Records from 2005 to 2026. Most recent: inspection, 12 May 2026.
Documentation record
Registered dimensions (L × B × D)49.9 ft × 34.0 ft × 12.3 ft
Registered tonnagegross 96 / net 65
ITC dimensions (L × B × D)49.9 ft × 34.0 ft × 12.3 ft
ITC tonnageNot recorded
BuilderWESTERN TOWBOAT COMPANY · SEATTLE, WA, UNITED STATES · built 2005
Hull materialSteel
PropulsionDiesel
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portCORDOVA, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 3 December 2025 · expires 31 December 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it65 - Regulatory (Subpart C or D), Net Ton
96 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 33
12 May 2026
Periodic Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8343883
3 December 2025
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8272435
24 April 2025
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8126878
22 April 2025
Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8116307
11 January 2025
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8065147
12 November 2024
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8033566
28 October 2024
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8012925
5 September 2024
Explosive Handling Operation-Commercial
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7996924
5 September 2024
Explosive Handling Operation-Commercial
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7997832
29 April 2024
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7903687
9 April 2024
Explosive Handling Operation-Commercial
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7892752
27 February 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7870603
9 March 2023
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7648585
1 February 2023
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7630490
27 October 2022
Examination of Repairs · Drydock Exam · Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7584465
26 August 2022
DAPI Audit
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7549164
14 February 2022
Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7396348
3 November 2021
Examination of Repairs · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7344735
2 March 2021
Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7150341
29 May 2020
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6978842
5 November 2019
Drydock Exam · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6850603
20 November 2018
Initial Certification · MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6601975
3 November 2017
Spot Check (Safety) · Administration · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6302983
1 February 2016
Deficiency Check · Administration
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5812415
9 December 2015
Industry Initiated Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5783020
28 July 2013
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 4669608
8 May 2012
Administration
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4780300
13 April 2012
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 4286193
11 May 2011
Industry Initiated Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4007969
29 June 2008
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 3254626
1 September 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2766100
19 July 2006
MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2802620
12 July 2005
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2423865
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 April 2025
Resolved
The valve must be installed in the fuel piping directly outside of the fuel oil supply tank. The remote fuel shutoff valve installed directly outside of the day tank is not operational.
46 CFR 143.260(c)
Action required: 705 - Other - as specified
Due 30 November 2025
Resolved 4 December 2025
Resolution: Valves were installed and tested. all are operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 April 2025
Resolved
Except as permitted in paragraphs (d)(1) through (3) of this section, each fuel line must be seamless and made of steel, annealed copper, nickel-copper, or copper-nickel. Each fuel line must have a wall thickness no less than 0.9 millimeters (0.035 inches) except for the following: Nonmetallic flexible hose is acceptable if it Is used in lengths of not more than 30 inches. The nonmetallic flexible fuel hose line from both main engine remote fuel shut off valves to the main engines are greater than 30 inches.
46 CFR 143.265(d)(2)(i)
Action required: 705 - Other - as specified
Due 30 November 2025
Resolved 4 December 2025
Resolution: Fuel lines were replaced and verified at a length of 24".
10 - Safety of Navigation › N/A - No Subsystem › Voyage or passage plan
Issued 27 February 2024
Resolved
The officer in charge of a navigational watch must conduct a navigation assessment as per 46 CFR 140.635 for the intended route and operations prior to getting underway, which must additionally logged in the towing vessel record (TVR). Vessel does not have records, procedures, or TVR entries for navigation assessments.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2024
Resolved 19 March 2024
Resolution: all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 February 2024
Resolved
Find and repair exhaust leak on both main engines in the area of the turbos.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2024
Resolved 19 March 2024
Resolution: all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 March 2023
Resolved
Prove proper operation of port main coupling shaft with Attended USCG Marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 March 2023
Resolved 17 March 2023
Resolution: Rcvd video after installation of new shaft operating
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 22 February 2023
Resolved
Move EPIRB from current location under a overhang to a area to allow for vertical float free of EPIRb
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2023
Resolved 26 February 2023
Resolution: Rcvd picture of new location of EPIRB.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 22 February 2023
Resolved
Replace current line throwing appliance onboard with one approved under 46 CFR 160.40
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2023
Resolved 26 April 2023
Resolution: all sat
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 2 March 2021
Resolved
Each escape hatch used as a means of escape must be marked on both sides in clearly legible letters at leas 50 millimeters (2 inches) high: "EMERGENCY EXIT, KEEP CLEAR." Escape hatch IVO accomodations near galley not marked.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2021
Resolved 20 May 2021
Resolution: Received photographic evidence of emergency escape signage installed.
10 - Safety of Navigation › N/A - No Subsystem › Life-saving signals
Issued 2 March 2021
Resolved
A towing vessel must carry a combination of day and night visual distress signals indicated in Table 141.370. Vessel needs 6 day and 6 nigh but only had 2 days and 4 night distress signals.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 March 2021
Resolved 9 March 2021
Resolution: Received photographic evidence of the provision of required number of distress signals.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 March 2021
Resolved
Electrical conductors passing through watertight bulkheads must be installed so that the bulkhead remains watertight. Forward starboard bulkhead of engine room not watertight where wire penetrates.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2021
Resolved 20 May 2021
Resolution: Received photographic evidence of installed watertight fitting for forward E/R bulkhead.