MAURY USCG vessel records
← All vessels

HALLE H

Built
1957
Last inspected
23 April 2025
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Inspection record

Last inspected 23 April 2025
…with no type recorded3
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2003–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDF5275
Flag
UNITED STATES
Maury page id
psix-72580

Documentation record

Registered dimensions (L × B × D)44.7 ft × 17.0 ft × 5.8 ft
Registered tonnagegross 37 / net 25
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGUNDERSON BROS ENGINEER · PORTLAND, OR, UNITED STATES · built 1957
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portKETCHIKAN, AK
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 9 June 2026 · expires 31 July 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it37 - Regulatory (Subpart C or D), Gross Ton
25 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 18 inspections, each with its date, unit and type; 12 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 1 other vessel inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

KP-1 Freight Barge · MISLE 176337 · 13 July 2011 · activity 4133204

Inspection history · 18

23 April 2025 Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8114023
24 March 2025 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8098910
25 March 2024 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7876481
22 May 2023 Annual Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7695084
29 April 2022 Initial Certification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7421153
23 February 2022 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7401062
18 February 2022 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7398539
25 October 2021 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7339369
14 September 2021 Uninspected Other · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7312078
27 July 2021 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7269799
4 February 2014 Industry Initiated Exam · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4802106
17 May 2012 Administration
Administrative · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 4314332
13 July 2011 Type not recorded
No type recorded · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4133204
19 January 2011 Industry Initiated Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3930591
20 December 2007 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3119017
16 October 2007 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3083154
29 December 2006 MTSA Verification
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2846704
2 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1957774

Deficiency record · 12

09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 May 2023 Resolved
If twist-on types of connectors are used, the connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening due to vibration. Dead-end wires in way of #1 MDE incorrectly terminated and capped with twist-on connectors outside of an enclosure 46CFR143.575(a)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2023
Resolved 25 May 2023
Resolution: Twist-on connectors replaced with heat-shrink butt connectors
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 May 2023 Resolved
Closure devices must be provided for deckhouse penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. Wiring penetrations to port aft of pilot house not made weathertight. 46CFR144.320(b)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2023
Resolved 25 May 2023
Resolution: Penetration made weather tight.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 22 May 2023 Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. No more than four conductors shall be secured to anyone terminal stud. If additional connections are necessary, two or more terminal studs shall be connected together by means of jumpers or copper straps. 10 conductors were secured to individual battery terminal studs. 46CFR143.400(a) ABYC E.9.16.k(10)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2023
Resolved 25 May 2023
Resolution: Connections to battery stud reduced to 4 connectors.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 29 April 2022 Resolved
A survey must include a visual examination of the systems used in support of drills or training to determine that the equipment utilized during a drill operates as intended. Drills were not conducted because assigned crewmembers were not present for inspection. 46 CFR 137.215(b)(3)
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 29 April 2022
Resolved 6 June 2022
Resolution: Drills were conducted in the presence of the attending marine inspector
08 - Alarms › N/A - No Subsystem › General alarm
Issued 29 April 2022 Resolved
Each towing vessel must be fitted with a general alarm that is capable of notifying persons in any accommodation, work space, and the engine room. General alarm did not work at the time of inspection. 46 CFR 143.235(b)(2)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2022
Resolved 6 June 2022
Resolution: General Alarm was heard/seen in the engine room without ship's generator (battery)
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Lighting (Working spaces)
Issued 29 April 2022 Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting was not provided in all crew working and living areas. 46 CFR 143.410(b)(2)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2022
Resolved 6 June 2022
Resolution: Emergency lighting fixed in engine room and photoluminescent strips were added to doors in berthing areas.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 April 2022 Resolved
Electrical connections must be suitably installed to prevent them from coming loose through vibration or accidental contact. Compressor for air receivers (used for steering system) is loosely attached to a receptacle and easily disconnected. 46 CFR 143.400(e)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2022
Resolved 6 June 2022
Resolution: Compressor motor in engine room hard wired through a junction box.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 29 April 2022 Resolved
Each towing vessel must provide gauges for main engine RPM and auxiliary generator engine RPM. Main engines and generators are missing RPM gauges. 46 CFR 143.230(c)(1) & (3)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2022
Resolved 6 June 2022
Resolution: RPM gauges now provided in machinery space for generators and main propulsion engines
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 April 2022 Resolved
All pressure vessels must have the MAWP indicated by a stamp, nameplate, or other means visible to the crew. Air receivers are missing visible MAWP marking. 46 CFR 143.300(c)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2022
Resolved 6 June 2022
Resolution: Pressure vessels marked with MAWP.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 April 2022 Resolved
Paints, coatings, or other flammable or combustible products onboard a towing vessel must be stored in a designated storage room or cabinet (meeting UL 1275, FM Approvals Standard 6050, or equivalent) when not in use. Vessel does not have a designated cabinet for storing flammable or combustible products onboard. 46 CFR 142.225
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2022
Resolved 6 June 2022
Resolution: Dedicated space was provided for flammable combustible stores.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 25 October 2021 Resolved
All owners and operators of an existing towing vessel must have a valid COI prior to the specified phase-in period. This vessel has not recieved a COI IAW with regulations.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 25 October 2021
Resolved 23 February 2022
Resolution: Def incorrectly issued. Vsl was operating in SEC Anchorage's AOR under worksite exemption during timeframe.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 27 July 2021 Resolved
All owners and operators of an existing towing vessel must have a valid COI prior to the specified phase-in period. This vessel is one of the associated fleet that has not obtained a valid COI. The vessel shall be made available for a Coast Guard COI inspection within 90 days. If an inspection is not completed prior to this date, the action for this deficiency shall be changed to a 60 (Rectify deficiencies prior to movement) and the vessel may no long be permitted to operate.
Condition: Invalid
Action required: 705 - Other - as specified
Due 25 October 2021
Resolved 25 October 2021
Resolution: Closing def since Code 60c replaced it.

Ownership record