Records from 2005 to 2025. Most recent: inspection, 11 July 2025.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJEFFBOAT LLC · JEFFERSONVILLE, IN, UNITED STATES · built 2005
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 February 2026 · expires 31 March 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Gross Ton
735 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 36
11 July 2025
COI Inspection · Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8183190
14 April 2025
Bulk Liquid Transfer Monitor
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8111667
2 October 2024
Examination of Repairs
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8013082
28 August 2024
Damage Survey
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7992061
9 October 2020
Administrative Inspection · COI Inspection · Internal Structural Exam · MTSA Verification · Cargo Tank Internal · Drydock Exam · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7074553
5 September 2019
USCG Audit · Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6805475
16 November 2018
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6582173
16 November 2018
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6584440
25 October 2018
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6579681
3 November 2017
Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6300400
11 April 2017
Deficiency Check · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6121241
2 February 2017
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6082321
30 August 2016
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5995865
5 August 2016
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5963449
17 September 2015
MTSA Verification · Examination of Repairs · COI Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5721868
14 January 2015
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5053190
2 January 2015
Load Line/Change of Employment
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5046734
5 December 2014
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5056664
17 September 2013
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4742716
21 September 2012
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4446772
20 February 2012
Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4257871
4 January 2012
Administrative Inspection
Administrative · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4218210
29 November 2010
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3900298
22 November 2010
Internal Structural Exam · MTSA Verification · Drydock Exam · Cargo Tank Internal · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3896145
30 August 2010
Administrative Inspection
Administrative · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3837917
19 April 2010
MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3717000
20 August 2009
Deficiency Check · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3556379
29 July 2009
Type not recorded
No type recorded · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3550034
29 July 2009
Damage Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3550036
29 April 2009
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3463600
8 July 2008
Periodic Inspection · MTSA Verification · Administrative Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3254636
3 July 2007
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2974886
30 June 2006
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2696133
15 May 2006
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2649891
27 April 2005
Internal Structural Exam · MTSA Verification · Initial Certification · Cargo Tank Internal · Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2343889
9 February 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2289455
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 16 November 2018
Resolved
5 In Hole, located 2 feet below the deck. 3 feet aft of the head log, on the port side. (Rake bottom)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 November 2018
Resolution: Visual Inspection and Air testing conducted
Construction/Loadline › Hull › Hull Plating
Issued 2 February 2017
Resolved
Vessel is authorized to offload the cargo that is on board. Prior to taking on cargo repairs shall be made to the #4 and #5 port voids to the satisfaction of the attending USCG attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2017
Resolution: Conducted satisfactory air tests at 1.5 psi, of the following repairs: 25-ft side insert from knuckle to gunwale on Port side between #4 and #5 wing voids. Test sat
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 22 November 2010
Resolved
Install P/V valve for CG inspection on VCS prior to conducting any cargo operations.
Due 22 December 2010
Resolved 28 November 2010
Resolution: Received an email from the vsl rep with pictures of the barge, the installed P/V valve, and the P/V valve data plate. Also received the shop order and test report for the P/V valve from the vsl rep.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 29 July 2009
Resolved
Repair damage to vapor lines and PV valves to the satisfaction of the attending marine inspector prior to carriage of cargo. Piping and valves damaged during allision passing under bridge ripping vents off piping
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 August 2009
Resolution: Observed satisfactory air test of the following at a pressure of 3 psi: 1) Approx. 8'''' of new pipeline where the pipeline connects to the pressure/vacuum valve, 2) Approx. 4'''' of new pipeline where the pipeline connects to the stack, 3) The new stack.