Documentation record
Registered dimensions (L × B × D)44.4 ft × 14.4 ft × 3.9 ft
Registered tonnagegross 16 / net 13
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJ W WESTON · DELTAVILLE, VA, UNITED STATES · built 1957
Hull materialWood
PropulsionDiesel Direct
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portWORTON, MD
Endorsements, as the file codes themcw_un
DocumentationValid · issued 14 March 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it13 - Regulatory (Subpart C or D), Net Ton
16 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 18 inspections, each with its date, unit and type; 9 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 18
2 June 2026
Construction Oversight
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8387175
23 April 2026
COI Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8354919
11 March 2026
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8324330
24 April 2025
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8126515
4 June 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7955809
11 April 2024
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7900555
6 April 2023
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7668064
6 June 2022
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7469977
7 April 2022
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7428820
2 June 2021
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7222516
2 February 2021
COI Inspection · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7134649
2 July 2020
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7015178
11 April 2019
DAPI Audit · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6664244
14 June 2018
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6443827
12 April 2018
Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6399999
8 June 2017
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6182145
13 April 2017
DAPI Audit · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6132918
18 April 2016
COI Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5854467
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 April 2026
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. MI observed a fuel leak on the fuel return pipe on top of the stbd bank of the main engine.
46CFR176.830
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 May 2026
Resolution: Fuel leak repaired. All sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 23 April 2026
Resolved
All vessels shall be provided with a hand operated portable fire pump having a capacity of at least 5 gallons per minute. This fire pump shall be equipped with suction and discharge hose suitable for use in fire fighting. Vessel did not have a hand operated portable fire pump on board.
46CFR181.10-5(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 May 2026
Resolution: Portable hand fire pump on board. All sat.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 23 April 2026
Resolved
The intent of this part is to insure that the scantlings, material, fastenings, workmanship and arrangement of each vessel are such as to provide for
safe operation in accordance with the terms of its certificate of inspection. MI observed weepage coming from stbd chine board amidships. Suspected coming through old fastener hole. MI will need to attend u/w to determine extent of weepage.
46CFR177.01
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 May 2026
Resolution: Weepage did not get worse. Temp repair was conducted.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 23 April 2026
Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that an abandon ship or man overboard drill be held under simulated emergency conditions specified by the inspector. MI did not get vessel underway due to fuel leak. MI needs to attend to witness drills.
46CFR176.808(g)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2026
Resolution: Witnessed drills. All sat.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 23 April 2026
Resolved
As appropriate for the intended voyage,all vessels must carry adequate and up-to-date-(a) Charts;(b) Sailing directions;(c) Coast pilots;(d) Light lists. There were no up to date charts on board.
46CFR185.20-35
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 May 2026
Resolution: Charts and pubs on board. All sat.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 23 April 2026
Resolved
The intent of this part is to insure that the scantlings, material, fastenings, workmanship and arrangement of each vessel are such as to provide for
safe operation in accordance with the terms of its certificate of inspection. MI observed weepage originating from the starboard chine board amidships. A temporary repair was performed, and the following mitigation measures must be adhered to until a permanent repair is completed:
1. Vessel is restricted to operating within the Chester River only.
2. Hourly inspections/rounds of the engine room are required during vessel operation.
Action required: 705 - Other - as specified
Resolved 22 June 2026
Resolution: Repairs completed and sea trial condcuted. All sat.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 11 April 2024
Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. The master shall conduct sufficient fire drills to make sure that each crew member is familiar with his or her duties in case of a fire. Vessel did not have records of drills or maintenance for 2023 or 2024
46 CFR 185.520 & .524
Action required: 10 - Deficiency Rectified
Resolved 11 April 2024
Resolution: Conducted Drills during inspection while underway with crew and logged accordingly.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 6 April 2023
Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. The master shall conduct sufficient fire drills to make sure that each crew member is familiar with his or her duties in case of a fire. Vessel did not have records of drills or maintenance for 2022 or 2023. 46 CFR 185.520 & .524
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 April 2024
Resolution: Deficiency cleared to the satisfaction of the attending CG Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 April 2023
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. Vessels Fuel Shutoff Pull line was within the machinery space and made of Nylon Rope. Replace with a material that will not burn in the event of a fire. 46 CFR 182.455(b)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 April 2024
Resolution: Deficiency cleared to the satisfaction of the attending CG Marine Inspector.