Records from 2016 to 2026. Most recent: inspection, 13 May 2026.
Documentation record
Registered dimensions (L × B × D)32.0 ft × 10.0 ft × 5.3 ft
Registered tonnagegross 11 / net 11
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderALUMINUM MARINE CONSTRUCTION INC · TACOMA, WA, UNITED STATES · built 2005
Hull materialAluminum
PropulsionGasoline Outboard
Hull shapeShip
Hull configurationMonohull
Hailing portDEEP CREEK, AK
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationValid · issued 22 December 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it11 - Simplified, Gross Ton
11 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
13 May 2026
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8373211
17 September 2025
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8236985
12 May 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8133221
8 May 2024
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7909320
11 September 2023
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7789811
9 May 2023
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7684987
9 September 2022
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7555302
10 May 2022
Drydock Exam · Administrative Inspection · Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7458719
12 May 2021
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7195611
28 April 2020
Administrative Inspection · Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6945896
8 May 2019
Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6678288
15 May 2018
Internal Structural Exam · Drydock Exam · Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6410392
31 July 2017
DAPI Audit
Administrative · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6228870
9 May 2017
Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6161722
30 January 2017
Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6080017
9 May 2016
Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 5993880
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 9 May 2023
Resolved
03 cracked welds on engine mount, grind and reweld
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2023
Resolved 24 May 2023
Resolution: repaired
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 9 May 2023
Resolved
Ensure first aid kit is up to date.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2023
Resolved 24 May 2023
Resolution: first aid kit up to date
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 9 May 2023
Resolved
Provide portable lighting at the operating station and exit from the cabin
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2023
Resolved 24 May 2023
Resolution: provided
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 9 May 2023
Resolved
Vessel added new outboards. Provide weights, LCG, and VCG for new outboards and old outboards.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2023
Resolved 25 May 2023
Resolution: provided
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 8 May 2019
Resolved
Navigation publications onboard were not current issues.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 May 2019
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 8 May 2019
Resolved
Paper charts have not been corrected and electronic charting system has not been updated recently.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 May 2019
05 - Radio Communications › N/A - No Subsystem › SART/AIS-SART
Issued 8 May 2019
Resolved
Hydro static release on EPIRB expired in April 2019.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 May 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 May 2019
Resolved
Waterlight battery was not approved part number.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 May 2019
Resolution: They purchased one that is required by waterlight mfr.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 May 2019
Resolved
Retro reflective tape was deteriorated on life buoy
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 May 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 May 2018
Resolved
Vessel did not have lifering labeled correctly.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 May 2018
Resolution: Vessel correctly labeled lifering.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 15 May 2018
Resolved
Vessel did not have donning placard.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 May 2018
Resolution: Vessel posted donning placard.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 31 July 2017
Resolved
Company does not currently have an employee assistance program in place to include policy, training, or display requirements.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 August 2017
Resolved 17 August 2017
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 9 May 2017
Resolved
Fire boy needs to be serviced or replaced.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 June 2017
Resolved 15 May 2017
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 9 May 2016
Resolved
Provide FCC Safety Certificate.
Action required: 705 - Other - as specified
Due 9 June 2016
Resolved 30 January 2017