Records from 2005 to 2011. Most recent: inspection, 30 August 2011.
Inspection history · 10
30 August 2011
COI Inspection · Load Line/Change of Employment
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4131110
1 May 2009
Re-Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3465062
14 March 2009
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3440791
14 March 2009
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3451571
25 November 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3374736
8 May 2008
Examination of Repairs · Deficiency Check · Hull Examination · Re-Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3201600
27 June 2007
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2976837
24 May 2006
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2868538
9 May 2005
Plan Review (Other than "T") · MTSA Verification · Hull Examination · Construction Oversight · Welding Related Inspections Qualification Testing · Internal Structural Exam · Cargo Tank Internal · Initial Certification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2353477
19 April 2005
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2337980
Documentation › Safety/Response Plans/Programs › Damage Stability Calculation Program/Plans
Issued 30 August 2011
Resolved
Vessel added equipment to become a multi-cert vessel (L&I). Awaiting calculations to determine if stability will be affected by the MOD.
Action required: 705 - Other - as specified
Due 26 February 2012
Resolved 26 April 2012
Resolution: New ABS stability letter was issued
Documentation › Manuals/Policy Documentation › Steering Gear Changeover Instructions
Issued 30 August 2011
Resolved
Provide diagram and instructions in E/R for emergency steering operation.
Due 6 February 2012
Resolved 30 January 2012
Resolution: Provided and posted emergency steering instructions
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 30 August 2011
Resolved
Provide blanket for port main diesel turbo.
Due 6 February 2012
Resolved 30 January 2012
Resolution: Replaced exhaust blanket
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 14 March 2009
Resolved
Vessel could not provide alcohol test strips. Vessel required to provide alcohol test strips on board.
Action required: 705 - Other - as specified
Due 13 June 2009
Resolved 1 May 2009
Resolution: Vsl has placed current test strips onboard.
Navigation › Piloting/Steering › Marine Charts
Issued 8 May 2008
Resolved
Provide marine charts suitable for navigating approaches to inland ports transitted by the vsl.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 May 2008
Communications › Radio Communications › Emergency Source of Power
Issued 8 May 2008
Resolved
Prove proper operation of ship's radios on emergency power circuit as required.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 May 2008
Operations/Management › Drills/Instruction › Abandon Ship
Issued 9 May 2005
Resolved
Prove proficiency in conducting the following drills: Man Overboard, Abandon ship, and Fire.
Action required: 705 - Other - as specified
Due 13 May 2005
Resolved 11 May 2005
Resolution: demonstrated.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 9 May 2005
Resolved
Install guard on the bow thruster aft flywheel.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 May 2005
Resolved 11 May 2005
Resolution: Installed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 9 May 2005
Resolved
Install face plate on the engine room forward electrical outlet.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 May 2005
Resolved 11 May 2005
Resolution: Installed.
Construction/Loadline › Structures › Air Pipe
Issued 9 May 2005
Resolved
Install caps on the modified methanol vent pipes.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 May 2005
Resolved 11 May 2005
Resolution: Installed.
Construction/Loadline › Structures › Air Pipe
Issued 9 May 2005
Resolved
Install proper bolts and nuts on the stove, dryer, 01 level and main deck head vent closure devices.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 May 2005
Resolved 11 May 2005
Resolution: Installed.
Pollution Prevention/Response › Prevention Equipment › Coamings
Issued 9 May 2005
Resolved
Provide plugs for all containments.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 May 2005
Resolved 11 May 2005
Resolution: Installed.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 9 May 2005
Resolved
Provide all loadline related documents.
Action required: 705 - Other - as specified
Due 13 May 2005
Resolved 11 May 2005
Resolution: Installed.