Records from 2000 to 2006. Most recent: inspection, 10 July 2006.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Construction/Loadline › Penetrations › Valve Flange
Issued 25 April 2005
Resolved
Clean and reseal with linseed oil toilet intake and overboard sea valves
Action required: 705 - Other - as specified
Due 2 May 2005
Resolved 2 May 2005
Lifesaving › Lifefloat › Netting
Issued 25 April 2005
Resolved
Restring safety lines and repaint all life floats.
Action required: 705 - Other - as specified
Due 2 May 2005
Resolved 2 May 2005
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 25 April 2005
Resolved
Replace missing waterlight for starboard life float.
Action required: 705 - Other - as specified
Due 2 May 2005
Resolved 2 May 2005
Construction/Loadline › Hull › Hull Plating
Issued 7 June 2004
Resolved
Renew section of damaged planking in way of forward starboard thru hull.
Due 7 June 2004
Resolved 15 June 2004
Construction/Loadline › Penetrations › Flange Pad
Issued 7 June 2004
Resolved
Renew wooden backing block for after thru hull toilet overboard and examine planking in way of.
Due 7 June 2004
Resolved 15 June 2004
Construction/Loadline › Penetrations › Flange Pad
Issued 7 June 2004
Resolved
Replace deteriorated port and starboard rudder post wooden backing blocks.
Due 7 June 2004
Resolved 15 June 2004
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 7 June 2004
Resolved
Renew main engine cooling water inlet hose clamps.
Due 7 June 2004
Resolved 15 June 2004
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 7 June 2004
Resolved
Install clamps for port main engine cooling inlet line hose.
Due 7 June 2004
Resolved 15 June 2004
Engineering › Shafting/Propeller Arrangements › Coupling
Issued 7 June 2004
Resolved
Double clamp shaft stuffing gland hoses.
Due 7 June 2004
Resolved 15 June 2004
Engineering › Bilge Water Management System
Issued 2 July 2003
Resolved
Provide clamp for forward bilge pump in the engine room.
Action required: 705 - Other - as specified
Due 9 July 2003
Resolved 9 July 2003
Engineering › Sea-water System (primary cooling)
Issued 2 July 2003
Resolved
Install clamp for generator intake sea suction.
Action required: 705 - Other - as specified
Due 9 July 2003
Resolved 9 July 2003
Engineering › Generator (propulsion/auxiliary-electric)
Issued 2 July 2003
Resolved
Repair generator and prove operation.
Action required: 705 - Other - as specified
Due 9 July 2003
Resolved 9 July 2003
Lifesaving › Visual Distress Signals (General) › Quantity
Issued 2 July 2002
Resolved
Provide 3 orange smoke signals.
Due 12 July 2002
Resolved 11 July 2002
Resolution: Received fax copy of invoice.
Lifesaving › Rigid Liferafts
Issued 2 July 2002
Resolved
Provide water light for forward life float.
Due 12 July 2002
Resolved 11 July 2002
Resolution: Received fax copy of invoice.
Documentation › Markings/Placards
Issued 2 July 2002
Resolved
Mark vessel name on port & starboard bows.
Due 12 July 2002
Resolved 11 July 2002
Lifesaving › Rigid Liferafts
Issued 2 July 2002
Resolved
Properly make up pendants on all life floats.
Due 12 July 2002
Resolved 11 July 2002
Construction/Loadline › Hull
Issued 5 June 2002
Resolved
Disassemble port and starboard rudder post stuffing boxes and renew all 8 thru bolts.
Due 11 June 2002
Resolved 11 June 2002
Engineering › Sea-water System (primary cooling)
Issued 5 June 2002
Resolved
Disassemble following seavalves (taper sea cock) 2 inch overboard forward head, 1 inch intake forward head, 1 inch intake main engine
Due 11 June 2002
Resolved 11 June 2002
Engineering › Sea-water System (primary cooling)
Issued 5 June 2002
Resolved
Clean and seal areas around all sea valves and shaft stuffing boxes.
Due 11 June 2002
Resolved 11 June 2002
Construction/Loadline › Hull
Issued 5 June 2002
Resolved
Remove one keel bolt in the forward compartment for examination.
Due 11 June 2002
Resolved 11 June 2002
Construction/Loadline
Issued 9 June 2001
Resolved
Install watertight coaming, with a minimum height of six inches (6"), in the companionway leading to the below deck accomodations, in way of the froward starboard side of the pilothouse.
Condition: Unknown
Due 23 August 2001
Resolved 2 July 2002
Resolution: Examined coaming and found satisfactory.
Documentation
Issued 9 June 2001
Resolved
Prior to carrying passengers, provide satisfactory documentation of completion of pre-employment drug screening and enrollment in random testing program for deckhand.
Condition: Unknown
Due 21 July 2001
Resolved 23 July 2001
Fire Fighting
Issued 9 June 2001
Resolved
Prior to carrying passengers on overnight voyages, provide smoke dtectors meeting standard UL-217 for berthing areas.
Condition: Unknown
Due 21 July 2001
Resolved 23 July 2001
Navigation
Issued 9 June 2001
Resolved
Provide a recently calculated magnetic compass deviation table.
Condition: Unknown
Due 21 July 2001
Resolved 23 July 2001
Lifesaving
Issued 9 June 2001
Resolved
Provide a total of six (6) paddles for life floats. Until completed, passenger capacity is reducd to twenty-two (22),and total persons allowed is reduced to twenty-four (24).
Condition: Unknown
Due 21 July 2001
Resolved 23 July 2001
Construction/Loadline
Issued 1 May 2000
Resolved
INCREASE HAND RAILING HEIGHT TO 39.5 INCHES.
Condition: Unknown
Due 29 June 2000
Resolved 11 July 2000
Engineering
Issued 1 May 2000
Resolved
REPLACE FUEL LINES TO THE MAIN ENGINE AND GENERATOR WITH PROPER TYPE OF FLEXIBLE HOSES AND CONNECTIONS.
Condition: Unknown
Due 29 June 2000
Resolved 11 July 2000
Construction/Loadline
Issued 1 May 2000
Resolved
INSTALL A COLLISION BULKHEAD BETWEEN 5 PERCENT AND 15 PERCENT AFT OF THE FORWARD STEM AT THE WATERLINE.
Condition: Unknown
Due 29 June 2000
Resolved 12 July 2000
Electrical
Issued 1 May 2000
Resolved
PROVIDE OVERCURRENT PROTECTION FOR FOR ALL UNPROTECTED WIRES (BILGE PUMP AND RADIO).
Condition: Unknown
Due 29 June 2000
Resolved 12 July 2000
Construction/Loadline
Issued 1 May 2000
Resolved
INSTALL HIGH LEVEL BILGE ALARMS IN ENGINE ROOM AND THE AND STEERING SPACE.
Condition: Unknown
Due 29 June 2000
Resolved 12 July 2000
Engineering
Issued 1 May 2000
Resolved
RECONDITION MAIN ENGINE SHAFT PACKING GLANDS.
Condition: Unknown
Due 29 June 2000
Resolved 12 July 2000
Construction/Loadline
Issued 1 May 2000
Resolved
RENEW HOSE TO MSD INTAKE LOCATED AFT.
Condition: Unknown
Due 29 June 2000
Resolved 12 July 2000
Construction/Loadline
Issued 1 May 2000
Resolved
RENEW HOSE CLAMP TO MSD OVERBOARD (RED HOSE).
Condition: Unknown
Due 29 June 2000
Resolved 12 July 2000
Construction/Loadline
Issued 1 May 2000
Resolved
REFASTEN PORT AND STARBOARD GARBOARD PLANKS.
Condition: Unknown
Due 29 June 2000
Resolved 12 July 2000
Fire Fighting
Issued 1 May 2000
Resolved
INSTALL A NEW PRE-ENGINEERED FIXED FIRE FIGHTING SYSTEM FOR THE ENGINE ROOM..
Condition: Unknown
Due 29 June 2000
Resolved 12 July 2000
Electrical
Issued 1 May 2000
Resolved
LINE BATTERY BOXES AND INSTALL A COVER.
Condition: Unknown
Due 29 June 2000
Resolved 11 July 2000
Construction/Loadline
Issued 1 May 2000
Resolved
CAP UNUSED OVERBOARD DISCHARGE ON THE PORT SIDE.
Condition: Unknown
Due 29 June 2000
Resolved 11 July 2000
Engineering
Issued 1 May 2000
Resolved
PROVIDE GUARDS FOR MAIN ENGINE BELTS.
Condition: Unknown
Due 29 June 2000
Resolved 11 July 2000
Construction/Loadline
Issued 1 May 2000
Resolved
RECLAMP DRAIN LINE FOR FORWARD SINK.
Condition: Unknown
Due 29 June 2000
Resolved 11 July 2000
Engineering
Issued 1 May 2000
Resolved
PROVIDE SHIELD FOR RACOR FUEL FILTERS.
Condition: Unknown
Due 29 June 2000
Resolved 11 July 2000
Construction/Loadline
Issued 1 May 2000
Resolved
INSTALL PROPER DEAD COVERS FOR ALL PORT LIGHTS.
Condition: Unknown
Due 29 June 2000
Resolved 11 July 2000