Records from 2003 to 2018. Most recent: inspection, 21 June 2018.
Inspection history · 24
21 June 2018
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6451757
14 August 2017
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6240289
5 October 2016
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6016532
4 March 2016
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5827093
26 August 2015
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5226341
27 August 2014
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4966112
26 September 2013
Examination of Repairs · Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4723505
23 September 2013
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4722072
23 September 2013
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4758712
23 July 2013
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4660946
19 June 2013
Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4624229
10 September 2012
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4436994
30 September 2011
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4157386
29 July 2010
Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3809307
24 July 2009
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3544713
31 July 2008
COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3284843
23 May 2008
Hull Examination · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3214357
19 February 2007
Internal Structural Exam · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2874126
16 February 2006
Re-Inspection · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2586460
10 August 2005
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2458471
24 February 2005
Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2298602
23 September 2004
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2203298
22 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1973351
4 December 2003
Hull Examination · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1958709
Stability › Intact Stability (when using lifting gear) › General
Issued 14 August 2017
Resolved
Prove compliance with stability requirements in 46 CFR Subchapter S
Action required: 705 - Other - as specified
Due 14 August 2017
Resolved 7 July 2026
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 August 2014
Resolved
Vessel was using an extension cord and a powerstrip in house of vessel.
Due 27 August 2014
Resolved 27 August 2014
Resolution: Corrected on Spot
Lifesaving › Lifebuoys › Serviceable
Issued 27 August 2014
Resolved
2 Lifebouys on board were found unservicable.
Due 27 August 2014
Resolved 27 August 2014
Resolution: Old ones removed and replaced with new ones.
Construction/Loadline › Hull › Bottom Plating
Issued 23 September 2013
Resolved
MAKE PERMANENT REPAIRS TO THE DAMAGE ON THE BOW RAKE DUE TO ALLISION TO THE SATISFACTION OF THE ATTENDING U.S. COAST GUARD MARINE INSPECTOR. Prior to departure from Allied shipyard to the satisfaction of the cognizant OCMI.
Action required: 705 - Other - as specified
Resolved 14 August 2017
Resolution: Repairs made and inspected by activity #4723505, but not resolved. Visually inspected outer plating and voids, all sat.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 23 July 2013
Resolved
Pressure relief valve not tested
Due 23 July 2013
Resolved 23 July 2013
Resolution: Replaced relilef valve
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 23 July 2013
Resolved
Port side life ring water light housing was cracked.
Due 23 July 2013
Resolved 23 July 2013
Resolution: replaced water light
Lifesaving › Lifebuoys › Serviceable
Issued 23 July 2013
Resolved
STBD side life buoy was not serviceable.
Due 23 July 2013
Resolved 23 July 2013
Resolution: replaced lifebuoy
Lifesaving › Lifebuoys › Serviceable
Issued 23 July 2013
Resolved
Port side lifebuoy was not serviceable
Due 23 July 2013
Resolved 23 July 2013
Resolution: replaced lifebuoy
Electrical › Electric Supply System (service) › Battery Installation
Issued 30 September 2011
Resolved
Generator battery missing protective box and cover.
Action required: 705 - Other - as specified
Due 7 October 2011
Resolved 1 October 2011
Resolution: Generator battery installed with protective box and cover.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 31 July 2008
Resolved
Face plate not seated correctly due to over stuffed box.
Action required: 705 - Other - as specified
Resolved 31 July 2008
Resolution: Electrician opened box and properly seated receptacle and replaced cover.
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 31 July 2008
Resolved
Diesel tank had drain outlet with no plug.
Action required: 705 - Other - as specified
Resolved 31 July 2008
Resolution: Threaded plug put into the end of the fitting.
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 31 July 2008
Resolved
Vessel has two (2) independent tanks mounted on the forward deck. These tanks do not meet 46CFR32.60-30 in that they are mounted on deck boards, which does not allow 15 inches of clearance to provide inspection of the bottom of the tank, and the tanks are secured to the deck with four (4) bolts instead of a supported saddle or foundation.
Action required: 705 - Other - as specified
Due 6 November 2008
Resolved 29 July 2010
Resolution: Independant Tank modification (addition of support foundation) has been approved by Local OCMI.
Construction/Loadline › Hull › Hull Plating
Issued 23 May 2008
Resolved
Provide PE report analysis as per 46 CFr 31.10-21a.
Due 22 October 2008
Resolved 25 September 2008
Resolution: PE report provided from 30 yr midbody gaugings and scanned into documents section.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 23 September 2004
Resolved
Lights attached to end of lifering line. Provide separate line with a clip to attach to lifering.
Condition: Improper Installation
Due 23 September 2004
Resolved 23 September 2004
Electrical › Electric Generation Source (service) › Ground Detection
Issued 4 December 2003
Resolved
Resolve issues with Generator in order to get MSC to approve vsl system.
Due 9 January 2004
Resolved 9 January 2004
Resolution: Resolved all issues and recieved approval letter for system
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 4 December 2003
Resolved
Vessel name needs to be changed with vessel documentation center in Falling Waters, WV
Due 23 March 2004
Resolved 24 February 2005
Resolution: Verified
Deck/Cargo › Cargo Heating
Issued 4 December 2003
Resolved
Missing approval letter for TFH test procedures.
Due 4 December 2003
Resolved 4 December 2003
Resolution: Provided approval letter for test procedures and witnessed sat test of system.