MAURY USCG vessel records
← All vessels

CHAILEASE BLOSSOM

CHAILEASE BLOSSOM is a 2004 freight ship. The Coast Guard has recorded 5 inspections since 2016, most recently in May 2022, along with 12 deficiencies and 1 operational control.

Records from 2016 to 2022. Most recent: inspection, 26 May 2022.

Built
2004
Last inspected
26 May 2022
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 26 May 2022
Operational controls None recorded without a removal date
Years with a record 4 calendar years (2016–2022)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9287780
738296
Flag
LIBERIA
Maury page id
psix-738296

Documentation record

Tonnage as PSIX records it41205 - Regulatory (Subpart C or D), Gross Ton
41205 - Convention (Subpart B), Gross Ton
77684 - Dead Weight, Metric Ton
88366 - Displacement, Metric Ton
26189 - Regulatory (Subpart C or D), Net Ton
26189 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 5

26 May 2022 PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7444653
9 September 2019 ISPS III Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6802640
3 April 2019 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6648615
30 January 2018 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6346370
5 May 2016 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5863875

Deficiency record · 12

10 - Safety of Navigation › N/A - No Subsystem › Voyage data recorder (VDR)/Simplified Voyage data recorder(S-VDR)
Issued 9 September 2019 Resolved
To Assist in casualty investigations, cargo ships when engaged on international voyages, shall be fitted witha VDR. PSCO observed teh vessel had an inoperable VDR since 04SEP19. Report of the issue was made to company IAW company procedures. SOLAS 74(a) 2014(cons) V/20.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2019
Resolution: Received ABS report.Defective capsule removed and new capsule was installed. VDR examined and tesed satisfactory.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 9 September 2019 Resolved
The Oil Record Book Part 1(ORB) shall be completed on each occasion when the following machinery space operations takes place: Collection and disposal of oil residues (sludge) Each operation described in this regulation shall be fully recorded without delay in the ORB, so that all entries in the book appropriate to the operation are completed. PSCO observed required weekly sludge tank sounding since 08Jun19 were not recorded IAW Appendix III of Marpol Annex 1 Marpol Annex I/17.2& 17.4
Action required: 10 - Deficiency Rectified
Resolved 9 September 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 3 April 2019 Resolved
THE MEANS FOR SECURING AND MAINTAINING WEATHERTIGHTNESS SHALL BE TO THE SATISFACTION OF THE ADMINISTRATION AND SHALL ENSURE THAT THE TIGHTNESS CAN BE MAINTAINED IN ANY SEA CONDITIONS. 12 OUT OF 152 CARGO HOLD HATCH SECURING DEVICES ARE EITHER SEIZED AND/OR BROKEN, WHICH PREVENTS THE ABILITY TO SECURE THE CARGO HOLD AND MAINTAIN WEATHERTIGHTNESS. ICLL I/16.4, 30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 3 April 2019
Resolved 6 April 2019
Resolution: Received, reviewed and accepted class report / proper documentation from ABS stating the deficiency was rectified. Securing devices were replaced with vessel's spares and considered satisfactory.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 3 April 2019 Resolved
THE ELECTRICAL POWER AVAILABLE SHALL BE SUFFICIENT TO SUPPLY ALL THOSE SERVICES THAT ARE ESSENTIAL FOR SAFETY IN AN EMERGENCY, DUE REGARD BEING PAID TO SUCH SERVICES AS MAY HAVE TO BE OPERATED SIMULTANEOUSLY. THE EMERGENCY GENERATOR HAS A SIGNIFICANT WATER LEAK FROM THE FRESH WATER COOLING FEED LINE AND IN FIVE MINUTES OF OPERATION THE WATER GAUGE DROPPED FROM OPERATIONAL LEVELS TO LOW LEVELS. 74 SOLAS (04) II-1/43.2, 30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 3 April 2019
Resolved 6 April 2019
Resolution: Received, reviewed and accepted class report / proper documentation from ABS stating the deficiency was rectified. Radiator core for emergency generator was replaced and examined during operational test and found satisfactory.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 3 April 2019 Resolved
THE COMPANY SHOULD ESTABLISH PROCEDURES TO ENSURE THAT THE SHIP IS MAINTAINED IN CONFORMITY WITH THE PROVISIONS OF THE RELEVANT RULES AND REGULATIONS AND WITH ANY ADDITIONAL REQUIREMENTS WHICH MAY BE ESTABLISHED BY THE COMPANY. OBJECTIVE EVIDENCE DURING AN EXPANDED ISM EXAM REVEALED THAT THE CREW WAS NOT ACCURATELY FOLLOWING THE SHIP’S PROCEDURES WITH REGARD TO EXTERNAL EXAMINATION OF THE CLOSED HATCH COVERS AND SECURING ARRANGEMENTS. IN ACCORDANCE WITH THE SHIP’S SMS, THE MASTER SHALL ENSURE THAT THE CARGO HATCHES AND SECURING ARRANGEMENTS ARE FIT FOR THE INTENDED VOYAGE AND ARE EXAMINED AT LEAST ONCE A WEEK, WEATHER PERMITTING. AT LEAST THREE CONSECUTIVE LOG ENTRIES FOR EXAMINATION OF SECURING ARRANGEMENTS WERE DOCUMENTED AS "NORMAL," AND SIGNED BY THE MASTER, [name withheld] ENGINEER. IN ADDITION, THE CREW DID NOT PROPERLY REPAIR AND DID NOT REPORT THE CONDITION OF THE MARINE SANITATION DEVICE TANK TO THE MASTER. VARIOUS HOLES RANGING IN SIZE FROM 1” – 3” IN DIAMETER WERE FOUND ON THE TOP SIDE OF THE TANK AND WERE TEMPORARILY REPAIRED WITH TAPE AND PAINT. IT IS RECOMMENDED THAT AN EXTERNAL THIRD PARTY AUDIT OF THE SMS BE CONDUCTED WITH REGARD TO DEFICIENCIES NO. 1, NO. 2. AND NO. 4. 74 SOLAS (14) IX/ 3.1, ISM CODE PART A 10.1, 30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 3 April 2019
Resolved 6 April 2019
Resolution: Received, reviewed and accepted class report / proper documentation from the Republic of Liberia stating the deficiency was rectified. 02 non-conformities were issued. Corrective actions are due within 30 days and must be completed within 3 months.
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 3 April 2019 Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ONBOARD. THE MSD TANK HAS MULTIPLE HOLES RANGING IN SIZE FROM 1” – 3” LOCATED ON THE TOP OF THE TREATMENT TANK. CREW DID NOT MAKE PROPER REPAIRS WITH PROPER AUTHORIZATION FROM THE CLASSIFICATION SOCIETY. 74 SOLAS (04) I/11(a), 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 April 2019
Resolved 6 April 2019
Resolution: Received, reviewed and accepted class report / proper documentation from ABS stating the deficiency was rectified. Temporary doubler plate repairs were completed on tank and considered suitable until drydocking.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 3 April 2019 Resolved
ALL THE STEERING GEAR COMPONENTS AND THE RUDDER STOCK SHALL BE OF A SOUND AND RELIABLE CONSTRUCTION TO THE SATISFACTION OF THE ADMINISTRATION. IN LOCAL CONTROL, ON EACH STEERING GEAR PUMP (ONE AND TWO), THE RUDDER DRIFTS TO STARBOARD ONE DEGREE EVERY FIVE SECONDS. 74 SOLAS (04) II-1/29.2.1, 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 April 2019
Resolved 6 April 2019
Resolution: Received, reviewed and accepted class report / proper documentation from ABS stating the deficiency was rectified. Servo motors were adjusted by vessel's crew and examined during operational test.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 3 April 2019 Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. THE PORT ANCHOR CHAIN HAS A CHAIN LINK WITH A LOOSE STUD. 74 SOLAS (04) I/11, 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 April 2019
Resolved 6 April 2019
Resolution: Received, reviewed and accepted class report / proper documentation from ABS stating the deficiency was rectified. Loose stud was examined and found to remain effective. Loose stud to be permanently repaired next drydocking.
05 - Radio Communications › N/A - No Subsystem › INMARSAT ship earth station
Issued 3 April 2019 Resolved
EVERY SHIP ENGAGED ON VOYAGES BEYOND SEA AREAS A1 AND A2 SHALL BE PROVIDED WITH AN INMARSAT SHIP EARTH STATION CAPABLE OF THE REQUIREMENTS IN PARAGRAPHS 1.1 THROUGH 1.4 INMARSAT C HAS BEEN OUT OF ORDER SINCE 28MAR2019. 74 SOLAS (14) IV/10.1 , 17ac
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 3 April 2019
Resolved 6 April 2019
Resolution: Received, reviewed and accepted class report / proper documentation from Mackay Marine stating the deficiency was rectified.
05 - Radio Communications › N/A - No Subsystem › SART/AIS-SART
Issued 3 April 2019 Resolved
AT LEAST ONE SEARCH AND RESCUE LOCATING DEVICE SHAL BE CARRIED ON EACH SIDE OF EVERY CARGO SHIP OF 500GT AND UPWARDS. ONE OF THE TWO SARTS REQUIRED TO BE ON BOARD HAS BEEN OUT OF ORDER SINCE 27MAR2019. 74 SOLAS (14) III/6.2.2, 17ac
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 3 April 2019
Resolved 6 April 2019
Resolution: Received, reviewed and accepted class report / proper documentation from Mackay Marine stating the deficiency was rectified.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 April 2019 Resolved
BULK CARRIERS SHALL BE FITTED WITH WATER LEVEL DETECTORS IN ANY DRY OR VOID SPACE OTHER THAN A CHAIN CABLE LOCKER, GIVING AN AUDIBLE AND VISUAL ALARM AT A WATER LEVEL OF 0.1 METERS ABOVE THE DECK. THE VESSEL CANNOT COMPLY WITH CONDITION 1 OF THE REPUBLIC OF LIBERIA LETTER OF DISPENSATION DATED 01 APRIL 2019 BECAUSE THE CREW CANNOT ESTABLISH A PATROL FOR THE HOURLY MONITORING OF THE VOID SPACE NO.1 AND NO. 2 IN OTHER THAN FAVORABLE WEATHER CONDITIONS. 74 SOLAS (14) XII/12.1.3, 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 April 2019
Resolved 6 April 2019
Resolution: Received, reviewed and accepted class report / proper documentation from ABS stating the deficiency was rectified. Vessel developed "Procedure for water ingress alarm system and de-watering system malfuntion during whole intended voyage."
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 April 2019 Resolved
SHIPS SHALL BE DESIGNED, CONSTRUCTED AND MAINTAINED IN COMPLIANCE WITH THE STRUCTURAL, MECHANICAL, AND ELECTRICAL REQUIREMENTS OF A CLASSIFICATION SOCIETY WHICH IS RECOGNIZED BY THE ADMINISTRATION. THE VESSEL CANNOT COMPLY WITH CONDITION 3 OF THE REPUBLIC OF LIBERIA LETTER OF DISPENSATION DATED 01 APRIL 2019 IN OTHER THAN FAVORABLE WEATHER CONDITIONS BECAUSE THE BILGE PUMPING SYSTEM CAN ONLY BE OPERATED LOCALLY. 74 SOLAS (04) II-I/3-1, 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 April 2019
Resolved 6 April 2019
Resolution: Received, reviewed and accepted class report / proper documentation from ABS stating the deficiency was rectified. Vessel developed "Procedure for water ingress alarm system and de-watering system malfuntion during whole intended voyage."

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.