← All vessels
SPRUCE ARROW
SPRUCE ARROW is a 2002 freight ship. The Coast Guard has recorded 14 inspections since 2007, most recently in April 2025, along with 11 deficiencies and 2 operational controls.
Records from 2007 to 2025. Most recent: inspection, 25 April 2025.
- Built
- 2002
- Last inspected
- 25 April 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 11 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9232814 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
C6SD9
722325
Flag
BAHAMAS, THE
—
Maury page id
psix-722325
Inspections, by type
…with no type recorded2
Years with a record
10 calendar years (2007–2025)
The 14 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it47792 - Dead Weight, Metric Ton
32458 - Convention (Subpart B), Gross Ton
60589 - Displacement, Metric Ton
15363 - Convention (Subpart B), Net Ton
32458 - Convention (Subpart B), Gross Ton
60589 - Displacement, Metric Ton
15363 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 14
25 April 2025
PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8119945
21 April 2025
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8113355
12 October 2021
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7326499
13 June 2020
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6968248
16 September 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6809708
9 September 2017
Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6263090
30 August 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5981720
24 August 2014
Administrative Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4965177
11 August 2014
Deficiency Check · ISPS III Exam · NPV Safety Exam · MARPOL Annex I Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4951305
11 August 2014
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4952658
13 January 2012
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4224138
7 November 2008
PII Safety Exam · MARPOL Annex I Examination · MARPOL Annex V Examination · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3357351
2 October 2007
ISPS II Exam · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3070837
1 October 2007
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3070495
Deficiency record · 11
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 12 October 2021
Resolved
All life-saving appliances and arrangments shall comply with the code. The rations shall be packed in a vacccume sealed package. All 32 rations lost their vaccume.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 September 2019
Resolved
Vessel was found to have flammable liquids in forward Bos'n hold. Flammable liquid lockers shall be protected by an appropriate fire extinguishing arrangement approved by Adminstration.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 16 September 2019
Resolved
It was observed during a steering gear test that the steering gear pump #1 manual actuator was damaged. Vessle will replace with repalcement part located on board.
Navigation › Voyage Data Recorder › Simplified Voyage Data Recorder (SVDR)
Issued 30 August 2016
Resolved
PSC exam discovered that the S-VDR was inoperable and a def was written for a prior to departure.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 22 August 2014
Resolved
0220: "Contracting governments...ensuring...all ships shall be sufficiently and efficiently manned." Vessel must provide evidence that minimum safe manning is met and personnel are properly endorsed by flag administration in accordance with STCW. 74 SOLAS(2009 Cons.Ed.) V/14.1 (17c)
Engineering › Bilge Water Management System › Pump
Issued 13 August 2014
Resolved
0740, AT LEAST TWO POWER PUMPS CONNECTED TO THE MAIN BILGE SYSTEM SHALL BE PROVIDED. THE BILGE CENTRIFUGAL PUMP FOR THE ENGINE ROOM IS INOPERABLE. 74 SOLAS (04 CONS) CH. II-1/21.3. 30ABC
Operations/Management › Mandatory Ship Reporting Systems › Entry Report
Issued 13 August 2014
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Engineering › Bilge Water Management System › Valve
Issued 13 August 2014
Resolved
1286, SHIPS CONSTRUCTED ON OR AFTER 1 JULY 1998 SHALL COMPLY WITH THE REQUIREMENTS OF REGULATION 17. ALL INLETS AND DISCHARGES IN THE SHELL PLATING SHALL BE FITTED WITH EFFICIENT AND ACCESSIBLE ARRANGEMENTS FOR PREVENTING THE ACCIDENTAL ADMISSION OF WATER INTO THE SHIP. SEA WATER INLET VALVE FOR STARBOARD BILGE SUCTION FROM SEA CHEST (SEE NARRATIVE FOR REMAINING DEFICIENCY). 17AC
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 11 August 2014
Resolved
Except for hatches between cargo, ...all opening shall be provided with permanently attached means of closing which shall be at least as effective for resisting fires as the divisions in which they are fitted; the PSCOs observed more than half of the fire doors would not seal properly to maintain class A division. 74 SOLAS (2001) Ch II-2, Reg 30.1 (17ac)
Engineering › Fuel Oil Service System › Piping
Issued 11 August 2014
Resolved
Oil fuel lines shall be screened or otherwise suitably protected to avoid, oil spray or oil leakages onto hot surfaces, into machinery air intakes, or other sources of ignition. Flange shielding missing in F/O purifier room piping and on main diesel engine. 74 SOLAS (2001) Ch II-2, Reg 15.2.11 (40ac)
Engineering › Bilge Water Management System › Valve
Issued 11 August 2014
Resolved
The location of the controls of any valve serving a sea inlet, a discharge below the waterline or a bilge injection system shall be so sited as to allow adequate time for operation in case of influx of water, arragnments shall be made to operate the controls from a position above such level; 4 bilge water rach rod valves were inoperable. 74SOLAS(2004) Ch II-1 Reg 48.3
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.