Records from 2007 to 2011. Most recent: inspection, 24 February 2011.
Documentation record
Tonnage as PSIX records it109 - Convention (Subpart B), Net Ton
74 - Regulatory (Subpart C or D), Net Ton
310 - Convention (Subpart B), Gross Ton
96 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Inspection history · 7
24 February 2011
COE-Administrative
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3951444
23 May 2008
Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3214316
4 September 2007
Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3048151
21 June 2007
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3393244
13 March 2007
Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2887299
12 March 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2887204
5 March 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2893476
Electrical › Electric Generation Source (service) › Generator
Issued 4 September 2007
Resolved
Engineer was unable to start stbd generator. Ensure stbd generator can be started and take electrical load prior to sailing to the satisfaction of an attending Coast Guard inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2011
Engineering › Steering Gear System › Motor
Issued 4 September 2007
Resolved
Steering system not operating normal. Both rudders are not operating together. Repair prior to sailing to the satisfaction of an attending Coast Guard inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2011
Fire Fighting › Fire Pumps › Gland Sealing
Issued 4 September 2007
Resolved
Rear seal of fire pump missing. Pump leaking and unable to provide proper pressure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2011
Engineering › Fuel Oil Service System › Valve
Issued 13 March 2007
Resolved
Repair or replace emergency shutoff valves in E/R.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2007
Resolution: Emergency shutoffs repaired
Engineering › Diesel Engine (propulsion-reduction gear) › Distributor (fuel injection)
Issued 13 March 2007
Resolved
Provide tech report for starboard mde.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 March 2007
Resolution: Rcvd Tech report
Electrical › Lighting (service) › Lighting Fixture
Issued 13 March 2007
Resolved
Attach light fixtures in port engine room.
Action required: 705 - Other - as specified
Resolved 15 March 2007
Resolution: Fixtures repaired
Stability › Weathertight Integrity › General
Issued 13 March 2007
Resolved
Broken windshields in pilot house.
Action required: 705 - Other - as specified
Resolved 15 March 2007
Resolution: New glass installed
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 13 March 2007
Resolved
Provide tech report to operation of heat detectors in port e/r.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 March 2007
Resolution: Witnessed operational test