Records from 2017 to 2021. Most recent: inspection, 24 June 2021.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 June 2021
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO observed improper cooling jacket bolts installed on the main engine which are not to manufaturers specifications.
74 SOLAS (04) II-1/26.1
Action required: 60 - Rectify deficiencies prior to movement
Due 23 July 2021
Resolved 24 June 2021
Resolution: Received, reviewed, and accepted Class NK Survey Report. Improper bolts were replaced with original spares onboard. Confirmed proper gap / spacing between bolt and jacket cover to be maintained properly for all cylinders.
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 24 June 2021
Resolved
All arrangement used for pilot transfer shall efficiently fulfil their purpose of enabling pilots to embark and disembark safely. Starboard accomadation ladder stanchion supports were coroded through.
74 SOLAS (14) V/23.2.1
Action required: 17 - Rectify deficiencies prior to departure
Due 23 July 2021
Resolved 24 June 2021
Resolution: Received, reviewed, and accepted Class NK Survey Report. (15) Stanchion sockets for starboard accomodation ladder and (05) for the port side ladder were replaced with new sockets made by ship's crew. Condition of class for permanent repair NLT 23AUG21.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 24 June 2021
Resolved
In spaced where penetration of oil products is possible, the surface insulation shall be impervious to oil. PSCO observed oil soaked lagging on the fuel oil return line.
74 SOLAS (04) II-2/4.3
Action required: 17 - Rectify deficiencies prior to departure
Due 23 July 2021
Resolved 24 June 2021
Resolution: Received, reviewed, and accepted Class NK Survey Report. The oil soaked lagging on the M/E fuel oil return line was renewed. No leak of fuel oil from the piping.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 February 2020
Resolved
THE MACHINERY, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD. THE FUEL OIL PUMP ON THE #2 GENERATOR WAS FOUND TO BE EXCESSIVELY LEAKING, EFFECTIVELY SOAKING ALL SURROUNDING PIPE INSULATION AND CREATING A POOL OF OIL BELOW THE GENERATOR. SOLAS 74 (2004) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 8 February 2020
Resolved 11 February 2020
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. MSU Portland conducted an onboard verification to confirm the deficiencies were rectified to the satisfaction of the COTP.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 February 2020
Resolved
THE MACHINERY, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. EXCESSIVE POOLING OF FUEL OIL WAS FOUND THROUGHOUT THE MAIN ENGINE CYLINDER HOUSING AREA, FILLING COMPONENT SEAMS, COATING HORIZONTAL SURFACES, AND CONTINUING TO RUN DOWN THE ENGINE SIDES TO LEVELS BELOW. SOLAS 74 (2004) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 8 February 2020
Resolved 11 February 2020
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. MSU Portland conducted an onboard verification to confirm the deficiencies were rectified to the satisfaction of the COTP.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 February 2020
Resolved
THE MACHINERY, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. THE DOUBLE JACKETED FUEL INJECTOR LINES LEADING TO THE #5 CYLINDER WERE FOUND TO BE LEAKING EXCESSIVELY TO THE POINT WHERE FUEL OIL WAS DRIPPING OFF THE BRAIDED METAL SHEAVING. SOLAS 74 (2004) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 8 February 2020
Resolved 11 February 2020
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. MSU Portland conducted an onboard verification to confirm the deficiencies were rectified to the satisfaction of the COTP.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 February 2020
Resolved
THE MACHINERY, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD. EXCESSIVE OILY RAGS FOUND THROUGHOUT ENGINEROOM, UNDER GENERATOR, ON THE MAIN ENGINE, AND THROUGHOUT THE FUEL PURIFIER FLATS, WHICH PRESENTS A SIGNIFICANT FIRE HAZARD AND DANGER TO THE SHIP AND ITS CREW. SOLAS 74 (2004) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 8 February 2020
Resolved 11 February 2020
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. MSU Portland conducted an onboard verification to confirm the deficiencies were rectified to the satisfaction of the COTP.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 February 2020
Resolved
THE MACHINERY, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD. EXCESSIVE LEAKAGE FROM ALL FITTINGS WAS FOUND ON THE #2 FUEL OIL PURIFIER RESULTING IN OIL SOAKED INSULATION ON ALL ASSOCIATED PIPING. IN ADDITION, A CREW-ENGINEERED FUNNEL-STRAINER APPARATUS WAS FOUND INSTALLED ON THE #2 FUEL OIL PIPING. SOLAS 74 (2004) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 8 February 2020
Resolved 11 February 2020
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. MSU Portland conducted an onboard verification to confirm the deficiencies were rectified to the satisfaction of the COTP.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 February 2020
Resolved
THE MACHINERY, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD. EXCESSIVE LEAKAGE WAS OBSERVED FROM ALL CONNECTIONS AND FITTINGS ON THE NUMBER 2 FUEL OIL HEAT EXCHANGER MANIFOLD RESULTING IN OIL SOAKED INSULATION ON ALL ASSOCIATED PIPING, THUS CREATING A SERIOUS FIRE HAZARD AND PRESENTING A CLEAR DANGER TO THE SHIP AND ITS CREW. SOLAS 74 (2004) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 8 February 2020
Resolved 11 February 2020
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. MSU Portland conducted an onboard verification to confirm the deficiencies were rectified to the satisfaction of the COTP.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 February 2020
Resolved
THE MACHINERY, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. THE #1 FUEL OIL CIRCULATION PUMP WAS FOUND TO BE EXCESSIVELY LEAKING FROM THE MECHANICAL SEAL. ADDITIONALLY A COFFEE CAN WAS UTILIZED TO COLLECT THE FUEL OIL WITH FUEL OIL COATING THE SURROUNDING AREA. SOLAS 74 (2004) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 8 February 2020
Resolved 11 February 2020
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. MSU Portland conducted an onboard verification to confirm the deficiencies were rectified to the satisfaction of the COTP.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 February 2020
Resolved
THE MACHINERY, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. OIL LEAKAGE FROM THE GENERATORS AND FUEL OIL PURIFIER FLATS PERMEATED THROUGH DECK OPENINGS WHICH SATURATED THE CABLE RUNS BELOW CONTAINING UP TO 7 ELECTRICAL CABLES. SOLAS 74 (2004) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 8 February 2020
Resolved 11 February 2020
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. MSU Portland conducted an onboard verification to confirm the deficiencies were rectified to the satisfaction of the COTP.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 February 2020
Resolved
HE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVSIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. THE #1 FIRE AND GENERAL SERVICE PUMP WAS FOUND TO BE LEAKING A CONTINUOUS STREAM OF SALT WATER DURING OPERATION. SOLAS 74 (2014) I/11a
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 February 2020
Resolved 11 February 2020
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. MSU Portland conducted an onboard verification to confirm the deficiencies were rectified to the satisfaction of the COTP.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 8 February 2020
Resolved
AFTER ANY SURVEY OF THE SHIP NO CHANGE SHALL BE MADE TO THE
EQUIPMENT AND OTHER ITEMS COVERED BY THE SURVEY. MODIFICATIONS TO THE PIPING OF THE OILY WATER SEPERATOR HAVE BEEN MADE WITHOUT DOCUMENTATION OF CLASS APPROVAL. SOLAS 74 (2014) I/11b
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 February 2020
Resolved 11 February 2020
Resolution: Received, reviewed and accepted class report from NKK stating the deficiency was rectified. MSU Portland conducted an onboard verification to confirm the deficiencies were rectified to the satisfaction of the COTP.
Operations/Management › Ballast Water Managment › Ballast Exchange
Issued 4 December 2017
Resolved
0940 - In order to discharge ballast water in the waters of the United States, the vessel must use a Ballast Water Management System (BWMS) type approved by the US Coast Guard, use an Alternate Management System (AMS), or use ballast with water from the US Public Water System (PWS) according to the schedule in paragraph (b) of this section.This existing vessel, keel laid in 2004, with a ballast capacity of 37664 cubic meters, dry-docked in DECEMBER 2016 has passed its compliance date and has not installed a BWMS or AMS. Prior to discharging untreated ballast water in the waters of the United States, the vessel must comply with one of the approved ballast water management methods listed in 33 CFR 151.2035(a).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 January 2018
Resolved 19 July 2018
Resolution: Received, Reviewed and accepted Special Note from CG-OES that extended the Ballast Water Expiry Date to 03JUL20.
Operations/Management › Ballast Water Managment › Ballast Exchange
Issued 4 December 2017
Resolved
0940 - A vessel equipped with ballast water tanks that operates in the waters of the United States must maintain a ballast water management plan that has been developed specifically for the vessel and that will allow those responsible for the plan's implementation to understand and follow the vessel's ballast water management strategy and comply with the requirements of this subpart. Vessels ballast water management plan does not include all of the necessary provisions listed in 33CFR 151 Subpart D. Vessel’s ballast water management plan must include the provisions listed in 33 CFR 151.2050(g).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 January 2018
Resolved 19 July 2018
Resolution: Received, reviewed and accepted ammendments to the Ballast Water Management Plan and determined to be satisfactory.