Records from 2005 to 2025. Most recent: inspection, 10 January 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 13.0 ft
Registered tonnagegross 1,754 / net 1,754
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJEFFBOAT LLC · JEFFERSONVILLE, IN, UNITED STATES · built 2005
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1754 - Simplified, Gross Ton
1754 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
10 January 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8060902
27 December 2024
Damage Survey
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 8051757
25 July 2023
MTSA Verification · Internal Structural Exam · COI Inspection · Examination of Repairs · Drydock Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7746837
27 July 2021
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7277284
9 December 2020
Bulk Liquid Transfer Monitor
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7109297
10 May 2018
MTSA Verification · Examination of Repairs · COI Inspection · Cargo Tank Internal · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6407918
9 April 2017
Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6121181
9 April 2017
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6154508
23 March 2016
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5839205
8 April 2015
Internal Structural Exam · COI Inspection · Drydock Exam · MTSA Verification · Cargo Tank Internal · Examination of Repairs
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5099161
3 April 2014
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4826494
17 January 2012
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4225969
9 March 2010
COI Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3692496
27 July 2009
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3547350
20 July 2009
Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3541352
29 April 2009
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3463607
25 February 2008
Periodic Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3153125
22 August 2007
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3035164
7 August 2007
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3015559
22 June 2006
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2687037
29 July 2005
Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2444237
1 June 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2375575
13 May 2005
MTSA Verification · Internal Structural Exam · Hull Examination · Initial Certification · Cargo Tank Internal
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2356838
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 27 December 2024
Resolved
No extensive repairs to the hull or machinery which affect the safety of a vessel shall be made without the knowledge of the Officer in Charge, Marine Inspection.
Vessel reported damage to the port bow rake compromising the watertight integrity of the barge. Bow rake has large inset and puncture which will require permanent repair to satisfaction of CG. Barge is permitted to transit unloaded as detailed in the provided transit plan dated 12/27/24. Repairs are to be made to satisfaction of Sector Houston-Galveston OCMI office. Barge is not permitted to operate/conduct cargo until this 835 is cleared by the CG.
46 CFR 32.10-25
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 16 January 2025
Resolution: Conducted a visual exam of all repairs on the port side bow rake and witnessed air test at 1.0 PSI. Test satisfactory.
1.0 PSI. Test satisfactory.
Construction/Loadline › Hull › Bottom Plating
Issued 9 April 2017
Resolved
Starboard #1 wingtank, commencing at the forward bulkhead and extending aft for 30'3" bottom plating was set in from 0-10" over its width with the adjacent knuckle plating and associated internals distorted to conform.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2017
Resolved 11 May 2018
Resolution: Crop and renewed
Construction/Loadline › Hull › Bottom Plating
Issued 9 April 2017
Resolved
Starboard #2 wingtank commencing at the forward bulkhead and extending aft 24', the bottom plating was set in 0-6" over the starboard outboard extreme 17' with the adjacent knuckle plating and associated internal distorted to conform.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 April 2017
Resolved 11 May 2018
Resolution: crop and renewed
Construction/Loadline › Hull › Bottom Plating
Issued 9 April 2017
Resolved
Port #1 wingtank commencing approximately 2' aft of the forward bulkhead and extending aft 18' the rake bottom plating was set in from 0-5" over its width with associated internals distorted to conform.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 April 2017
Resolved 11 May 2018
Resolution: crop and renewed
Deck/Cargo › Vapor Control Systems › Flame Screens
Issued 20 July 2009
Resolved
Prior to loading next cargo, replace flame screen of proper mesh to P/V valve on VCP.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 July 2009
Resolution: Vessel replaced VCS P/V valve
Deck/Cargo › Holds/Tanks › Flame Arrester
Issued 20 July 2009
Resolved
Properly repair/replace flame screen of proper mesh to #4stbrd gooseneck IWO wing void.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 August 2009
Resolved 27 July 2009
Resolution: Vessel renewed flame screen
Electrical › Lighting (emergency) › Lighting Fixture
Issued 7 August 2007
Resolved
Replace light on cargo pump engine with an intrinsiclly safe light.
Action required: 705 - Other - as specified
Due 7 September 2007
Resolved 22 August 2007
Resolution: Non-intrinsically safe light was removed.
Engineering › Diesel Engine (auxiliary) › Gear/Clutch Starter (electric)
Issued 7 August 2007
Resolved
Extrended CG-835 for wiring harness on electronically controled John Deere pump engine per D8 guidance
Due 1 August 2008
Resolved 22 August 2007
Electrical › Electrical Distribution System (service) › Wiring
Issued 22 June 2006
Resolved
Vsl is equipped with an electronically controlled John Deere pump engines. A CG-835 was issued to make modifications to the alternator & wiring harness to meet Class 1 Division 1 requirements in accordance with D8 policy letter 02-2005.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 30 August 2008
Resolved 20 July 2009
Resolution: Barge replaced their electronically controlled JD prime movers with 3306 CAT movers, meeting the Class 1 Div 1 requirements.
Electrical › Electrical Distribution System (service) › Wiring
Issued 22 June 2006
Resolved
Vsl is equipped with electronically controlled John Deere pump engines. A CG-835 was issued to replace control box & safety light to meet Class 1 Division 1 requirements in accordance with D8 policy letter 02-2005.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 August 2008
Resolved 22 August 2007
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 13 May 2005
Resolved
Obtain Certificate Of Financial Responsibility for vessel and place on board IAW 33 CFR 138.65.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 June 2005
Resolved 29 July 2005
Resolution: [name withheld] verified valid COFR on board vessel.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 13 May 2005
Resolved
Following application of vessel coatings, contact local OCMI and request inspection to ensure vessel markings are adequate and vessel transfer equipment is operational.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 June 2005
Resolved 29 July 2005
Resolution: [name withheld] verfied adequate vessel markings and operational vessel transfer equipment.