Records from 2005 to 2012. Most recent: inspection, 9 July 2012.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (electric)
Issued 10 March 2010
Resolved
Provide e completed check sheet for all engineering automated control/monitoring systems.
Due 15 May 2010
Resolved 30 April 2010
Navigation › Electronic Positioning › GPS/DGPS Receiver
Issued 10 March 2010
Resolved
Provide a new registration sticker for the EPIRB
Due 15 May 2010
Resolved 10 May 2010
Documentation › Logs/Records › Logbook (official)
Issued 10 March 2010
Resolved
Vessel is required to maintain an Official Logbook and submit to the USCG as required for review. *Rcvd email that item was corrected, to be verified at next CG attendance.
Due 11 June 2011
Resolved 24 May 2011
Resolution: Official log book reviewed and is being used properly.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Pump
Issued 10 March 2010
Resolved
Provide pressure test certificates for all fuel/oil transfer hoses
Due 15 May 2010
Resolved 10 May 2010
Documentation › Certificates/Documents › NLS Certificate
Issued 10 March 2010
Resolved
Provide USCG approved SMPEP letter. *Rcvd email that item was corrected, to be verified at next CG attendance.
Due 11 June 2011
Resolved 24 May 2011
Resolution: SMPEP letter is corrected.
Engineering › Reduction Gearing/Clutches › Oil Spray
Issued 15 March 2008
Resolved
Repair / Replace the three inoperative reduction gear sending units
Due 15 April 2008
Resolved 18 April 2008
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 15 March 2008
Resolved
Trouble shoot the fault alarm showing on the fire detection panel. Properly identify all fire zones on the vessel. Prove proper operation of all smoke and heat detectors
Due 15 April 2008
Resolved 17 March 2008
Operations/Management › Drug and Alcohol Testing › Testing, Random
Issued 15 March 2008
Resolved
The vessels drug and alcohol testing program is not in compliance with regulations. Coordinate DAPI audit by the USCG at the Aberdeen office within 60 days.
Action required: 705 - Other - as specified
Due 15 May 2008
Resolved 19 September 2008
Operations/Management › Vessel Safety Management › Safety/Environmental Protection Policy
Issued 15 March 2008
Resolved
Ensure procedures listed in the vessels SMS are followed. Check off sheets to be signed or initialed instead of being check completed. Provide documentation that the Mud tanks were properly inspected prior to there use.
Due 15 April 2008
Resolved 15 March 2008
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 15 March 2008
Resolved
Provide can smoke and heat gun to test the fire detection panel
Due 18 April 2008
Resolved 15 March 2008
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 15 March 2008
Resolved
Prove proper operation of the stern anchor light
Due 15 April 2008
Resolved 15 March 2008
Navigation › Piloting/Steering › Gyro Compass
Issued 15 March 2008
Resolved
Repair inop Gyro
Due 15 April 2008
Resolved 18 April 2008
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 15 March 2008
Resolved
Prove proper operation of the FRC davit winch
Due 15 April 2008
Resolved 18 April 2008
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 15 March 2008
Resolved
Install door closures on WTD's protected by the fixed CO2 system
Due 15 April 2008
Resolved 18 April 2008
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 15 March 2008
Resolved
Conduct annual testing of the fixed f/f systems in the presence of a USCG Marine Inspector prior to departing Walvis Bay. Clearly mark & identify all remote pulls and operating instructions
Due 15 April 2008
Resolved 18 April 2008
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 15 March 2008
Resolved
Remove possible by pass connection currrently installed on the OWS. Install small test pet cock if needed, however piping from OWS to skin valve must not contain any easily removeable or changeable fittings
Due 15 April 2008
Resolved 15 March 2008
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 15 March 2008
Resolved
Replace incorrect and expired drug and alcohol test kits
Due 15 April 2008
Resolved 15 March 2008
Engineering › Fuel Oil Service System › Valve, Control
Issued 15 March 2008
Resolved
Prove proper operation of the remote F/O shutoff valves
Due 15 April 2008
Resolved 18 April 2008
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 15 March 2008
Resolved
Remove fire hazards from aft steering
Due 15 April 2008
Resolved 18 April 2008
Documentation › Certificates/Documents › Document of Compliance (ISM)
Issued 15 March 2008
Resolved
Provide updated copy of the DOC
Due 15 April 2008
Resolved 15 March 2008
Documentation › Certificates/Documents › Cargo Ship Safety Radio Certificate
Issued 15 March 2008
Resolved
Provide FCC approval for the last inspection of the radio equipment conducted by Kelly Marine.
Due 15 April 2008
Resolved 15 March 2008
Construction/Loadline › Structures › Trunk
Issued 15 March 2008
Resolved
Modify anchor channel through bow to prevent hang up during release
Due 15 April 2008
Resolved 18 April 2008
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 15 March 2008
Resolved
Provide evidence of annual service of Rescue Boat, winch and davit.
Due 15 April 2008
Resolved 18 April 2008
Lifesaving › Inflatable Liferafts › Approval
Issued 15 March 2008
Resolved
Prove the 4 life rafts are USCG approved by serial number and USCG approval number. Mark container with approval numbers.
Due 15 April 2008
Resolved 15 March 2008
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 15 March 2008
Resolved
Provide for proper support of stanchion at rescue boat davit control station. When outboard pelican hooks are released existing upright does not provide adequate support
Due 15 April 2008
Resolved 18 April 2008
Construction/Loadline › Hull › Keel
Issued 15 March 2008
Resolved
Provide permanent repair to the crack in the port keel cooler and crack & pinhole in the aft area of the skeg.
Due 15 April 2008
Resolved 18 April 2008
Lifesaving › Launching Appliances › Falls
Issued 15 March 2008
Resolved
End for end FRC falls
Due 15 April 2008
Resolved 15 March 2008
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 15 March 2008
Resolved
Provide proposal to USCG for reveiw in regards to the construction / location of a flammable locker to be placed aboard the vessel to store F/O samples. See 46 CFR 127.220 (c) & 132.310.
Due 15 April 2008
Resolved 18 April 2008
Construction/Loadline › Hull › Stiffener
Issued 15 March 2008
Resolved
Make proper repairs to the #4 port and stbd F/W tanks.
Due 15 April 2008
Resolved 18 April 2008
Documentation › Certificates/Documents › Cargo Ship Safety Radio Certificate
Issued 9 May 2007
Resolved
Vessel to show proof of a SOLAS Radio Safety Certificate.
Due 9 May 2007
Resolved 27 May 2007
Resolution: Cleared after receiving a copy of the new Radio Cert.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 9 May 2007
Resolved
Show proof of the annual audit of the SOPEP being conducted.
Due 9 May 2007
Resolved 27 May 2007
Resolution: Cleared after receiving a copy of Safety managers report.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 19 October 2006
Resolved
33U.S.C.1321(j)(5)(G)-The vessel owner/operator has not provided certification ensuring that response resources are capable of responding to the maximum extent practicable, to a worst case discharge.
33U.S.C.1321(j)(5)(D)(i)-The NTVRP does not identify the volume and type of fuel oil that would be involved in a worst case discharge
Due 19 November 2006
Resolved 24 December 2008
Resolution: Nontank VRP #04035 deactivated per correspondence dated 12/19/2008
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 19 October 2006
Resolved
33U.S.C.1321(j)(5)(D)(iii)-The NTVRP does not identify a classified oil spill removal organization for the LA/Long Beach Captain of the Port zone
Due 19 November 2006
Resolved 24 December 2008
Resolution: Nontank VRP #04035 deactivated per correspondence dated 12/19/08