Records from 2016 to 2026. Most recent: inspection, 9 April 2026.
Inspection history · 41
9 April 2026
PSC B · COC-CVE Quarterly
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8342986
18 December 2025
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8286715
18 December 2025
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8296006
9 October 2025
COC-CVE Annual · PSC A
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8250237
14 April 2025
PSC B · COC-CVE Quarterly
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8109317
19 October 2024
PSC A · COC-CVE Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8019353
20 April 2024
COC-CVE Quarterly · PSC A
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7896473
21 October 2023
COC-CVE Annual · PSC A
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7810418
20 September 2023
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7795228
22 April 2023
COC-CVE Quarterly · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7671102
21 November 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7597929
22 October 2022
COC-CVE Annual · PSC A
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7579395
10 May 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7447743
18 April 2022
PSC B · COC-CVE Quarterly
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7431761
26 October 2021
PSC A · COC-CVE Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7338186
28 April 2020
In-Service Inspection
Physical examination · USCG Southeast District (dp) · USCG Southeast District (CGD-SE) · Activity 6944883
7 March 2020
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7056192
1 March 2020
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6920987
2 December 2019
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6865438
2 December 2019
MARPOL Annex VI Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6865580
23 November 2019
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6861113
4 November 2019
ISPS III Exam · COC-CVE Annual · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6847896
2 July 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6733865
4 May 2019
COC-CVE Quarterly · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6636787
7 January 2019
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6608090
12 November 2018
ISPS II Exam · COC-CVE Annual · Ballast Water Examination
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6576349
1 October 2018
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6564326
27 July 2018
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6493119
14 May 2018
ISPS II Exam · COC-CVE Quarterly · Ballast Water Examination · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6370609
19 March 2018
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6383542
3 January 2018
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6332174
13 November 2017
ISPS III Exam · COC-CVE Annual · Ballast Water Examination
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6300345
12 June 2017
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6173878
24 May 2017
Ballast Water Examination · ISPS III Exam · COC-CVE Quarterly
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6154695
2 December 2016
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6051307
20 November 2016
COC-CVE Annual · ISPS III Exam · Ballast Water Examination · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6043738
30 May 2016
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5914230
24 May 2016
Ballast Water Examination · COC-CVE Quarterly · ISPS II Exam
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5885087
16 May 2016
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5878582
3 April 2016
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5863812
6 January 2016
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5792989
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 April 2026
Resolved
Doorways and corridors and intermediate landings included in the means of escape shall be sized in the same manner as stairways. Shall not be less than 900 mm in clear width, the minimum clear width shall be increased by 10 mm for every one person provided for in excess of 90 persons. PSCO's observed a blocked escape route coming out of A/C Station 1:6 (Deck 7, MVZ 1).
74 SOLAS 01 II-2/28.1.5.3 17c
Action required: 17 - Rectify deficiencies prior to departure
Due 9 April 2026
Resolved 9 April 2026
Resolution: Crew removed blockage and stored in appropriate storage location.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 9 April 2026
Resolved
Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. PSCO's observed the following lack of knowledge for crewmembers: A secondary lifeboat coxswain for lifeboat #8 was unfamiliar with the operation of the lifeboat's VHF radio, a member of lifeboat #14 was unfamiliar with the operation of the fuel shut off valve, 02 stairway guides were unable to identify the ships general emergency alarm and 01 member of the special needs team was unable to articulate his assigned duties.
74 SOLAS 20 III/19.2.1 17c
Action required: 17 - Rectify deficiencies prior to departure
Due 9 April 2026
Resolved 9 April 2026
Resolution: Training was provided to all crew that were identified with lack of knowledge.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 9 April 2026
Resolved
The public address system shall be clearly audible above the ambient noise in all spaces, and shall be provided with an override function controlled from one location on the navigation bridge. The loud noise of the arcade located on Deck 05 did not mute when the emergency announcements were made from the bridge. The PA system could not be heard over the ambient noise.
74 SOLAS 20 III/6.5.2 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2026
Resolved 9 April 2026
Resolution: Ship's crew was able to fix the system prior to inspection team completing the exam.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 April 2026
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300 mm above the deck at all points of the escape route, including angles and intersections. The marking must enable passengers to identify the routes of escape and readily identify the escape exits. Additionally, escape route signs and fire equipment location markings shall be of photoluminescent material or marked by lighting. PSCO's observed 02 - 1 meter sections of extinguished low-location lighting near passenger cabin 7367 and 7363.
74 SOLAS 01 II-2/28.1.10 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2026
Resolved 9 April 2026
Resolution: Crew replaced the extinguished sections of low location lighting while exam team was onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 19 October 2024
Resolved
All life-saving appliances and arrangements shall comply with the applicable requirements of the code. All life-saving appliances shall be fitted with retro-reflective material where it will assist in detection. PSCO witnessed retro-reflective tape in worn condition, unable to reflect light shone upon it on all starboard lifeboats along gunwale. 74 SOLAS (20) III/34 LSA Code 1.2.2.7 10 c
Action required: 10 - Deficiency Rectified
Resolved 19 October 2024
Resolution: Crew replaced all worn retro-reflective tape with new retro-reflective tape.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 19 October 2024
Resolved
All life-saving appliances and arrangements shall comply with the applicable requirements of the Code. The engine shall be capable of operating for not less than 5 min after starting from cold with the lifeboat out of the water. PSCO witnessed lifeboat #19 unable to start on one of the two batteries. Crew determined the batter was dead and needed to be replaced.
Action required: 10 - Deficiency Rectified
Resolved 19 October 2024
Resolution: Crew replaced the battery and PSCO witness successful engine start on the lifeboat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 October 2023
Resolved
Electrical installations shall be such that electrical services for safty will be ensured under various emergency conditions. PSCO witnessed overhead cableways with plastic zip ties supporting cables above WTD #4 in the engine room. SOLAS (2004) II-1/40.1.2 16 a c
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 November 2023
Resolved 26 October 2023
Resolution: Recieved and reviewed class report attesting to the replacement of plastic cable ties with metal ones.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 October 2022
Resolved
The machinery shall be of a design and construction adequate for the service in which they are intended. PSCO observed jacket water leak on the #2 cylinder and jacket water cooler on the emergency generator diesel engine. 74 SOLAS 04 II-1/26.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 November 2022
Resolution: PSC NOLA received a class report from Lloyds Register satisfying the requirement.
14 - Pollution Prevention › 148 - Ballast Water › Ballast water report
Issued 22 October 2022
Resolved
For any vessel that is equipped with ballast water tanks and bound for ports or places in the United States: Submit the ballast water report no later than 6 hours after arrival at the port or place of destination, or prior to departure from that port or place of destination, whichever is earlier. Vessel crew did not submit a ballast water report to the National Ballast Water Clearing House within 6 hours of arrival. 33 CFR 151.2060(B)(3) 10c
Action required: 10 - Deficiency Rectified
Resolved 22 October 2022
Resolution: Vessel conducted training on timely submission of ballast water report.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 18 April 2022
Resolved
In passenger ships, at least one person qualified in accordance with paragraph 1 of regulation IV/16 shall be assigned to perfom only radiocommunication duties during distress incidents. PSCO observed designated GMDSS primary operator during fire and abandon ship drill was also involved in internal communication duties. Station bill states individual has both GMDSS and internal communication duties. 74 SOLAS (2020) IV/16.2 50 a c
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2022
Resolved 10 May 2022
Resolution: PSC NOLA received a class report from LR satisfying the requirement.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 October 2021
Resolved
Suitable provisions shall be made to prevent inadvertent admission of the medium to any space. PSCO observed 4 hoses in the CO2 system that were cracked and worn excessively. 74 SOLAS (2001) II-2/5.1.2 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2021
Resolved 28 October 2021
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Crew renewed all four hoses with certified and tested new hoses.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 26 October 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The number 20 lifeboat (tender) has a penetrating crack through the hull onthe starboard aft quarter. 74 SOLAS (2020) III/20 17ac
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2021
Resolved 28 October 2021
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Crew made repairs following all manufacturers recommendations.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 26 October 2021
Resolved
The angular position of the rudder shall if the main steering gear is power operated, be indicated on the navigation bridge. PSCO observed the rudder angle indicator on the bridge to be incorrect by 6 degrees. 74 SOLAS (2004) II-1/29.11.1 16 ac
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 November 2021
Resolved 1 November 2021
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Onboard service technician aligned and calibrated all feedback units.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 26 October 2021
Resolved
Electrical installations shall be such that the safety of passengers, crew, and ship from electrical hazards will be ensured. PSCO discovered standing water in one of the emergency lighting covers located in the Lido Deck galley. 74 SOLAS (2001) II-1/40.1.3 16 ac
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 November 2021
Resolved 2 November 2021
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. Crew removed condensation build up from light.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Sulphur oxides
Issued 2 December 2019
Resolved
While ships are operating within an emission control area, the sulphur content of fuel oil used on board shall not exceed the following limits: 0.10% m/m on or after 1 January 22015. The Coast Guard was notified that the vessel's No. 5 diesel generator was run inside the emission control area for 3 minutes and 45 seconds on fuel containing approximately 1.98% m/m sulphur content. MARPOL (2017) Annex VI/14.4.3 10c
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 2 December 2019
Resolution: Observed change over procedures showing the diesel generator is now operating on low sulphur fuel oil.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 4 November 2019
Resolved
Every crew member with assigned emergency duties shall be familar with these duties before the voyage begins. PSC teams observed multiple crew members unaware os emergency duties which included stairway guides and life boat personnel.
74 Solas 2014 (a) III/19.2.1
50c
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 December 2019
Resolved 2 December 2019
Resolution: PSC NOLA RECEIVED DOCUMENTATION SATISFYING THE REQUIREMENT.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 4 November 2019
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working orderand ready for immediate use. PSc teams found lifeboat 22 unable to start, lifeboat 06 emergency tiller broken, and lifeboat 25 with shut off switch inoperable.
74 Solas 2014 (a)/III 20.2
10c
Action required: 10 - Deficiency Rectified
Resolved 4 November 2019
Engineering › Feedwater/Condensate Water System › Piping
Issued 13 November 2017
Resolved
A 16" sea-water pipe flange, located in the fresh water flat forward of the lube oil purifier rm, is leaking water onto a light fixture creating a hazard. Repair to the satisfaction of class or USCG.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 December 2017
Resolved 17 November 2017
Resolution: Flange has been repaired with no further leakage of seawater noted. See class report in Docs
Navigation › Piloting/Steering › Gryo Compass Repeater
Issued 13 November 2017
Resolved
Ships 1600 GT and greater must be provided with gyro repeaters capable of taking bearings over arc of the horizon 360 degrees. This vessel originally had repeaters installed on deck 9, then removed to make a state room. Current repeater location has a blind spot of approx. 008 degrees. Certificate issuing authority to attest to the suitability of current arrangement or alternative means. 74 SOLAS (2001 cons) V/12(d)(ii)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 December 2017
Resolved 3 January 2018
Resolution: Handheld compass was provided for use, class and flag approved its use. See Docs.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Nozzles
Issued 13 November 2017
Resolved
Four High-fog fire fighting water system heads were found painted. These heads were located in the aft machinery space near SSDG #4, #5, and #6. These heads were cleaned or replaced.
Def corrected on the spot.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 November 2017
Resolved 14 November 2017
Resolution: Corrected on the spot.
Construction/Loadline › Penetrations › Gasket
Issued 25 May 2017
Resolved
Where electrical cables are carried thru WTB subdivision arrangements shall be made to ensure the watertight integrity of the bulkhead. Found 3 marine cables penetrations between wtd #10 & #11 improperly installed. Mixing of approved penetration seals not allowed.
Action required: 705 - Other - as specified
Due 25 June 2017
Resolved 12 June 2017
Resolution: PSCE verified proper installation of WTBH cable penetrations seals located between water tight doors #10 and #11.