Records from 2016 to 2026. Most recent: inspection, 17 June 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 23
17 June 2026
Drydock Exam
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8445911
23 July 2025
COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8186726
19 February 2025
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8081649
15 October 2024
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8019204
10 August 2024
Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7978572
27 June 2024
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7944494
20 February 2024
Construction Oversight · Drydock Exam
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7870529
21 June 2023
Annual Inspection · Drydock Exam · Administrative Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7720356
22 December 2022
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7613473
21 July 2022
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7513131
10 November 2021
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7351477
11 August 2021
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7284768
4 June 2021
Drydock Exam
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7220014
8 October 2020
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7082336
23 July 2020
COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7014496
27 June 2019
Drydock Exam
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6727895
22 May 2019
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6698332
24 July 2018
Examination of Repairs
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6489460
13 June 2018
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6474856
31 October 2017
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6558739
13 July 2017
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6209299
26 June 2017
Drydock Exam
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6199697
6 July 2016
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5933359
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 October 2024
Resolved
Exhaust gas must not leak from the piping or any connections. A leak was found IWA the port side turbo. 46 CFR 182.430 b
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 October 2024
Resolved 23 July 2025
Resolution: Verified durring COI renewal no exhaust gas leaking from port engine.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 15 October 2024
Resolved
Each watertight bulkhead must be of sufficient strength to be capable of remaining watertight with a head of water to the top of the bulkhead. A leak was discovered between the engine space and the compartment above it. 46 CFR 179.320 a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2024
Resolved 4 November 2024
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 15 October 2024
Resolved
Licensees of radio stations are required to have current station documents. Vessels Safe Radiotelephony Cert is expired. 47 CFR 80.401
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2024
Resolved 19 February 2025
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 October 2024
Resolved
All vessel's must have navigation lights that are in compliance with applicable sections of the International and Inland Navigation Rules. Vessel's anchor light is non-operational. 46 CFR 183.420 Prior to night time ops
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 October 2024
Resolved 23 July 2025
Resolution: Verified during COI renewal proper operation of anchor light.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 15 October 2024
Resolved
Vessel's must carry one floating water-light. The water light was found to have water in it and it also had the wrong type of battery in it. 46 CFR 180.71 d Prior to nightime ops
Action required: 705 - Other - as specified
Due 15 October 2024
Resolved 4 November 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 August 2024
Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Vessel experienced fire in engine compartment and manually deployed fixed halon firefighting system. Complete the following prior to returning to service:
1. Determine extent of damage
2. Determine origin of fire
3. Repair all damage IAW vessel plans
4. Recharge fixed halon firefighting system
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 10 August 2024
Resolved 15 October 2024
Resolution: Damaged electrical equipment was replaced in kind, verified during the annual inspection. Both 80 amp in line fuses were replaced for the bucket controllers.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 27 June 2023
Resolved
Vessel hull has experienced pitting beyond acceptable limits even for a hull built over scantling. Crop and renew deep/heavily pitted bottom plate.
Action required: 705 - Other - as specified
Due 5 September 2023
Resolved 15 June 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 June 2023
Resolved
01 - 13104 - A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Automatic bilge pump sensor did not activate pump or visual indicator in the presence of water. Repair or replace sensor and demonstrate proper operation of pump and indicator. - 46 CFR 182.530(C) - 16.C.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2023
Resolved 27 June 2023
Resolution: Vessel rep installed new bilge pump and tested it with USCG MI onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Means of rescue
Issued 21 July 2022
Resolved
Crew unavailable do to covid. Conduct underway man over board drill.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 August 2022
Resolved 27 July 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 July 2022
Resolved
Provide operational hand bilge pump capable of reaching all bilges spaces.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 August 2022
Resolved 27 July 2022
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 21 July 2022
Resolved
Corrosion was noted on inside and outside of hull. Due to previous wastage caused by stray currents, make underside of hull available for inspection.
Action required: 705 - Other - as specified
Due 21 September 2022
Resolved 22 December 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 July 2022
Resolved
Vessel must be provided an operational bilge pump. Prove proper operation of forward stb bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 July 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 August 2021
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces: A machinery space bilge, bilge well, shaft alley bilge, or other spaces subject to flooding from sea water piping within the space. Starboard bilge well high level visual and audible alarm inoperable. Repair to operational status.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 11 August 2021
Resolved 10 November 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 August 2021
Resolved
Materials used in piping systems must meet the requirements of this subpart and be otherwise acceptable to the cognizant [name withheld] engine raw water hose found leaking into engine space. Repair leak.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 11 August 2021
Resolved 10 November 2021
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 11 August 2021
Resolved
A power drive vessel underway shall exhibit a stern light. Stern light found inoperable. Replace light.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2021
Resolved 10 November 2021
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 11 August 2021
Resolved
Alcohol testing must be conducted on each individual engaged or employed on board the vessel who is directly involved in a Serious Marine Incident. Alcohol test strips found expired. Replace testing strips.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2021
Resolved 10 November 2021
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 11 August 2021
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041. Ammonia inhalants found expired. Replace inhalants.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2021
Resolved 10 November 2021
11 - Life Saving Appliances › N/A - No Subsystem › Means of rescue
Issued 23 July 2020
Resolved
Conduct underway man overboard drill. 46 CFR 176.404(a)
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 July 2020
Resolved 8 October 2020
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 22 May 2019
Resolved
Repair welds in way of main deck ram supports. 46 CFR 177.300(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2019
Resolved 27 June 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 June 2018
Resolved
Secure port and stb overboard bilge hose at side shell in fuel tank compartment. 46 CFR 176.804
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2018
Resolved 3 July 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 June 2018
Resolved
Provide operational hand bilge pump capable of reaching all bilges spaces.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 June 2018
Resolved 3 July 2018
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 13 June 2018
Resolved
Provide guard for pullies on stb engine shaft.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 June 2018
Resolved 3 July 2018
Construction/Loadline › Hull › Bottom Plating
Issued 26 June 2017
Resolved
Dry dock vessel, stop corrosion and make permanent repairs to hull pitting in accordance with your e-mail dated 28Jun17. 46 CFR 177.300(d)
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 3 November 2017
Construction/Loadline › Hull › Weld
Issued 6 July 2016
Resolved
Repair 4 marked cracked welds.
Action required: 705 - Other - as specified
Due 6 August 2016
Resolved 14 July 2016