MAURY USCG vessel records Sign in
← All vessels

ELKA SIRIUS

ELKA SIRIUS is a 2003 tank ship. The Coast Guard has recorded 33 inspections since 2004, most recently in September 2020, along with 24 deficiencies and 6 operational controls.

Records from 2004 to 2020. Most recent: inspection, 21 September 2020.

Built
2003
Last inspected
21 September 2020
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9234513 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
730654
Flag
LIBERIA
—
Maury page id
psix-730654

Inspections, by type

…with no type recorded9
Years with a record 11 calendar years (2004–2020)
The 33 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 6 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it30770 - Convention (Subpart B), Gross Ton
11067 - Convention (Subpart B), Net Ton
57856 - Displacement, Ton
45467 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 33

21 September 2020 Ballast Water Examination · COC-CHEM & TVE Renew · PSC B
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7062118
17 November 2019 PII Safety Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6855773
30 August 2019 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6798810
28 August 2019 ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Annual · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6792550
10 February 2019 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6623223
7 January 2019 COE-Administrative
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6606309
9 December 2018 COE-Administrative
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6594099
9 August 2018 Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6505800
9 August 2018 Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6505863
9 August 2018 COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6505983
19 January 2017 COE-Dockside
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6073320
26 September 2016 ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6007152
30 July 2016 COE-Dockside
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5957473
18 February 2016 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5817456
11 February 2016 PI Safety Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5813947
8 February 2016 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5811306
18 September 2015 ISPS II Exam · PII Safety Exam
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 5722383
11 August 2015 COE-Dockside
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5213244
13 July 2015 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5183258
25 February 2012 COC-CHEM Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4250887
5 April 2007 COC-CHEM Renew
Type not classified · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2902463
5 July 2006 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2702672
13 June 2006 MARPOL Annex V Examination · COC-CHEM Annual · MARPOL Annex II Examination · ISPS II Exam · MARPOL Annex I Examination · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2678173
3 June 2005 MARPOL Annex V Examination · Random ISPS/MTSA/PSC · MARPOL Annex I Examination · Ballast Water Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2377346
4 March 2005 Ballast Water Examination · PII Safety Exam · MARPOL Annex I Examination · MARPOL Annex V Examination · ISPS III Exam · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2302973
10 February 2005 Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2290223
1 February 2005 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2366757
26 January 2005 Random ISPS/MTSA/PSC
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2280315
23 December 2004 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2263931
11 December 2004 Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2255713
1 December 2004 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2251610
27 November 2004 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2254040
26 November 2004 ISPS II Exam · COC-TVE Renew
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2248169

Deficiency record · 24

07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 28 August 2019 Resolved
The inert gas system shall be capable of delivering inert gas with an oxygen content of not more than 5% by volume in the inert gas supply main to the cargo tanks at any required rate of flow. PSCO observed crew unable to calibrate the oxygen sensor. Crew did not follow SMS procedures for calibration of the oxygen sensor, and was unfamiliar with proper calibration. IGG was unable to operate continuously, system shut down multiple times during operation. PSCO unable to verify proper operation of the IGG. 74 SOLAS (2001) II-2/62.3.2
Action required: 30 - Ship detained
Due 28 August 2019
Resolved 6 September 2019
Resolution: Received class report. PSCO verified crew calibration with approved ISM procedures, IGG running satisfactorily and tested for 02 content below 5%.
12 - Dangerous Goods › N/A - No Subsystem › Fire protection cargo deck area
Issued 28 August 2019 Resolved
Where cables which are installed in hazardous areas introduce the risk of fire or explosion in the event of an electrical fault in such areas, special precautions against such risks shall be taken to the satisfaction of the Administration. All electrical lines, piping, and fittings of the tank gauging system, installed on deck, were found with soft patches, flex piping, and exposed wires throughout the system. All electrical connections to the pressure sensors installed on the cargo lines at the tank top are sealed with silicone and loose. Electrical cable line found with soft patches, broken bonding, and loose connections on expansion joints throughout the system. Emergency lighting forward of accommodation found with loose wiring connections. 74 SOLAS (2004) II-1 / 45.5.4
Action required: 30 - Ship detained
Due 28 August 2019
Resolved 6 September 2019
Resolution: Received revised class report stating that the remaining electrical hazards were rectified, PSCO verified repairs onboard.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 28 August 2019 Resolved
The fire resistance of doors shall, as far as practicable, be equivalent to that of the division in which they are fitted. Doors and door frames in “A“ class divisions shall be constructed of steel. Doors fitted in boundary bulkheads of machinery spaces of category A shall be reasonably gastight and self-closing. The following “A” class fire doors were found with gaps in the framing, holes, and missing latches or locks: Both fire doors leading to Engine Control Room, Door leading from engine room to Steering Gear Room, Door leading from “A” deck to engine room, Door from “A” deck to Foam Station, Door from “A” deck to electrical equipment room, Door from “A” deck to cargo valve control room, Door from “A” deck to the stairway. 74 SOLAS (2001) II-2/47
Action required: 30 - Ship detained
Due 28 August 2019
Resolved 6 September 2019
Resolution: All doors listed were fitted with welded peices of steel to seal the air gap that existed previously. All doors tested and examined satisfactorily.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 28 August 2019 Resolved
Objective evidence discovered in an expanded ISM exam revealed the following major non-conformity; the vessel failed to fully implement the requirements of the SMS as evident by def. #01, #02, and #03. An external audit is required. 74 SOLAS (2014)IX/3&5, ISM Code 10 ISM Code 10
Action required: 30 - Ship detained
Due 28 August 2019
Resolved 6 September 2019
Resolution: ISM Audit conducted by ABS, found multiple non conformities and issued CARs to be rectified by specified date. See class report attached to document section of activity.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 28 August 2019 Resolved
All access openings in bulkheads at ends of enclosed superstructures shall be fitted with doors of steel or other equivalent material, permanently and strongly attached to bulkheads and framed, stiffened and fitted so that the whole structure is of equivalent strength to the unpierced bulkhead and weathertight when closed. Port side door leading to Accommodation from outside the ship on “B” deck was found with broken latch and would not close. ICLL 66/88 Annex 1/12(1)
Action required: 17 - Rectify deficiencies prior to departure
Due 28 August 2019
Resolved 6 September 2019
Resolution: Door was fitted with new steel, latch, and hardware. Door now works as designed and creates a seal.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 28 August 2019 Resolved
Ships shall be maintained in compliance with mechanical requirements of a classification society which is recognized by the Administration in accordance with the provisions of regulation XI/1, or with applicable national standards of the Administration which provide an equivalent level of safety. Hydraulic operated isolation valve on cargo line, leading from cargo tank two port, found with a significant hydraulic leak. 74 SOLAS (2004)II-1/3-1
Action required: 17 - Rectify deficiencies prior to departure
Due 28 August 2019
Resolved 6 September 2019
Resolution: Valve tested satisfactory by remote operation, no leaks whitnessed.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 28 August 2019 Resolved
After any survey of the ship under paragraph 1 of this regulation has been completed, no change shall be made in the structure, equipment, systems, fitting, arrangements, or material covered by the survey, without the sanction of the Administration, except the direct replacement of such equipment and fittings. ODME and Annex II line, overboard discharge valves, found without indication devices. MARPOL Annex I 6.4.2 MARPOL Annex II 8.3.2
Action required: 17 - Rectify deficiencies prior to departure
Due 28 August 2019
Resolved 6 September 2019
Resolution: New indicators fitted to valves to show valve position.
Operations/Management › Port and Waterways Safety › Notice of Arrival, General
Issued 13 June 2006 Resolved
Vsl is to submitt a revised NOA to incoroate the fillowing errrors: misspelled name for Master, embarkation date for electrician, missing passport number for 2nd engineer and passport number for oiler [name withheld])
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 June 2006
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 13 June 2006 Resolved
Repair soft patched piping and leaking packing gland IWO oily wtaer seperator flushing piping (located at bottom portion of unit).
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 July 2006
Resolved 5 July 2006
Resolution: ABS class report# CR724204
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 13 June 2006 Resolved
Repair leaking (wasted gasket on flange/valve) steam piping, IWO boiler piping located in engineroom.
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 July 2006
Resolved 5 July 2006
Resolution: ABS class report# CR724204
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 13 June 2006 Resolved
Repair leaking manifold flange (leaking gasoline cargo). IWO #4 stbd cargo piping.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 13 June 2006
Resolved 13 June 2006
Resolution: Corrected on the spot. Valve found not to be completely closed and blank not fitted securely.
Construction/Loadline › Markings › Load Line Mark
Issued 13 June 2006 Resolved
Repaint worn loadline markings portside.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 13 July 2006
Resolved 5 July 2006
Resolution: ABS class report# CR724204
Deck/Cargo › Cargo Stowage › General
Issued 13 June 2006 Resolved
Vessels cargo sample locker (located on main deck stbd side mid-ship) is not listed (designated) on ships plans, and appears to be under ventilated (excessive vapors present, under size vent port). Vessels class society is to evaluate these two areas of concern and apply corrective action of necessary, as space appears to of been modified . Locker is listed as a deck locker only on ships dwgs.
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 July 2006
Resolved 5 July 2006
Resolution: ABS class report# MA 724204
Accommodation/Occupational Safety › Medical/First Aid › Hospital Space
Issued 13 June 2006 Resolved
Hospital space toilet and sink is not operating. (no water).
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 5 April 2007
Resolution: The toilet and sink are fully operational. The vessel keeps the water valve closed when the hospital space is empty.
Engineering › Steering Gear System › Actuator
Issued 4 March 2005 Resolved
THE STEERING SYSTEM HAS A STEADY STREAM OF HYDRAULIC OIL LEAKING AT THE ACTUATOR WHEN THE #1 STEERING PUMP IS ENERGIZED AND WITH EVERY MOVEMENT. REPAIR LEAKS PRIOR TO MOVEMENT.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 6 March 2005
Resolution: Received class report from ABS stating that the deficiency had been rectified.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 10 February 2005 Resolved
Vessel reported that they were unable to pull up the anchor due to inoperable port anchor windlass. Vessel is to make permanent repair prior to departure from Stapleton Anchorage and provide proof of repair to USCG ACT NY.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2005
Resolution: Received technician report and Master statement/signature that the hydraulic motor for the Port anchor windlass has been repaired and operational. Vessel is clear to depart Stapleton Anchorage.
Accommodation/Occupational Safety › Ventilation › General
Issued 25 January 2005 Resolved
need to make repairs to eng rm fan SP #5.
Condition: Unknown
Action required: 705 - Other - as specified
Due 11 February 2005
Resolved 6 March 2005
Resolution: Engine room fan was replaced, examined, and tested.
Deck/Cargo › Crude Oil Washing Systems › Crude Oil Washing Machine
Issued 11 December 2004 Resolved
Prior to its use, make repairs to COW machines 3 port and 4 starboard.
Action required: 705 - Other - as specified
Resolved 23 December 2004
Resolution: CLEARED VIA CLASS REPORT
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 11 December 2004 Resolved
Prior to cargo operations, provide inert gas system strip chart.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 December 2004
Resolution: CLEARED VIA CLASS
Engineering › Freshwater System (air cooling) › Vent
Issued 11 December 2004 Resolved
Make repairs to engine room fan SP #5.
Due 11 February 2005
Resolved 23 December 2004
Resolution: CLEARED VIA CLASS REPORT
Deck/Cargo › Crude Oil Washing Systems › Crude Oil Washing System Pump
Issued 26 November 2004 Resolved
Restore #4 Starboard and #3 Port tank C.O.W. machines to original class approved condition IAW Solas Chapter 1, Regulation 11 prior to next U.S. Port.
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Due 3 December 2004
Resolved 26 November 2004
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 26 November 2004 Resolved
Repair leaks on all cargo tank expansion domes and and #2 starboard outboard C.O.W. machine prior to next U.S. Port.
Action required: 15 - Rectify deficiencies by next port
Due 3 December 2004
Resolved 26 November 2004
Lifesaving › Line-Throwing Appliances › Lines
Issued 26 November 2004 Resolved
Provide one additional line throwing appliance (for a total of four) and provide receipt prior to next U.S. port IAW Solas Ch. III, Reg 18.
Action required: 15 - Rectify deficiencies by next port
Due 3 December 2004
Resolved 2 December 2004
Resolution: Vessel found the fourth line throwing appliance in a storage closet on the navigation bridge. Vessel has a total of four appliances on board.
Engineering › Fuel Oil Service System › Pump
Issued 26 November 2004 Resolved
Restore aft fuel oil purifier to original class approved condition prior to next U.S. port and provide evidence to [name withheld], TX.
Action required: 15 - Rectify deficiencies by next port
Due 3 December 2004
Resolved 26 November 2004

Ownership record