CHIPOLBROK MOON is a 2004 public freight. The Coast Guard has recorded 30 inspections since 2005, most recently in March 2025, along with 9 deficiencies and 8 operational controls.

Records from 2005 to 2025. Most recent: inspection, 11 March 2025.

Built
2004
Last inspected
11 March 2025
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9272216 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
764364
Flag
HONG KONG
—
Maury page id
psix-764364

Inspections, by type

…with no type recorded14
Years with a record 12 calendar years (2005–2025)
The 30 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it24167 - Convention (Subpart B), Gross Ton
10714 - Convention (Subpart B), Net Ton
30460 - Dead Weight, Metric Ton
43519 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 30

11 March 2025 PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8089524
6 March 2025 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8089507
19 September 2024 PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8001697
9 October 2023 PSC B · Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7805562
18 February 2023 Damage Survey · PSC B · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7639087
18 February 2023 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7672357
10 August 2021 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7276034
27 December 2019 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 6876378
19 December 2019 Administrative Inspection
Administrative · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 6876672
4 June 2018 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6433849
31 May 2018 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6430260
23 May 2018 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6421282
23 May 2018 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6635990
9 January 2012 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4221550
27 December 2010 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3916558
23 July 2009 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3543170
15 March 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3610156
6 November 2008 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3358594
2 October 2008 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3335131
4 February 2008 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3141766
29 January 2008 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3138751
18 July 2006 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2716655
15 July 2006 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2713259
11 July 2006 Ballast Water Examination · MARPOL Annex V Examination · ISPS II Exam · PII Safety Exam · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2708966
10 July 2006 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2708226
9 July 2006 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2706542
4 November 2005 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2542528
8 July 2005 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2422743
2 July 2005 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2417770
2 June 2005 Ballast Water Examination · MARPOL Annex I Examination · ISPS I Exam · PI Safety Exam · MARPOL Annex V Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2408759

Deficiency record · 9

09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 9 October 2023 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship and its equipment are fit to proceed to see without danger to the ship or persons on board. PSCO observed the front cover of the electrical panel for VDM/CCM removed and a fabricated ventilation system installed to prevent the system from overheating. Additionally, observed discrepancy between the temperature gauges for exhaust gas located on the main engine,and at the remote display located in the engine control room. 74SOLAS(20)1/11(a)
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 11 October 2023
Resolution: CCS provided report No. HT23SS00042 attesting to rectification. Specifically, ventilation has been removed, cover reinstalled, and temperature guages cleaned ensuring operation.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 9 October 2023 Resolved
All electrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in the normal manner. PSCO identified exposed 220v wire inside deteriorated reefer container connection box. Additionally, multiple 220v connections on the starboard side cargo holds were found uncapped and in boxes with deteriorated seals and cable penetrations. 74SOLAS(04)II-I/45.1.3
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 October 2023
Resolution: CCS provided report No. HT23SS00042 attesting to rectification. Specifically, 220v connection boxes repaired in working condition.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 18 February 2023 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. At appr. 0820 local, PSCO received notification that the vessel experienced an issue with its air pressure control system when inbound to its anchorage.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 18 February 2023
Resolution: Class report submitted attesting to the rectification of the noted deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 December 2019 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service which they are intended, and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO's found a pinhole leak in the sea valve cooling pipe for anchor hydraulic pumping system. -SOLAS(04)II-1/26.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 December 2019
Resolution: Received class report attesting to the repairs, all sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 23 May 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulation to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel suffered a fire in port side cargo hold #3. Vessel crew closed ventilation to cargo hold#3 and discharged 59 bottles from the ships fixed CO2 system. the extent of the damage caused by the fire is unknown. 74SOLAS(14)I/11
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 May 2018
Resolution: Reviewed CCS class report stating no damage was found in the cargo hold and C02 bottles have been recharged/replaced. Attached class report to vessel documents.
Documentation › Safety Management System › Response Measures Documentation
Issued 23 May 2018 Resolved
The company should ensure that all personnel involved in the company's safety management system have an adequate understanding of relevant rules regulations codes and guidelines. In ref to ship and shore contingency plan 33CFR160.216 and the below deficiency; vessel failed to immediately report or cause to be immediately reported a hazardous condition had occurred on board. 74SOLAS(14)IX/5 ISM A/6.4
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2018
Resolved 4 June 2018
Resolution: SEC HOU-GAL PSC Branch received proper documentation satisfying the requirement.
Documentation › Safety Management System › Response Measures Documentation
Issued 23 May 2018 Resolved
Whenever there is a hazardous condition either on board a vessel or caused by a vessel or its operation the owner, agent, master, operator, or person in charge must immediately notify the nearest Coast Guard Sector office or Group office and in addition submit any report required by 46CFR4.05-10. Vessel suffered a fire in cargo hold#3 on 23MAY18 at 0012. No notification was made until 0800 failing to immediately report or caused to be reported. 33CFR160.216
Action required: 10 - Deficiency Rectified
Resolved 23 May 2018
Resolution: Coast Guard notified.
Construction/Loadline › Hull › Hull Plating
Issued 29 January 2008 Resolved
Hull Plating - Unknown Cause/Condition
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 January 2008
Resolution: Vessel submitted a CLASS Report stating the type and extent of damage.
Engineering › Diesel Engine (propulsion-direct drive) › Distributor (fuel injection)
Issued 18 July 2006 Resolved
Vessel suffered reduction in power. Master to attest to proper operation of the main engines.
Action required: 705 - Other - as specified
Resolved 20 July 2006
Resolution: Master attested to operation of the main engines.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.