MAURY USCG vessel records Sign in
← All vessels

GRACE BRIDGE

GRACE BRIDGE is a 2004 freight ship. The Coast Guard has recorded 22 inspections since 2005, most recently in August 2018, along with 6 deficiencies and 1 operational control.

Records from 2005 to 2018. Most recent: inspection, 25 August 2018.

Built
2004
Last inspected
25 August 2018
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9292266 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
735992
Flag
PANAMA
—
Maury page id
psix-735992

Inspections, by type

…with no type recorded5
Years with a record 8 calendar years (2005–2018)
The 22 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 8 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it54519 - Convention (Subpart B), Gross Ton
22921 - Convention (Subpart B), Net Ton
65023 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 22

25 August 2018 Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6521988
11 April 2018 Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6389694
20 March 2018 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6374989
29 December 2011 PI Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4215473
28 December 2011 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4222479
22 September 2011 Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4151721
17 September 2011 PII Safety Exam · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4140154
7 January 2010 Random ISPS/MTSA/PSC
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3660144
18 March 2009 MARPOL Annex V Examination · ISPS II Exam · PII Safety Exam · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3435026
8 August 2008 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3293348
21 February 2008 PII Safety Exam · Ballast Water Examination · ISPS II Exam · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3151000
15 February 2007 Random ISPS/MTSA/PSC · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2872575
15 March 2006 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2613504
19 January 2006 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2569624
1 August 2005 Random ISPS/MTSA/PSC
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2448049
27 July 2005 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2442497
26 July 2005 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2441030
24 June 2005 Random ISPS/MTSA/PSC
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2401574
22 June 2005 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2399563
22 June 2005 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2399791
3 February 2005 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2286014
3 February 2005 Type not recorded
No type recorded · GROUP SEATTLE · USCG Northwest District (CGD-NW) · Activity 2286160

Deficiency record · 6

07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 25 August 2018 Resolved
Fire protection and fire fighting system and appliances shall be maintained and ready for use. Fire protection systems and appliances shall be properly tested and inspected. Flame detector for AUX boiler only functions in manual mode.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 28 September 2018
Resolution: Received satisfactory Class report detailing repairs and operational status.
Operations/Management › Ballast Water Managment › Alternative Management Method
Issued 20 March 2018 Resolved
0940- In order to discharge ballast water in the waters of the United States, the vessel must use a Ballast Water Management System (BWMS) type approved by the US Coast Guard, use an Alternate Management System (AMS), or use ballast with water from the US Public Water System (PWS) according to the schedule in paragraph (b) of this section. This existing vessel, keel laid in AUG 21, 2004, with a ballast capacity of 17361 cubic meters, dry-docked in SEP 28, 2017 has passed its compliance date and has not installed a BWMS or AMS. Prior to discharging untreated ballast water in the waters of the United States, the vessel must comply with one of the approved ballast water management methods listed in 33 CFR 151.2035(a). Cite: 33 CFR 151.2035(a) This deficiency will not be cleared until CG examiners receive information that the vessel installs a BWTS, AMS, or decides to use only public water from the US Public Water System (PWS).
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 April 2018
Resolution: SEC HOU-GAL PSC Branch received a proper documentation satisfying the requirements.
Operations/Management › Ballast Water Managment › Mandatory Practices
Issued 20 March 2018 Resolved
0940- A vessel equipped with ballast water tanks that operates in the waters of the United States must maintain a ballast water management plan that has been developed specifically for the vessel and that will allow those responsible for the plan's implementation to understand and follow the vessel's ballast water management strategy and comply with the requirements of this subpart. Vessels ballast water management plan does not include all of the necessary provisions listed in 33CFR 151 Subpart D. Vessel’s ballast water management plan must include the provisions listed in 33 CFR 151.2050(g). The plan must include actions for implementing the mandatory BWM requirements and practices. Cite: 33CFR151.2050(g)(2)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 April 2018
Resolution: SEC HOU-GAL PSC Branch received a proper documentation satisfying the requirements.
Engineering › Diesel Engine (propulsion-direct drive) › Distributor (air start)
Issued 29 December 2011 Resolved
60 (a)(c) THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATION TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ONBOARD. THE FUEL PUMP ROLLER GUIDE FAILED TO WORK PROPERPLY ON CYLINDERS 7&5 DURING ASTERN COMMANDS.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 December 2011
Resolution: Vessel OPERATIONAL Control removed upon receipt of satisfactory Technician & Class Report attesting to repairs and proper operation of fuel pump roller guides on cylinders 7 & 5.
Engineering › Steam System (main) › Valve
Issued 17 September 2011 Resolved
Every steam pipe and fitting connected thereto shall withstand working stresses to which it may be subjected. A valve on the main engine steam pre-heater is leaking.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 22 September 2011
Resolution: Received a class report attesting to the repai of the steam piping associated with the main engine pre-heater.
Operations/Management › Drills/Instruction › Fire
Issued 15 February 2007 Resolved
Failed first fire drill. Recommended more training in the following areas: Initial actions, dressing out in fire fighting equipment, hose and lifeline handling, and communications between fire team and on-scean coordinator.
Action required: 705 - Other - as specified
Resolved 15 February 2007
Resolution: Training will be conducted in the area listed above.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.