Records from 2008 to 2025. Most recent: inspection, 28 August 2025.
Inspection history · 43
28 August 2025
Deficiency Check · Internal Structural Exam · COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8220012
5 November 2024
Internal Structural Exam · Examination of Repairs · Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8029629
29 July 2024
Examination of Repairs · Deficiency Check · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7970170
27 September 2023
Administrative Inspection · Deficiency Check · Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7799630
16 August 2023
Damage Survey · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7778645
15 August 2023
Deficiency Check · Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7758896
13 January 2023
Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7620968
19 December 2022
Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7612591
16 December 2022
Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7641692
12 September 2022
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7557247
12 August 2022
In-Service Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7532475
23 July 2022
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7514744
12 July 2022
Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7504927
10 July 2022
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7511458
15 June 2022
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 7478790
27 December 2021
Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7384354
13 October 2021
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7332011
15 September 2021
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7313266
9 July 2021
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7254293
11 January 2021
Drydock Exam · Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7123009
24 June 2020
Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6986521
6 March 2020
Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6922160
11 September 2019
Administrative Inspection · In-Service Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6810686
26 August 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6795517
29 June 2019
Type not recorded
No type recorded · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6737331
19 June 2019
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6719481
17 May 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6688925
12 March 2019
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6641483
29 January 2019
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6618902
30 November 2018
Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6597974
1 November 2018
Annual Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6573372
14 February 2018
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6355225
26 September 2017
Annual Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6277224
25 May 2017
Type not recorded
No type recorded · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6155720
21 May 2017
Damage Survey
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6155311
3 May 2017
Deficiency Check
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6138137
19 January 2017
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6074236
16 December 2016
Examination of Repairs · In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6060187
13 December 2016
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6057398
27 September 2016
Annual Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6011098
29 August 2016
Type not recorded
No type recorded · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 5986512
28 April 2016
Deficiency Check
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 5865156
13 April 2016
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5859835
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 2 September 2025
Resolved
General. Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve. Unless otherwise stated in this section, each item of equipment carried, whether required under this section or not, must be secured by lashings, stored in lockers, compartments, brackets, or have equivalent mounting or storage arrangements that do not: (3) Interfere with launching, recovery, or rescue operations; On the stbd 50 person life raft, replace the strap equipment with the same strap on the other two life rafts. For the 6 person life raft, replace the frayed strap with a new one.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 September 2025
Resolution: Strap replaced
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 2 September 2025
Resolved
(b) Each battery must be located as high above the bilge as practicable, secured to protect against shifting with the roll and pitch of the vessel, and free from exposure to water splash or spray. MI found both batteries in the port jet room, without covers and with water near the terminals.
Action required: 10 - Deficiency Rectified
Resolved 2 September 2025
Resolution: Rectified.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 2 September 2025
Resolved
A pre-engineered fixed gas fire extinguishing system must:(3) Automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. STBD side engine #4 did not secure when fire boy was tested.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 2 September 2025
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 18 August 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: Provide services necessary for safety under normal and emergency conditions. Starboard forward engine room light was extinguished.
46 CFR 183.200(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2024
Resolved 2 September 2025
Resolution: Cleared
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 27 September 2023
Resolved
Each survival craft must be secured to the vessel by a painter with a float free link. Identified IBA's hydrostatic release units were not fitted with a shackle from painter to weak link IAW Hammar manufacturer mounting instructions.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2023
Resolution: Observed satifactory hydrostatic release.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 September 2023
Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 910 millimeters (3 feet) in length, not more (6 feet), securing the waterlight around the body of the ring life buoy. Identified lanyard has deteriorated. Replace lanyard.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2023
Resolution: Observed satisfactory RLB.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 28 August 2023
Resolved
A self priming power driven fire pump must be installed on each vessel of more than 65 feet in length. The vessel reported the engine driven fire pump was damaged and unable to provide pressure to the fire main. The vessel shall maintain a portable fire pump onboard along with the secondary electric fire pump until the primary engine driven pump is repaired. Effect permanent repairs and demonstrate proper operation of the primary fire pump within 5 days.
46 CFR 181.300
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 28 August 2023
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 15 August 2023
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level. Identified high water alarms in both jet voids were not mounted correctly and were found stowed on transverse frames.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 August 2023
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices must be corrected. Identified coolant leak on aft engine in Port engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 August 2023
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 15 August 2023
Resolved
The master of the vessel shall ensure that each EPIRB, other than an EPIRB in an inflatable liferaft, must be tested monthly. Identified EPIRB had not been tested/logged, and hydrostatic release was expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 September 2022
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition...Fuel is leaking from the fuel return line J1942 flex hose & J1475 hose fitting on top of the port side fuel tank. Properly repair fuel leak. 46 CFR 176.830
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 September 2022
Resolved 26 September 2022
Resolution: Operator replaced the J1942 and J1475 Fuel Hose with a brand new approved hose tested - all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 September 2022
Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets and the number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits. 46 CFR 185.604
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 September 2022
Resolved 26 September 2022
Resolution: Operator properly labeled the lifejacket storage with the correct number of lifejackets - all sat.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 12 September 2022
Resolved
The owner or managing operator shall notify the cognizant OCMI as far in advance as possible whenever a vessel is to be hauled out or placed in a drydock or slipway in compliance with § 176.600 or to undergo repairs or alterations affecting the safety of the vessel, together with the nature of any repairs or alterations contemplated. Hull repairs or alternations that affect the safety of the vessel include but are not limited to the replacement, repair, or refastening of planking, plating, or structural members including the repair of cracks...Submit plans to make permanent repairs to two cracks at the aft corners port and stbd bulwarks iwo of the vessels bow at the vessels next dry dock 01/31/2023. 46 CFR 176.665
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 28 February 2023
Resolved 14 February 2023
Resolution: Cracks in bulwarks repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 September 2022
Resolved
All cable and wire must: Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to bundling or retention of multiple cable installations, and not used as a means of support, except that on vessels of not more than 19.8 meters (65 feet) in length, installations in accordance with paragraph 14.h of ABYC E-8 and paragraph 15.h of ABYC E-9 (both incorporated by reference; see 46 CFR 175.600) are acceptable as meeting the requirements of this section...Properly install metal wire supports for all wire and cable runs. Wires in the stbd generator machinery space are supported only with plastic tie wraps. 46 CFR 183.340
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 September 2022
Resolved 26 September 2022
Resolution: Operator installed metallic wire supports and properly bundled all wire runs with metalic supports - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 June 2022
Resolved
Vessel experienced a faulty fuel injector alarm on #3 Main engine. Vessel is required to trouble shoot and make repairs to satisfaction of attending CGMI with in Seven days. Vessel is not restricted as the remaining three engines a capable of safely navigating the vessel and vessel meets the intent of their COI.
Action required: 705 - Other - as specified
Due 22 June 2022
Resolved 27 June 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 September 2021
Resolved
Electrical equipment on a vessel must be installed and maintained to: protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Two mini refrigerators were plugged into a power strip under the concession stand.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2021
Resolved 20 September 2021
Resolution: Extension cord removed.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 15 September 2021
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire. MI observed various areas in the port engine room that had oil accumulation. Clean bilge and locations surrounding main engine to mitigate fire potential.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2021
Resolved 28 September 2021
Resolution: Cleaned bilge.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 15 September 2021
Resolved
A space containing diesel machinery must be fitted with adequate means such as dripproof ventilators, ducts, or louvers, to provide sufficient air for proper operation of main engines and auxiliary engines. Powered ventilation for the port machinery space is producing a fault on the speed control box, causing it to be inoperable. Repair and restore to original condition.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2021
Resolved 13 October 2021
Resolution: Two wires on the driver circuit board were installed incorrectly. Operator fixed the wiring and the fan was tested with the attending MI.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 15 September 2021
Resolved
The Certificate of Inspection must be posted under glass or other suitable transparent material, such that all pages are visible, in a conspicuous place on the vessel where observation by passengers is likely. COI is currently posted on a ceiling panel in the starboard passageway. Post in a more readily seen location.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2021
Resolved 20 September 2021
Resolution: COI placed in passageway where observation by passengers is likely.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 September 2021
Resolved
Crew training shall be logged or otherwise documented for review by the Coast Guard upon request. The training entry shall include the following information: date of training and general description of the training topics. Deckhand and naturalist (Tucker and Bree) were not listed under section 5. "Crewmembers Verification of Orientation and Training" of the Vessel Orientation and Training Manual. Conduct training or prove training was conducted on a sister vessel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2021
Resolved 28 September 2021
Resolution: Verified orientation and training log was inclusive of the missing crewmembers.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 9 July 2021
Resolved
Public address system was inoperable.
Action required: 10 - Deficiency Rectified
Resolved 9 July 2021
Resolution: Vessel swapped out PA amplifier and test was SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 July 2021
Resolved
Battery covers were missing on the port and starboard generator battery banks and the port engine battery bank.
Action required: 10 - Deficiency Rectified
Resolved 9 July 2021
Resolution: missing battery covers were installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 July 2021
Resolved
SFP lagging was falling down from the edges around the stbd engine room ventilation shaft.
Action required: 10 - Deficiency Rectified
Resolved 9 July 2021
Resolution: SFP lagging was replaced.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 9 July 2021
Resolved
Stbd engine room ventilation did not close upon testing.
Action required: 10 - Deficiency Rectified
Resolved 9 July 2021
Resolution: Ventilation closure switch was replaced and op tested SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 July 2021
Resolved
STBD side void #1 bilge suction was inoperable.
Action required: 10 - Deficiency Rectified
Resolved 9 July 2021
Resolution: Bilge suction valve was tightened and op tested SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 11 January 2021
Resolved
Both fuel tanks fitted with plastic fuel gauge tubes and not self-closing valves. Valves must be self-closing and sight gauge must be glass. Replace fuel gauge with appropriate gauge. This was written as a deficiency due no later than 11FEB2021
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 February 2021
Resolved 22 June 2021
Resolution: Plastic fuel lines were removed from fuel tanks.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 March 2020
Resolved
Repair exhaust leaks on all main engines prior to operating engines.
Action required: 705 - Other - as specified
Due 7 March 2020
Resolved 9 July 2021
Resolution: All leaks repaired. No exhaust leaks detected during OPTEST.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 September 2019
Resolved
Starboard aft engine is out of order for engine rebuild. Prove proper operation prior to using engine.
Action required: 705 - Other - as specified
Resolved 9 July 2021
Resolution: STBD main was rebuilt and reinstalled. OPTEST SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 September 2019
Resolved
Repair port aft main engine coolant, exhaust and oil leak.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 September 2019
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 19 September 2019
Resolved
Replace exhaust lagging on all turbos.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2021
Resolution: All missing lagging was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019
Resolved
Port fwd engine had exhaust leak on inboard side. Exhaust leak was long standing evidenced by exhaust blowing a hole through the exhaust lagging.
Action required: 30 - Ship detained
Resolved 19 September 2019
Resolution: Vessel has repaired exhaust leak
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019
Resolved
Starboard aft main engine has an excessive oil leak, pooling oil on engine and in bilge creating a fire risk. Repair engine and clean bilge of excess oil. Repair and prove proper operation to attending marine inspector prior to using engine.
Action required: 705 - Other - as specified
Resolved 9 July 2021
Resolution: STBD Aft engine was rebuilt. No leaks detected during optest.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019
Resolved
Starboard aft engine is leaking sea water from wet exhaust system. Repair to original condition and prove operation prior to using engine.
Action required: 705 - Other - as specified
Resolved 9 July 2021
Resolution: STBD aft engine was rebuilt. Not leaks detected during opttest.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019
Resolved
Starboard fwd engine is out of order. Vessel master was not sure how long engine has been out of order. Prove proper operation of engine to attending marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2019
Resolved 24 September 2019
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 11 September 2019
Resolved
Vessel crew drills were not logged as required. Conduct drills and log as required.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 September 2019
Resolution: Vessel captain and crew completed drills on sister vessel
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 11 September 2019
Resolved
Vessel crew was unfamiliar with the fixed fire fighting systems onboard. Ensure vessel crew is knowlegable of fire fighting systems and emergency actions required.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 September 2019
Resolution: Company completed stand down training covering the Fire system onboard all vessels with all captains and crews
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 September 2019
Resolved
Install all batteries in the battery box or corrosive resistant trays
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2020
Resolution: All batteries are installed in boxs
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 August 2019
Resolved
Vessel shall provide plan review documents and drawings for newly installed fire pump and associated piping for approval by December 1st 20219.
Action required: 705 - Other - as specified
Due 1 December 2019
Resolved 24 June 2020
Resolution: Fire pump install has been approved and metal sea strainer installed
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 26 August 2019
Resolved
Vessel shall provide Coast Guard Marine Safety Center with information on all added weight with location for tracking of weight changes that could affect the vessel’s Stability Letter by December 1st 2019.
Action required: 705 - Other - as specified
Due 1 December 2019
Resolved 24 June 2020
Resolution: MSC has rcvd added weight changes for tracking
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 August 2019
Resolved
Vessel needs to provide means to engage/operate fire pump locally
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 March 2020
Resolution: Vessel installed local means of starts tested all sat.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 29 January 2019
Resolved
Bulkhead piping penetrations for systems with non-metallic piping must have a metallic valve at the bulkhead; renew or replace the plastic sewage valve at the aft bulkhead penetration in the #2 port void.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 12 March 2019
Resolution: Verified a metalic valve was provided at the bulkhead penetration.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 January 2019
Resolved
Fuel fill piping utilizing non-conducting flexible fill pipe sections shall be bonded to protect against static charge; fuel fill flexible sections in the overhead of the port fuel void are not bonded.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 12 March 2019
Resolution: Verified all flexible fuel fill pipe sections were properly bonded.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 January 2019
Resolved
Identified the vessel had insufficient power sources for the electrically powered vital systems listed in 182.710(a). Provide proposal/plans to address redundancy requirements.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 26 August 2019
Resolution: Vessel has installed fire pump driven off on main engine
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 November 2018
Resolved
Stowage containers for life jackets must be marked "lifejackets" as well as the quantity and size in each container (46CFR185.604(f)).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2018
Resolved 12 March 2019
Resolution: Verified life jack stowage locations were properly marked and indicated size and quantity.
Engineering › Steering Gear System › Power Unit
Issued 21 May 2017
Resolved
Repair STBD side steering system prior to sailing.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2017
Resolved 25 May 2017
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 27 September 2016
Resolved
Properly mark location of all children's lifejackets. Remove "rear" from current sign or replace with new one. All underseat locations are to be marked as required.
Action required: 705 - Other - as specified
Due 2 May 2017
Resolved 13 December 2016
Resolution: All lifejacket storage loacations were relabled as required.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 27 September 2016
Resolved
Properly mark location of all adult lifejackets stowed in main cabin, under fwd cabinet.
Action required: 705 - Other - as specified
Due 2 May 2017
Resolved 13 December 2016
Resolution: FWD Lifejacket locker was labled to properly reflect it as a storage location.
Personnel › Training › Passenger Safety
Issued 27 September 2016
Resolved
Demontrate satisfactory crew safety/emergency drills (M.O.B. and fire).
Action required: 705 - Other - as specified
Due 2 May 2017
Resolved 3 May 2017