← All vessels
PLAQUEMINES PRIDE
Passenger (Inspected) · Passenger Ship class · Built 2000s · USCG Heartland District (CGD-H) · Other hulls named PLAQUEMINES PRIDE
PLAQUEMINES PRIDE is a 2004 passenger vessel (inspected). The Coast Guard has recorded 95 inspections since 2004, most recently in June 2026, along with 115 deficiencies, 1 operational control and 7 casualty investigations between 2011 and 2014.
Records from 2004 to 2026. Most recent: inspection, 30 June 2026.
- Built
- 2004
- Last inspected
- 30 June 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 115 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 7 investigations · 2011–2014
Identity
1163463
WDC3373
723281
Flag
UNITED STATES
367006890
Maury page id
psix-723281
Inspections, by type
…with no type recorded5
Years with a record
22 calendar years (2004–2026)
The 95 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)205.0 ft × 67.0 ft × 13.0 ft
Registered tonnagegross 932 / net 310
ITC dimensions (L × B × D)205.0 ft × 67.0 ft × 13.0 ft
ITC tonnagegross 1,099 / net 329
BuilderQUALITY SHIPYARDS LLC · HOUMA, LA, UNITED STATES · built 2004
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPLAQUEMINES PARRISH, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 25 February 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it310 - Regulatory (Subpart C or D), Net Ton
329 - Convention (Subpart B), Net Ton
932 - Regulatory (Subpart C or D), Gross Ton
1099 - Convention (Subpart B), Gross Ton
329 - Convention (Subpart B), Net Ton
932 - Regulatory (Subpart C or D), Gross Ton
1099 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDC3373MMSI 367006890 · active · compulsorily equipped · granted 6 November 2024, expires 31 December 2034
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 95
30 June 2026
MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8420310
16 June 2026
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8406042
5 May 2026
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8340836
30 April 2026
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8358894
6 March 2026
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8319239
3 February 2026
Re-Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8298693
24 October 2025
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8245262
2 April 2025
Drydock Exam · In-Service Inspection · Internal Structural Exam · COI Inspection · Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8103804
12 December 2024
Permit to Proceed
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8046827
9 August 2024
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7939548
27 March 2024
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7885617
6 December 2023
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7834600
12 October 2023
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7807564
11 August 2023
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7748311
5 May 2023
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7670291
30 March 2023
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7659817
20 January 2023
MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7611285
4 November 2022
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7574937
9 June 2022
Periodic Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7472867
12 April 2022
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7429748
19 February 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7398894
25 January 2022
Deficiency Check · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7375966
21 October 2021
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7337127
14 September 2021
Damage Survey · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7311860
30 July 2021
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7248427
29 July 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7271811
27 July 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7269950
21 May 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7202528
7 May 2021
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7183307
10 November 2020
Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7093055
14 October 2020
Damage Survey · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7077301
14 August 2020
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7032943
12 May 2020
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6952187
17 December 2019
MTSA Verification · COI Inspection · Examination of Repairs · Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6875711
30 October 2019
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6835678
9 September 2019
Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6807225
17 July 2019
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6728598
26 April 2019
Re-Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6670843
24 January 2019
MTSA Verification · Re-Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6604862
20 October 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6566028
19 October 2018
Deficiency Check · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6558282
24 July 2018
Periodic Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6477281
28 May 2018
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6428718
27 April 2018
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6389945
13 December 2017
COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6324009
14 August 2017
Examination of Repairs · In-Service Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6251459
28 April 2017
Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6132864
14 February 2017
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6088690
3 February 2017
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6080815
11 December 2016
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5822869
21 October 2016
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6023768
20 July 2016
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5909081
22 April 2016
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5857457
12 April 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5852542
3 March 2016
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5826046
26 February 2016
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5820784
9 August 2015
Damage Survey · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5210753
7 August 2015
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5212495
19 October 2014
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5008543
12 June 2014
Deficiency Check · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4883851
21 May 2014
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4864127
11 May 2014
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4856437
13 March 2014
COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4813249
3 July 2012
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4358686
26 June 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4357478
20 December 2011
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4206735
27 September 2011
Administrative Inspection · Damage Survey · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4155650
26 September 2011
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4147015
12 September 2011
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4142786
22 December 2010
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3910279
7 September 2010
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3835120
18 February 2010
DAPI Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3690334
11 February 2010
Drydock Exam · Internal Structural Exam · Examination of Repairs · COI Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3666712
8 July 2009
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3528219
7 July 2009
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3528202
17 February 2009
COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3415624
18 December 2008
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3380637
5 December 2008
Re-Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3372182
7 October 2008
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3335587
25 August 2008
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3302995
6 May 2008
Periodic Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3196584
1 February 2008
COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3134887
5 November 2007
Periodic Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3090448
14 September 2007
Re-Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3049648
27 July 2007
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3009367
8 June 2007
Periodic Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2952514
2 February 2007
Deficiency Check · Administrative Inspection · COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2865338
5 September 2006
Re-Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2763065
28 April 2006
MTSA Verification · Administrative Inspection · Re-Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2636215
17 January 2006
MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2565643
18 July 2005
COC-CVE Quarterly
Type not classified · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2431078
25 April 2005
Re-Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2342031
28 February 2005
Deficiency Check
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2300475
10 January 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2271768
21 May 2004
MTSA Verification · Internal Structural Exam · Hull Examination · Initial Certification · Initial Construction-Excluding Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2115123
Deficiency record · 115
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 April 2026
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter.
While underway, the vessel experienced a loss of propulsion and power to the port main engine. Vessel shall provide a technician's report attesting to the proper operation of the port engine and submit to the OCMI for review.
46 CFR 71.40-01
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 July 2025
Resolved
Each marine shipboard cable shall meet the requirements of IEEC, UL 1309 or IEC. Power cables for radars are UL E217996 extension cord for temporary installation.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 15 July 2025
Resolved
Each Class 3 WTD must be tested IAW ASTM F 1196 / 1197. Both WTD's have Low pressure/ Low level indicator lights illuminated and doors did not close when initiated from the bridge control panel.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 July 2025
Resolved
Each electrical connection must be made within an enclosure. Deck flood light splices were out in the open and taped, splice must be in an enclosure.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 July 2025
Resolved
There must be ground detection for ships power system. Two of the ground detector lamps on the emergency switchboard were burned out.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 July 2025
Resolved
Bulkheads of the “A” class shall be capable of preventing the passage of smoke and flame for 1 hour. Cable was improperly run through the Multi Cable Transit (Rox Blocks) between the CO2 room, generator room and emergency generator.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 15 July 2025
Resolved
Inspector not limited from making such inspections to be assured of the safety of the vessel. Bulbs for status of the bow thruster control panel on the bridge burnt out.
21JUL-Update below corrected. Bulbs above still outstanding.
Stbd SSDG oil psi gage for testing the low lube oil alarm/shutdown was inoperable.
04 - Emergency Systems › N/A - No Subsystem › Safe areas
Issued 15 July 2025
Resolved
Spaces protected by CO2 shall have warning signs. No warning sign posted the ECR door and E-GEN Space.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 18 January 2024
Resolved
The installation of all systems of an electrical engineering or interior communications nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of sub chapter J (Electrical Engineering) of this chapter. When the potential of the final emergency power source reaches 85 to 95 percent of normal value, the emergency loads under § 112.15–5 must transfer automatically to the final emergency power source and, on a passenger vessel, this transfer must be accomplished in no more than 45 seconds after failure of the normal source of power. MI found emergency generator to not start after power failure. Item 01 Cleared via
Tech Report today.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 6 December 2023
Resolved
The fire main system must be operated and the pressure checked at the most remote and highest outlets. MI found fire pump in E/R with water leaking from mechanical seal. Seal requires replacement.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 January 2023
Resolved
The respective piping systems installed on ships and barges shall have the necessary pumps, valves, regulation valves, safety valves, relief valves, flanges, fittings, pressure gages, strainers, liquid level indicators, thermometers, etc., for safe and efficient operation of the vessel. Port & Starboard sea chest strainers were excessively clogged with debris. Verify strainer condition on the forward sea chest as well.
Cite: 46 CFR 56.01-1(b)
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 9 June 2022
Resolved
The piping from the cylinders to the stop valves in the manifold shall be subjected to a pressure of 1,000 p.s.i. With no additional gas being introduced to the system, it shall be demonstrated that the leakage of the system is such as not to permit a pressure drop of more than 150 p.s.i. per minute for a 2-minute period. Upon inspection MI observed multiple loose hoses to CO2 bottle connections allowing un-threading by hand.
All piping, valves, and fittings of ferrous materials shall be protected inside and outside against corrosion unless specifically approved otherwise by the Commandant. Upon inspection MI observed 02 fouled engine room CO2 discharge orifices. Captain or Engineer is required to provide a written statement of witnessing the repairs of both noted deficiencies pertaining to the CO2 system, in addition to, providing the updated re-servicing report from a qualified servicing contractor.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 13 May 2022
Resolved
46 CFR 112.50-1(d) The generator set must be capable of carrying its full rated load within 45 seconds after cranking is started with the intake air, room ambient temperature, and starting equipment at O°C. The generator's prime mover must not have a starting aid to meet this requirement, except that a thermostatically-controlled electric water-jacket heater connected to the final emergency bus is permitted.
The EDG failed to come on line supplying power within the required time. It would not have come on either until it was found that the voltage regulator was left in the off position for possibly a day and a half of operations of the vessel. Deficiency corrected by placing the regulator in the Auto position.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 May 2022
Resolved
Currently the vessels bow thruster is not operational and has electrical issues. Prior to placing the vessel back into service make proper repairs/adjustments to the bow thruster and provide a detailed tech. report.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 25 January 2022
Resolved
There shall be no accumulation of oil which might create a fire hazard in the bilges of machinery spaces. Marine Inspector (MI) observed excess lube oil under Port and Starboard M/E and fuel oil under the Port Generator. Repair to satisfaction of attending MI. 46CFR71.25-45
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 January 2022
Resolved
Each feeder current for steering must be protected by a circuit breaker. MI observed Flanking/Steering Gear Pump #1 data plate states 150A, however 30A is currently utilized. Provide corrective action plan. 46CFR58.25-55(a)
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 25 January 2022
Resolved
Indication of the rudder angle must be provided both at the main steering station in the pilothouse and in the steering compartment. During steering test, the MI observed 4 degrees variance in indicators on Port and 3 degrees on starboard at hard over; 3 degrees at amidships. Repair to satisfaction of attending MI.
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 25 January 2022
Resolved
Each vessel must be provided with a sound-powered telephone system. Sound-powered telephone observed to be inoperable in multiple spaces onboard. Repair to satisfaction of attending MI. 46CFR58.25-15
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 25 January 2022
Resolved
Doors for 'A' Class bulkheads shall meet the requirements of 46CFR72.05-25(b). MI observed the 'A' self-closing door located between the ECR and the CO2 protected generator room (machinery space)unable to self close when the generators were running. 46CFR72.05-25(b)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 September 2021
Resolved
In the event of an accident to a boiler, unfired pressure vessel, or machinery tending to render the further use of the item unsafe until repairs are made, or if by ordinary wear such items become unsafe, a report shall be made by the chief engineer immediately to the Officer in Charge, Marine Inspection, or if at sea, immediately upon arrival at port. Vessel reported loss of Rudder.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 July 2021
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Vessel's port engine activated a hi exhaust temp alarm causing a reduction in RPM on that engine.
46CFR 58.10-5
A technician's report attesting to the cause, the corrective action (s) and proper operation will be required to clear 835.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 July 2021
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter.
Vessel port main engine had a reduction in RPM due to high temperature alarm.
A technician's report attesting to the cause and the corrective action (s) and proper operation will be required to clear 835.
46CFR58.10-5
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 May 2021
Resolved
46 CFR 71.40-1 - 60c
A survey, either general or partial, according to the
circumstances, shall be made every time an accident
occurs or a defect is discovered which affects the
safety of the vessel or the efficacy or completeness of
its lifesaving appliances, fire-fighting or other
equipment, or whenever any important repairs or renewals
are made. The survey shall be such as to insure that the
necessary repairs or renewals have been effectively
made, that the material and the workmanship of such
repairs or renewals are in all respects satisfactory,
and that the vessel complies in all respects with the
regulations in this subchapter.
While underway, vessel experienced loss of propulsion
and power to Port main engine. Vessel shall provide
certified technician's report attesting to proper
operation of port engine and marine inspector shall
witness power trials prior to carriage of passengers.
Vessel is authorized one time transit from Scarsdale
Ferry Landing to Belle Chasse Ferry landing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 October 2020
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules. The vessel reportedly has a sheared starboard shaft. This must be corrected prior to carrying passengers. Provide a written root cause analysis for th shaft breakage, and proposal to check to port shaft for similar deficiencies. 46 CFR 58.05-1
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 October 2020
Resolved
The owner, agent, master, operator, or person in charge must, within 5 days, file a written report of any marine casualty required to be reported under 46 CFR 4.05-1. The relevant parties failed to report the marine casualty of shearing the starboard shaft of the Plaquemines pride. The relevant parties must submit the required CG-2692 form to the Coast Guard immediately. 46 CFR 4.05-10
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 14 October 2020
Resolved
In general, at least three reinspections shall be made on each vessel within one year. These reinspections will be made at approximately equal intervals between annual inspections.
Due to extended Drydock and Shipyard period, vessel missed a quarterly exam, and the annual expires on 14 Feb 2021.
Prior to the carriage of passengers and entering ferry service, the vessel must complete its annual inspection. Coordinate COI attendance through the cognizant OCMI.
46 CFR 71.30-1
46 CFR 71.01-10(b)
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 1 October 2020
Resolved
The Bridge-to-Bridge Act and the regulations of this part apply to the following vessels in the navigable waters of the United States:Every power-driven vessel of 20 meters or over in length while navigating. Vessel did not provide bridge to bridge certification. Bridge to Bridge certification must be provided to the satisfaction of attending Coast Guard Marine Inspector.
47 cfr 80.1001
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 14 August 2020
Resolved
No means shall be provided for locking doors giving access to either of the 2 required means of escape, except that crash doors or locking devices, capable of being easily forced in an emergency, may be employed provided a permanent and conspicuous notice to this effect is attached to both sides of the door. This paragraph shall not apply to outside doors to deckhouses where such doors are locked by key only and such key is under the control of one of the vessel's officers. Quick acting watertight door in engineering control room going into aft engine-room has padlock ring. Padlock ring must be removed to the satisfaction of Coast Guard Marine Inspector.
46 cfr 72.10-20
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 17 December 2019
Resolved
Vessel reported loss of steering due to broken components. The main steering gear and rudder stock must be of adequate strength for and capable of steering the vessel at maximum ahead service speed, which must be demonstrated to the cognizant Officer in Charge, Marine Inspection.
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 19 October 2018
Resolved
Instructions for operating emergency steering gear on the main control station has the wrong pump number preventing the steering system to work properly in emergency mode in the case of a loss of steering. Procure new Emergency Steering Procedure placard with the correct steering pump number.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 19 October 2018
Resolved
Hydraulic line fitting for watertight door going forward above the class 3 watertight door on the engine room has a small leak. Complete the necessary repairs to correct the leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 October 2018
Resolved
A Small leak was found on coupling above the fuel tank for the emergency generator. Due to the leak there is fuel and grime residue on top of the tank. Correct leak on coupling and clean area affected by the leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 October 2018
Resolved
A Jacket Water leak is present on the elbow going from the head to the exhaust manifold on the starboard generator. Complete the needed repairs to correct the deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 October 2018
Resolved
Class 3 watertight door open close labeling leading to the thruster room is peeling off the bulkhead. Replace label to ensure proper instructions are provided for the operation of the door.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 24 July 2018
Resolved
Escape hatch located in bow thruster room frozen in place.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 July 2018
Resolved
Fire station #3 hose found leaking. Repair.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 24 July 2018
Resolved
Lines of lifebuoys found excessively fraying. Replace.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 24 July 2018
Resolved
Replace rotted cable leading to junction box on rescue boat.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 26 January 2018
Resolved
Replace stbd navigation side light, found casing to be fractured with watrer ingress. Limited to daytime operation in good visibility until fixed.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 14 December 2017
Resolved
Currently, both sliding watertight doors are only operable from the local hand pump. O/O shall repair the remote and local electric opening mechanisms for both class 3 WT doors prior to issuance of the COI
Engineering › Steering Gear System › Rudder Stock
Issued 14 February 2017
Resolved
Provide NDT report of flanking rudder and main rudder arms where it connects to rudder post to determine if any stress cracks may exit. Providerepair proposal to any areas of concern from report provided. To the satisfaction of the attending Marine inspectoir.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 24 September 2011
Resolved
Due to port engine failure, vessel rep to provide tech or divers report to USCG to determine cause of problem.
Stability › Watertight Integrity › General
Issued 7 September 2010
Resolved
Make operable both sliding watertight doors.
Stability › Watertight Integrity › General
Issued 7 September 2010
Resolved
Adjust Engine Room to Control Room watertight door to make watertight.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 11 February 2010
Resolved
Develope and submit to the OCMI or MSC Automation Test Procedures in accordancewith 46 CFR 62.
Engineering › Thrusters › Motor
Issued 11 February 2010
Resolved
Make repairs to the Bow Thruster/Fire Monitor motor and demonstrate proper operation of both to the attending Marine Inspector.
Engineering › Generator (propulsion/auxiliary-electric) › Auto Transformer Circuitry
Issued 11 February 2010
Resolved
Make operable the emergency generator to assume the electrical load automatically.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 11 February 2010
Resolved
Replace all main deck fire doors.
Engineering › Fuel Oil Service System › Hose
Issued 11 February 2010
Resolved
Replace the Emergency Generator fuel supply hose.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Tanks
Issued 11 February 2010
Resolved
Replace the flexible hose on the fixed CO2 storage bottle near the time delay bottles.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 11 February 2010
Resolved
Renew batteries for the emergency lights in the EDG Room and the passenger space.
Stability › Watertight Integrity › General
Issued 11 February 2010
Resolved
Adjust Control Room door to make watertight.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 25 August 2008
Resolved
Clean and monitor generator exhaust leak
Engineering › Freshwater System (jacketwater cooling) › Fitting
Issued 25 August 2008
Resolved
Provide a means of protection or guard for all engine room and generator room expansion and cooling water tank site glasses.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 25 August 2008
Resolved
Replace worn line on all liferings.
Lifesaving › Lifebuoys › Stowage
Issued 25 August 2008
Resolved
Relabel the forward and bow lifebuoys.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 25 August 2008
Resolved
Prove operation of stabd aft most self-igniting light.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 25 August 2008
Resolved
Provide a new latch for the aft starboard container and provide a means of seperation for childrens lifejackets.
Engineering › Freshwater System (piston cooling) › Containment
Issued 6 May 2008
Resolved
Repair leaks in both stbd cooling water day tanks in engine room.
Engineering › Diesel Engine (propulsion-direct drive) › Bedplate
Issued 6 May 2008
Resolved
Remove excessive oil from under both MDE's
Engineering › Fuel Oil Storage/Transfer System › Pump
Issued 6 May 2008
Resolved
Remove oil from f/o transfer station sump in engine rm.
Communications › Alarms/Indicators › Propeller Revolutions Rate Indicator
Issued 6 May 2008
Resolved
Repair/Replace shaft tachometer on starboard operating station.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 1 February 2008
Resolved
Stbd aft lifejacket box - NLT 15FEB08, ensure box is properly marked with # of child-size lifejackets and contains no standing water.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 1 February 2008
Resolved
NLT 15FEB08, fix leaking pipe on port aft cooling water day tank.
Engineering › Diesel Engine (propulsion-direct drive) › Valve
Issued 1 February 2008
Resolved
NLT 15FEB08, replace busted inboard temp gauge on stbd aft engine.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 1 February 2008
Resolved
NLT 15FEB08, fix exhaust leak on stbd aft engine.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 1 February 2008
Resolved
NLT 15FEB08, ensure proper donning instructions for BOTH types of lifejackets are posted.
Engineering › Diesel Engine (propulsion-direct drive) › Valve
Issued 1 February 2008
Resolved
NLT 15FEB08, replace busted outboard temp gauge on port aft engine.
Construction/Loadline › Hull › Weld
Issued 5 November 2007
Resolved
Repair proposal for fuel oil leak in #5 stbd FO tank. Leak appears in tunnel between E/R and bow thruster room by fire station.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 5 November 2007
Resolved
Prove proper operation of stbd aft life buoy light.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Valve
Issued 5 November 2007
Resolved
No signage at reach rod for emergency generator fuel shut off. Requires remote location to be labelled and direction to open and close.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 5 November 2007
Resolved
Emergency light in galley inop. Prove proper operation.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 5 November 2007
Resolved
Place donning instructions on stbd aft life jacket box.
Documentation › Markings/Placards › Warning Signs
Issued 5 November 2007
Resolved
Lights at watertight doors between E/R and bow thruster to be labelled.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 14 September 2007
Resolved
2. To be completed prior to 21SEP07, Install electrical box cover on bridge stbd side aft.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 14 September 2007
Resolved
3. To be completed prior to 21SEP07, Check and correct all panel boxes to make sure the Directory cards include all Amp ratings.
Engineering › Freshwater System (jacketwater cooling) › Fitting
Issued 14 September 2007
Resolved
4. To be completed prior to 21SEP07, Repair the port main engine expansion tank leak, currently fitting leaking JW from the main engine.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 14 September 2007
Resolved
5. To be completed prior to 21SEP07, Investigate and repair exhaust leaks on port and stbd main engines. Currently the smell of exhaust and the black sooting of the insulation indicates leaks.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 14 September 2007
Resolved
6. To be completed prior to 21SEP07, Investigate and repair the High exhaust temp. warnings for both main engines. They can be re-set but do occur again.
Accommodation/Occupational Safety › Ventilation › General
Issued 14 September 2007
Resolved
7. To be completed prior to 21SEP07, Repair/Replace the generator room exhaust fan. Currently Inop.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 14 September 2007
Resolved
8. To be completed prior to 21SEP07, Replace ring buoy line on stbd side bow.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 27 July 2007
Resolved
Submit satisfactory servicing report of fixed CO2 system.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 2 February 2007
Resolved
Clean the bilge in the bow thruster room.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 2 February 2007
Resolved
Re-install protective grill to port generator's engine.
Fire Fighting › Fire Pumps › Pressure
Issued 2 February 2007
Resolved
Repair main fire pump located in engine room.
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 2 February 2007
Resolved
Repack/tighten port and starboard shaft stuffing boxes to cease excessive leaks.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 2 February 2007
Resolved
Repair stbd aft and port superstructure buoy lights.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 2 February 2007
Resolved
Properly label stbd aft lifejacket box.
Documentation › Markings/Placards › Lifejacket Placard
Issued 2 February 2007
Resolved
Afix to all lifejacket boxes the lifejacket donning placard.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 2 February 2007
Resolved
Re-stencil as necessary all liferings and axes.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 2 February 2007
Resolved
Remove excess water from bilge in rudder room.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 17 January 2006
Resolved
Prior to carrying passengers provide CO2 servicing certificates.
Communications › Alarms/Indicators › Lube Oil Level Alarm
Issued 17 January 2006
Resolved
Prior to carrying passengers complete all machinery safety shutdowns.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 17 January 2006
Resolved
Prior to carrying passengers complete a COI inspection.
Engineering › Non-conventional Propulsion/Steering › Hydraulic Steering Cylinder (jet)
Issued 17 January 2006
Resolved
Prove proper operation of bow thruster.
Communications › Alarms/Indicators › Propeller Revolutions Rate Indicator
Issued 21 May 2004
Resolved
Install shaft tachometers at all operating stations
Stability › Watertight Integrity › General
Issued 21 May 2004
Resolved
Install longer handles on all escape hatches to main deck to permit easier operation.
Stability › Watertight Integrity › General
Issued 21 May 2004
Resolved
Lable direction for opening escape hatches to main deck.
Electrical › Electric Supply System (service) › Battery Charger
Issued 21 May 2004
Resolved
Install drip shields over all battery chargers.
Construction/Loadline › Structures › Deck Plating
Issued 21 May 2004
Resolved
Install missing bolts on all soft patches.
Accommodation/Occupational Safety › Potable Water System › General
Issued 21 May 2004
Resolved
Install drain line on hot water heater relief valve.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 21 May 2004
Resolved
Provide non-conductive mat for switch board.
Engineering › Reduction Gearing/Clutches › Shaft
Issued 21 May 2004
Resolved
Install guard over sending units IWO port & starboard reduction gears.
Lifesaving › Rescue Boat › Construction
Issued 21 May 2004
Resolved
Provide to [name withheld] approval letter for rescue boat and davit.
Construction/Loadline › Hull › Bottom Plating
Issued 21 May 2004
Resolved
Provide Clear Technical Letter from ABS stating that all plan review issues hav e been resolved.
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 21 May 2004
Resolved
Provide approved automation test procedure and FEMA and demonstrate same.
Lifesaving › Lifefloat › Not on Board
Issued 21 May 2004
Resolved
Provide for life folats: paddles, water lights, sea painters, and weak links.
Documentation › Markings/Placards › Garbage Placard
Issued 21 May 2004
Resolved
Provide garbage placard & waste management plan.
Communications › Radio Communications › VHF Radiotelephone
Issued 21 May 2004
Resolved
Provide emergency broadcast placard.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 21 May 2004
Resolved
Post piping diagrams IWO bilge, ballast, fire main, and fuel oil transfer manifolds.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 21 May 2004
Resolved
Provide letter from ABS dropping class.
Construction/Loadline › Hull › Bottom Plating
Issued 21 May 2004
Resolved
Provide to Marine Safety Office New Orleans a complete set of drawings identical to those submitted to the Marine Safety Center via the Electronic Commerce Program IAW MSC Technical Note 01-98 dated 6/24/98.
Operations/Management › Drills/Instruction › Not Conducted
Issued 21 May 2004
Resolved
Conduct fire, man overboard, and security drills in the presence of and to the satisfaction of the attending CG Marine Inspector.
Deck/Cargo › Mooring/Anchoring › Anchor Chain (general)
Issued 21 May 2004
Resolved
Provide additional chain for anchor to increase scope and prove anchor can hold vessel fast.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 21 May 2004
Resolved
Properly label the adult and child-size personal floatation devices (PFD) storage lockers in accordance with 46 CFR 199.70 (b)(2)(iii).
Casualty record · 7
15 May 2011Routine · role: Involved in a Marine Casualty · activity 4012301
16 June 2011Routine · role: Involved in a Marine Casualty · activity 4047611
11 November 2013Routine · role: Involved in a Marine Casualty · activity 4752092
7 January 2014Routine · role: Involved in a Marine Casualty · activity 4780073
5 February 2014Routine · role: Involved in a Marine Casualty · activity 4795454
16 February 2014Routine · role: Involved in a Marine Casualty · activity 4802619
11 May 2014Routine · role: Involved in a Marine Casualty · activity 4856437
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.