Records from 2016 to 2021. Most recent: operational control imposed, 3 November 2021.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 12
3 November 2021
Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7345333
4 July 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7244317
20 November 2020
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7094842
17 September 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7060067
16 September 2020
PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7059013
16 September 2020
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7059496
16 June 2020
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6978090
10 June 2020
PSC B · MARPOL Annex I Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6971331
1 June 2020
MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6965341
26 June 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6450466
16 October 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6023683
11 October 2016
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6013431
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 17 June 2020
Resolved
14119 - Pollution Prevention - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. Upon entering the duct keel for examination, PSCOs witnessed a visible silvery sheen on the water in the space. Additionally, PSCOs witnessed oil on the bulkheads as well as oil soaked lagging on various pipes in the space. The crew stated it was oil but did not know where it came from. MARPOL I/6.4.1
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 June 2020
Resolution: Received Class report attesting to environmental safety of the space and satisfactory repairs.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 10 June 2020
Resolved
14105 - Pollution Prevention - Any discharge into sea of oil or oily mixtures shall be prohibited unless the oily mixtures processed through an oil filtering equipment meeting the requirements of regulation 14. Vessel was bypassing oily water separator in way of suction hose from bilge holding tank, into suction valve of a void space, through the bilge cross connect valve into the general service pump, which leads directly overboard. In addition emergency bilge cross connect valve can be manipulated without breaking vessel's tamper seal - MARPOL I/15.2.2
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Resolved 16 June 2020
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Construction (including exempt.)
Issued 10 June 2020
Resolved
01102 - Certificates and Documentation - After any survey of the ship, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the administration.
Duct keel bilge alarm was going off every 03 days starting on 18mar2020 due to a steam pipe leak. Starting on 27mar2020, vessel began manually disabling duct keel bilge alarm. There is no SMS record of notifications or requisitions to the company for repairs, nor did flag or class approve these repairs. There is no record of where the duct keel bilge water was transferred - 74 SOLAS(14) I/11(B)
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 16 June 2020
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 10 June 2020
Resolved
01315 - Certificates and Documentation - The oil record book part I shall be completed for each discharge overboard or disposal otherwise of bilge water which has accumulated in the machinery space. After review of the oil record book and bilge tank soundings, numerous inconsistencies were identified:
Unaccounted for bilge tank water on 16apr2020 (1.9m3), 24apr2020 (1.86m3).
Sounding on 19may2020 was 9.4m3. OWS was then run. Oil record book stated they discharged 6.96m3 and retained 2.44m3. Sounding on 20may2020 read 0m3.
MARPOL I/17.2.4
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Resolved 16 June 2020
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Safety and environment policy
Issued 10 June 2020
Resolved
15101 - Safety Management Systems - The company and the ship shall comply with the requirements of the ISM code. Company should ensure the safety of environmental protection policy implemented and maintained at all levels of organization.
Company policy states "Chief Engineer is responsible for safe/efficient operation of systems and equipment onboard." The bilge cross-connect valve to the general service pump was manipulated to discharge contents of bilge tank directly overboard. Recommend external ISM audit. 74 SOLAS(14)IX/3.1, ISM CODE A/2.2
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Resolved 16 June 2020
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Safety and environment policy
Issued 10 June 2020
Resolved
15101 - Safety Management Systems - The company and the ship shall comply with the requirements of the ISM code. Company should establish and maintain procedures to control all documents and data which are relevant to SMS.
Company procedure states "ensure that all local and international oil pollution laws are strictly observed and that the oil record book part I is maintained as required by law." Oil record book part I and daily soundings log showed conflicting data.
74 SOLAS (14)IX/2.1, ISM CODE A/2.2
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Resolved 16 June 2020
10 - Safety of Navigation › N/A - No Subsystem › Voyage data recorder (VDR)/Simplified Voyage data recorder(S-VDR)
Issued 10 June 2020
Resolved
10114 - Safety of Navigation - To assist in casualty investigations, cargo ships, when engaged on international voyages, shall be fitted with a voyage data recorder (VDR).
VDR is inoperative. 74 SOLAS(14)V/20.2
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 September 2020
Resolution: Received Class Report.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 10 June 2020
Resolved
14119 - Pollution Prevention - Each operation described by regulation 17.2 shall be fully reported without delay in the oil record book part I, so that all entries in the book appropriate to the operation are completed.
The 2nd engineer stated and demonstrated that he was transferring oily water from the bilge tank, through a diaphragm pump, to the sludge tank, then to the waste oil tank for means of evaporating water. This is not approved by class or flag and was not logged in the oil record book part I. MARPOL I/17.4
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Resolved 16 June 2020
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Construction (including exempt.)
Issued 10 June 2020
Resolved
01102 - Certificates - After survey of the ship, no change shall be made to structural arrangements, machinery, equipment or other items covered by the survey without the sanction of the administration. The duct keel hatch safety switch lever was found off its bracket rendering the alarm ineffective, thus causing a risk to the vessel and crew.
74 SOLAS(14) I/11(b)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 June 2020
Resolved
13199 - Propulsion and Auxiliary Machinery - After survey of the ship, no change shall be made to structural arrangements, machinery, equipment or other items covered by the survey without the sanction of the administration. After attempting to isolate the general service fire pumps, a valve broke from the general service piping arrangement. The crew is currently unable to isolate the pumps, thus causing a risk to vessel and crew. 74 SOLAS(14) I/11(b)
Action required: 10 - Deficiency Rectified
Resolved 11 June 2020
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 10 June 2020
Resolved
15105 - Safety Management Systems - The company should ensure that all personnel involved in the company's safety management system have an adequate understanding of relevant rules, regulation, codes and guidelines. The incinerator combustion chamber maximum temperature set point was manually programmed to 700 degrees Celsius. The company requirements state that solid waste shall not be fed into a continuous feed shipboard incinerator when the temperature is below the minimum allowed temperature of 850 degrees Celsius.
74SOLAS(14)IX/3.1 - ISM A 6.4
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2020
14 - Pollution Prevention › 146 - MARPOL Annex VI › Type approval certificate of incinerator
Issued 10 June 2020
Resolved
14605 - Pollution Prevention - The equipment shall be maintained to conform with the provision of this annex and no changes shall be made in the equipment, systems, fittings, arrangements or materials covered by the survey without the express approval of the administration. The incinerator operating instructions manual states, "when the combustion temperature exceeds 850 degrees Celsius the door lock on sluice door is engineered and feeding of solid waste can start". The sluice door was able to be opened at 558 degrees Celsius. MARPOL VI/5.5
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 September 2020
Resolution: Vessel master provided Sector Maryland-NCR with sufficient documentation including pages from incinerator instruction manual to clear deficiency.
Engineering › Fuel Oil Service System › Suction Strainer
Issued 16 October 2016
Resolved
1410-Propulsion Main Engine-In a ship in which oil fuel is used, the arraignments for the storage, distribution and utilization of the fuel shall be as to ensure the safety of the ship and persons on board and shall at least comply to the following provisions. While in transit, the vessel experienced a propulsion irregularity due to a clogged fuel strainer. SOLAS 74 (2014) II-2/4.2.2 40a
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 26 June 2018
Fire Fighting › Ventilation Systems › Fans
Issued 11 October 2016
Resolved
0799-(Other Fire Fighting equipment)-Spaces which are located below deck shall be fitted with a mechanical ventilation system designed to take exhaust air from the bottom of the space. PSCO observed that all air vents in the CO2 space located below deck are blowing air into the space, not exhausting. 74 SOLAS (09cons) II-2/10.4.3 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 October 2016
Resolution: PSC NOLA received documentation from the vessel satisfying the requirement.
Fire Fighting › Ventilation Systems › Smoke Extraction System
Issued 11 October 2016
Resolved
0715-(Detection)-PSCO asked crew to turn on smoke extraction sampling system and upon doing so, observed a fault with airflow lines 1-6. 74 SOLAS (09cons) II-2/19.3.3 FSS Code 10.2.1.2 16ac
Action required: 705 - Other - as specified
Due 25 October 2016
Resolved 14 October 2016
Resolution: PSC NOLA received a class report from DNV-GL satisfying the requirement.