Records from 2016 to 2024. Most recent: inspection, 14 June 2024.
Documentation record
Registered dimensions (L × B × D)48.0 ft × 18.0 ft × 4.0 ft
Registered tonnagegross 23 / net 18
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCHESAPEAKE BOATS INC · CRISFIELD, MD, UNITED STATES · built 2005
Hull materialFRP (Fiberglass)
PropulsionDiesel
Hull shapeShip
Hull configurationMonohull
Hailing portOCEAN CITY, NJ
Trade endorsementsFishery
DocumentationValid · issued 12 June 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it23 - Simplified, Gross Ton
18 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 10
14 June 2024
Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7934813
4 December 2023
Type not recorded
No type recorded · USCGC MAKO (WPB 87303) · USCG East District (CGD-E) · Activity 7834248
3 August 2022
Type not recorded
No type recorded · USCGC MAKO (WPB 87303) · USCG East District (CGD-E) · Activity 7524452
9 September 2020
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7053030
4 September 2019
Examination of Repairs · Internal Structural Exam · Plan Review "T" Boat · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6804883
3 June 2019
DAPI Audit · Internal Structural Exam · Administrative Inspection · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6702422
6 June 2018
DAPI Audit · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6427687
30 May 2018
Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6420236
31 May 2017
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6160632
8 April 2016
Simplified Stability Test · Internal Structural Exam · COI Inspection · Hull Examination · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5854682
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 24 November 2020
No resolution recorded
Prior to carrying passengers submit a written proposal of construction plan to ensure vessel meets structural fire protection for entire boundary between engine room overhead space and weather deck.
46CFR177.410(c)
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 November 2020 — due date passed with no resolution recorded
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 9 September 2020
Resolved
Each survival craft required on a vessel by this part must meet one of the following: For an life float - approved under approval series 160.027 or other standard specified by the Commandant. Life floats should be of a material that is resistant to deterioration by exposure to weather or must have a surface that protects it from deterioration. Repair holes/deteriorated areas on both life floats in accordance with manufacturer's instructions, or replace life floats.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 November 2020
Resolved 18 November 2020
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 9 September 2020
Resolved
Each life float must be stowed with two paddles. Vessel was missed two sets of paddles, one set for each life float. Produce two sets of paddles that are stowed and marked as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2020
Resolved 9 November 2020
Resolution: Verified that life float paddles were onboard and stowed propperly.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 9 September 2020
Resolved
General purpose resins may be used instead of fire retardant resins if the following additional requirements are met... boundaries that separate machinery spaces from accommodation spaces, service spaces, and control spaces must be lined with with noncombustible panels or insulation approved in accordance with 46CFR164.009. Provide documentation that vessel's engine room entrance panels were constructed with an approved noncombustible material.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 November 2020
Resolved 24 November 2020
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 9 September 2020
Resolved
Steering gear should be of adequate strength. Vessel's port side rudder post has small leak. Replace or adjust packing material to control leak.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2020
Resolved 18 November 2020
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 4 September 2019
Resolved
Grind out weeping FRP on portside of keel near engine cooling water intakes and repair.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 September 2019
Resolved 11 September 2019
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 3 June 2019
Resolved
Install new all-round white anchor light. Vessel restricted to daytime operations.
46 CFR 183.420
Action required: 705 - Other - as specified
Resolved 3 June 2019
Resolution: Captain sent picture via email showing the anchor light illuminated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 June 2019
Resolved
Mark locations of fuel shut off valves.
46 CFR 185.608
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 June 2019
Resolution: Captain sent picture via email showing that the fuel shutoff valves have been properly labeled.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 6 June 2018
Resolved
Waterlight on ring buoy battery was expired.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 June 2018
Resolved 6 June 2018
Resolution: Replaced battery.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 31 May 2017
Resolved
Replace hose clamps on each end of the fuel hill hose.
Action required: 705 - Other - as specified
Due 14 June 2017
Resolved 1 June 2017
Resolution: Received e-mailed photographs of newly installed double hose clamps on fuel fill hose.
Stability › Watertight Integrity › Coaming
Issued 31 May 2017
Resolved
Make engine room hatches watertight (watertight combing needs to be replaced).
Action required: 705 - Other - as specified
Due 14 June 2017
Resolved 1 June 2017
Resolution: Received e-mailed photographs of newly installed watertight coaming on engine room hatch.
Construction/Loadline › Hull › Bottom Plating
Issued 14 June 2016
Resolved
Vessel has 2 new main engine that require new thru hull intakes for sea water, must provide lay-up plan, type of resin and material used.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2016
Construction/Loadline › Hull › Bottom Plating
Issued 14 June 2016
Resolved
Vessel has 2 new thru hull shaft penetrations and must provide lay-up plan, type of material and resin used for approval to CGMI
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 14 June 2016
Resolved
Vessel's fwd stbd outboard new engine mount is not welded and must be repaired.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2016
Documentation › Certificates/Documents › Certificate of Inspection
Issued 14 June 2016
Resolved
Vessel had missed the COI inspection due on 03May2016, must conduct COI inspection prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2016
Stability › Incline Test › General
Issued 14 June 2016
Resolved
Vessel must conduct a new stability test PTCP
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2016
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 14 June 2016
Resolved
Vessel's prop's are at the shop and not available for inspection, must make available for inspection PTCDD
Action required: 705 - Other - as specified
Resolved 16 June 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 8 April 2016
Resolved
Prove proper operation of stbd main engine to the satisfaction of the attending USCG marine inspector.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2016
Resolution: Inspection of all systems completed