Records from 2005 to 2026. Most recent: inspection, 15 July 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 23
15 July 2026
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8439073
2 February 2026
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8305492
19 December 2025
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8285626
26 August 2024
COI Inspection · Construction Oversight · Administrative Inspection
Physical examination · Outer Continental Shelf National Center of Expertise · Activity 8015914
8 June 2021
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7219319
25 April 2017
Internal Structural Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6133978
18 May 2016
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5862999
5 April 2016
COE-Administrative
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5847606
21 March 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5837287
6 March 2014
Deficiency Check · Hull Examination · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4811350
6 July 2012
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4369975
27 May 2012
Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4350974
4 May 2012
Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4301958
1 August 2011
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4103974
7 July 2011
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4120357
2 March 2009
Annual Inspection · MTSA Verification · In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3440079
27 August 2008
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3310179
10 April 2008
In-Service Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3181079
17 January 2008
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3132079
12 October 2007
MTSA Verification · In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3089309
20 February 2007
Initial Certification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2877204
6 September 2005
Construction Oversight
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2587359
10 January 2005
Construction Oversight
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 2678033
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 April 2025
No resolution recorded
Provide bilge pumps capable of reliable operation from control room, without restrictions to piping design flow from each watertight compartment in hull.
By 31 July 2025; Extended to 30Apr2026 on 28Nov2025.
Action required: 705 - Other - as specified
Due 31 July 2025 — due date passed with no resolution recorded
Operations/Management › Drills/Instruction › Fire
Issued 18 May 2016
Resolved
Multiple shortcomings: recovery of casualties, intenral comms, donning of FF outfit, establishing boundaries. Conduct on board training to improve planning, continginencies, and attack of fire to satisfaction of marine inspector. 33 CFR 146.125(b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 June 2016
Resolved 26 May 2016
Resolution: Conducted training.
Fire Fighting › Structural - A Class Divisions › Main Galleys
Issued 18 May 2016
Resolved
Galley door near serving line does not latch; no tag. Replace door. Other galley doors have UL rating, no CG/SFP test tag. Prove doors meet regs or replace doors w/ doors IAW regs. [46 CFR 108.135]
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 June 2016
Resolved 23 July 2016
Resolution: Door replaced. Pictures provided.
Lifesaving › Launching Appliances › Release Mechanism
Issued 6 March 2014
Resolved
During the brake test for the davit the boat hung up on the retainer chain for the safety pins. The hang up caused the boat to lay over at a 45 degree angle putting a load on the release hook outside the norm. Request the unit perform a load test on the release gear hooks and have the disassembled to ensure proper operation prior to use. A stand by boat is ordered until the boat is operational.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 16 June 2014
Resolution: Received email from [name withheld] with 3rd party certification attesting to the full operation of both release gear hooks on Lifeboat A. Boat has been placed back in full service and standby boat has been released.
Communications › Alarms/Indicators › General Alarm
Issued 6 March 2014
Resolved
Red flashing lights in high noise areas were not installed during the construction of the vessel. Unit is to provide a plan to install lights in the required areas or a letter from a professional engineer stating that they are not needed.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 July 2014
Resolved 22 August 2014
Resolution: Received email from [name withheld] (Compliance) attesting to the plan to install 04 class1 div 1 lights in the high noise areas. The plan is to have the lights installed before the end of the year and we will be informed when it is complete.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 4 May 2012
Resolved
There is no fixed CO2 system for the rental genset install per ABS 10-82 project # MC2067749. Engine is greater than 1,000bhp. Vessel to contact vendor or ABS to resolve issue.
Action required: 705 - Other - as specified
Due 9 August 2012
Resolved 9 August 2013
Resolution: Hurricane Generator now has a fixed CO2 suppression system installed.
Documentation › Manuals/Policy Documentation › Cargo/Ballast System Instruction Manual
Issued 4 May 2012
Resolved
Provide a Approved Ops Manual or submit to OCMI for approval.
Action required: 705 - Other - as specified
Due 9 June 2012
Resolved 15 May 2012
Resolution: Received Ops Manual from Anadarko, manual is under review.
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 7 July 2011
Resolved
Make repairs or replace air hoses as needed to restore to manufacturers specifications in Lifeboat "C".
Action required: 705 - Other - as specified
Due 21 July 2011
Resolved 9 July 2011
Resolution: leaking air line replaced
Electrical › Electrical Distribution System (service) › Junction Box
Issued 25 January 2007
Resolved
Demonstrate compliance with 46 CFR 111.105-33 for all electrical installations in hazardous locations to the satisfaction of attending USCG Marine Inspector prior to COI.
Action required: 705 - Other - as specified
Resolved 25 May 2007
Resolution: Cleared by ABS
Fire Fighting › Fixed Deck Foam System › Main Control Station
Issued 25 January 2007
Resolved
Demonstrate fire protection system for helicopter landing deck is capable of discharging from each hose at 100 PSI prior to helicopter fueling operations.
Action required: 705 - Other - as specified
Resolved 25 May 2007
Resolution: Cleared by ABS
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 25 January 2007
Resolved
Demonstrate man-overboard drill with fast rescue craft to the satisfaction of attending USCG Marine Inspector prior to COI.
Action required: 705 - Other - as specified
Resolved 25 May 2007
Resolution: No fast rescue craft on board. conducted drill using designated life boat.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 25 January 2007
Resolved
Make all air receivers available for inspection and provide all information and access required by attending USCG Marine Inspector prior to COI.
Action required: 705 - Other - as specified
Resolved 25 May 2007
Resolution: U1A new recievers
Operations/Management › Cargo Transfer/Lightering › Conducted IAW with Facility Operations Manual
Issued 25 January 2007
Resolved
Demonstrate compliance with 46 CFR 58.60 and 46 CFR 111.107 for all industrial systems to the satisfaction of attending USCG Marine Inspector prior to COI.
Action required: 705 - Other - as specified
Resolved 25 May 2007
Resolution: Cleared by ABS
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 25 January 2007
Resolved
Obtain approval of Operating Manual and Construction Portfolio prior to COI.
Action required: 705 - Other - as specified
Resolved 25 May 2007
Resolution: OPS Manual ABS approved
Operations/Management › Drills/Instruction › Abandon Ship
Issued 25 January 2007
Resolved
Obtain USCG approval of Emergency Evacuation plan (EEP) IAW 33 CFR 146.140 prior to COI.
Action required: 705 - Other - as specified
Resolved 26 January 2007
Operations/Management › Drills/Instruction › Activating General Alarm
Issued 25 January 2007
Resolved
Once offshore and operating all machinery/equipment, demonstrate that the general alarm signal produces minimum sound pressure levels above ambient noise levels as required by 46 CFR 113.25-12 and 46 CFR 113.50-15 for public address system prior to COI.
Action required: 705 - Other - as specified
Resolved 22 July 2008