Drills/Instruction › Fire
Issued 4 May 2006
Resolved
Conduct fire, abandon ship and security drills.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2006
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 4 May 2006
Resolved
Expired medications in the first aid kit.
Due 4 June 2006
Resolved 8 May 2006
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 4 May 2006
Resolved
Repair smoke detector in galley.
Due 4 June 2006
Resolved 8 May 2006
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 4 May 2006
Resolved
Vessel limited to 20 passengers - adult life jackets w/ proper working lights, whistles and vessel name noted.
Due 4 June 2006
Resolved 8 May 2006
Engineering › Steering Gear System › Rudder
Issued 4 May 2006
Resolved
Provide rudder stops - 46 CFR 130.140.
Due 4 June 2006
Resolved 8 May 2006
Electrical › Lighting (emergency) › Lighting Fixture
Issued 4 May 2006
Resolved
Prove proper operation of 16 emergency lighting in engine room (battle lanterns).
Due 4 June 2006
Resolved 9 May 2006
Fire Fighting › Fire Pumps › Pressure
Issued 4 May 2006
Resolved
Prove proper operation of fire pump discharge pressure gauge (min pressure 50 psi).
Due 4 June 2006
Resolved 8 May 2006
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 4 May 2006
Resolved
Provide manufacturer's approval information for temporary MSDS on deck.
Due 4 June 2006
Resolved 8 May 2006
Fire Fighting › Nozzles › Condition
Issued 4 May 2006
Resolved
Provide 4 properly operating fire hose nozzles for fire stations #1, #2, #3 and #4.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2006
Engineering › Fuel Oil Service System › Filter
Issued 4 May 2006
Resolved
Provide marine listed fuel filters for engines and generators or proof of current filters marine listing.
Due 4 June 2006
Resolved 18 July 2006
Electrical › Electric Generation Source (emergency) › Generator
Issued 4 May 2006
Resolved
Prove proper operation of emergency generator.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2006
Lifesaving › Lifebuoys › Not on Board
Issued 20 April 2006
Resolved
Per vessel COI provide 3 additional ring buoys - 46 CFR 133.70.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2006
Construction/Loadline › Penetrations › Pipe Flange
Issued 7 March 2006
Resolved
base in fuel day tank sounding tube is cracked and leaking...temp repairs have been made and pipe is to be renewed at next drydock
Action required: 705 - Other - as specified
Resolved 4 May 2006
Construction/Loadline › Structures › Superstructure
Issued 7 March 2006
Resolved
Vsl operator is required to submit plans for electrical and piping installations associated with added deck modules and remove disapproved wiring/piping
Action required: 705 - Other - as specified
Resolved 19 July 2006
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 7 March 2006
Resolved
rescue boat placed on top of deck accomodation module and not secured in any way...no access provided to rescue boat location
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2006
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 22 November 2005
Resolved
Prove proper operation of Fixed Fire Fighting (Extinguishing) System.
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 November 2005
Resolved 3 December 2005
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 22 November 2005
Resolved
Prove proper operation of bilge alarms.
Action required: 705 - Other - as specified
Due 22 November 2005
Resolved 16 December 2005
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 22 November 2005
Resolved
Prove proper operation of vessel bilge system.
Action required: 705 - Other - as specified
Due 22 November 2005
Resolved 3 December 2005
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 22 November 2005
Resolved
Remove all portable bilge pumps and piping.
Action required: 705 - Other - as specified
Due 22 November 2005
Resolved 3 December 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 22 November 2005
Resolved
Remove or properly repair dead wires located throughout vessel.
Condition: Improper/Lack of Maintenance
Due 22 November 2005
Resolved 16 December 2005
Lifesaving › Rescue Boat › Propulsion Engine
Issued 22 November 2005
Resolved
Prove proper operation of Rescue Boat engine and deployment procedures
Condition: Improper/Lack of Maintenance
Due 6 December 2005
Resolved 16 December 2005
Engineering › Generator (propulsion/auxiliary-electric) › Reverse Power Protection Relay Circuitry
Issued 22 November 2005
Resolved
Prove proper operation of Reverse Power Relays
Condition: Improper/Lack of Maintenance
Due 16 December 2005
Resolved 22 November 2005
Communications › Alarms/Indicators › Bilge Alarm
Issued 12 September 2005
Resolved
Prove proper operation of bilge alarms
Condition: Improper/Lack of Maintenance
Due 14 September 2005
Resolved 17 September 2005
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 12 September 2005
Resolved
Provide handrails IAW 127.310 for all elevated walkways.
Condition: Improper Installation
Due 14 September 2005
Resolved 17 September 2005
Fire Fighting › Fixed Halon Fire Extinguishing System › Tanks
Issued 12 September 2005
Resolved
Service Fixed fire fighting system
Condition: Improper/Lack of Maintenance
Due 14 September 2005
Resolved 17 September 2005
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 15 June 2005
Resolved
Install correct type switch board matting in way of main switch board.
Due 15 June 2005
Resolved 15 June 2005
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 15 June 2005
Resolved
Prove proper operatation of all engine alarms and shut downs.
Due 15 June 2005
Resolved 15 June 2005
Electrical › Electrical Distribution System (service) › Switchboard
Issued 15 June 2005
Resolved
Prover proper operation of generator load sharing system and reverse power relays.
Due 15 June 2005
Resolved 15 June 2005
Engineering › Bilge Water Management System › Strainer
Issued 15 June 2005
Resolved
Install strainer in bilge piping system in way of engine room.
Due 15 June 2005
Resolved 15 June 2005
Resolution: Piping in center of engine room was extra and was removed to satisfy this requirement.
Engineering › Fuel Oil Service System › Hose
Issued 15 June 2005
Resolved
Replace flexible fuel hose in way of generators, with hose meeting J-1942 standards.
Due 15 June 2005
Resolved 15 June 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 June 2005
Resolved
Provide electrical plans for approval for the replacement of all welding cable in way of generators starting and charging system. Plans to be submitted to the cognizant OCMI.
Due 27 June 2005
Resolved 10 March 2006
Resolution: Condition not observed upon inspection. Vsl rep stated that welding equipment was removed.
Fire Fighting › Nozzles › Location
Issued 15 June 2005
Resolved
Install nozzle for fire station in tunnel.
Due 15 June 2005
Resolved 15 June 2005
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 15 June 2005
Resolved
Secure governor on Port MDE.
Due 15 June 2005
Resolved 15 June 2005
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 15 June 2005
Resolved
Properly install heat detectors just fwd of hatch 4-119-4.
Due 15 June 2005
Resolved 15 June 2005
Stability › Watertight Integrity › General
Issued 15 June 2005
Resolved
Replace nut on lower stbd side of hatch 4-119-4.
Due 15 June 2005
Resolved 15 June 2005
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 15 June 2005
Resolved
Install fuel containment around fueling stations.
Due 15 June 2005
Resolved 15 June 2005
Engineering › Freshwater System (intermediary cooling) › Hose
Issued 15 June 2005
Resolved
Install correct type flexible water connection in way of generator keel cooler piping.
Due 1 September 2005
Resolved 1 July 2005
Operations/Management › Drills/Instruction › Fire
Issued 15 June 2005
Resolved
Show improvement and proficiency in conducting fire and abandon ship drills.
Due 5 July 2005
Resolved 1 July 2005